Virginia / 2026 Regular Session

2026 Regular Session · Imported snapshot

SB834: Virginia Solar Energy and Battery Energy Storage Systems Grant Program; established.

failed committee

<b>Virginia Solar Energy and Battery Energy Storage Systems Grant Program.</b> Establishes the Virginia Solar Energy and Battery Energy Storage Systems Grant Program (the Program), subject to appropriation by the General Assembly, for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the Program; and (iii) determining which items and services are considered eligible project costs for a given qualified project, as defined in the bill. The bill provides requirements for what can be considered a qualified solar energy and short duration battery energy storage project based on whether the use of such project is for a residential, commercial and industrial, or utility-scale project. Finally, the bill directs the Department of Energy to monitor allocation of the grant awards and maintain a public dashboard displaying certain information on the solar energy and short duration battery energy storage installations.

Official bill page · Source: Richmond Sunlight

Ask about SB834

Full bill text

Version SB834S1 · 2026-02-09

Full text

Changes in this version: added text deleted text

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered 45.2-1918 through 45.2-1922, as follows:

Article 4.

Virginia Solar Energy and Battery Energy Storage Systems Grant Program.

§ 45.2-1918. Definitions.

As used in this article, unless the context requires a different meaning:

"Eligible project costs" means (i) for residential projects, costs incurred for the construction, installation, or purchase of qualifying solar energy equipment or qualifying energy storage resources, including labor costs incurred for installation and electrical integration and costs incurred for permitting, inspection, engineering, and system design services necessary for such project; (ii) for commercial and industrial projects, costs incurred for such project that would otherwise be eligible for residential projects, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection application fees, project-specific legal and financial services, site preparation, purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switchgear, and transformer installation necessary for grid compliance; and (iii) for utility-scale projects, costs incurred for such project that would otherwise be eligible for commercial and industrial projects and high-voltage interconnection and substation construction, transmission-level engineering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. "Eligible project costs" includes only costs directly associated with energy generation, storage, and grid integration. "Eligible project costs" does not include land acquisition unrelated to system operation, or, where the project is not completed, general property improvements, renovations, or unrelated construction; transmission upgrades not directly attributable to project interconnection; costs associated with speculative land banking or site prospecting without approved interconnection plans; legal fees, lobbying, or administrative costs unrelated to project execution; backup generators, fossil fuel systems, or hybrid diesel-photovoltaic integrations; energy efficiency upgrades such as insulation or lighting; heating, ventilation, and air conditioning (HVAC) unless integrated with a solar and storage project and separately itemized; or any leased residential systems.

"Qualified commercial and industrial project" means a short duration battery energy storage project added to an existing facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1920; (ii) that began construction on or after July 1, 2026; and (iii) used for commercial or industrial use as determined by the customer rate class used to determine billing related to such project.

"Qualified project" means a qualified commercial and industrial project, qualified residential project, or a qualified utility-scale project.

"Qualified residential project" means a new solar energy and short duration battery energy storage project or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1919; (ii) in service on or after July 1, 2026; and (iii) used for residential purposes as determined by the customer rate class used to determine billing related to such project.

"Qualified utility-scale project" means a short duration battery energy storage project added to an existing solar facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1920; (ii) that began construction on or after July 1, 2026; and (iii) used for utility-scale use as determined by the customer rate class used to determine billing related to such project.

"Short duration battery energy storage project" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored. "Solar energy project" means the installation of a system of components designed to convert solar radiation into useable thermal or electrical energy.

§ 45.2-1919. Qualified residential project requirements.

A. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified residential projects for the purposes of a grant award pursuant to § 45.2-1922. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified residential project, the following conditions shall be met:

1. The project is fully operational and installed in the Commonwealth by the time specified in subdivision 2;

2. The project is in service on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and

3. The energy storage portion of the project provides a minimum storage duration of up to two hours.

B. No solar energy and short duration battery energy storage project shall receive a grant award pursuant to § 45.2-1922 without approval by the Department pursuant to this section.

§ 45.2-1920. Qualified commercial, industrial, and utility-scale project requirements.

A. The Department shall evaluate and approve short duration battery energy storage projects as qualified commercial and industrial projects for the purposes of a grant award pursuant to § 45.2-1922. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified commercial and industrial project, the following conditions shall be met:

1. The project is fully operational and have begun construction in the Commonwealth by the time specified in subdivision 2;

2. The project has begun construction on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and

3. The energy storage portion of the project provides a minimum storage duration of up to four hours. The Department shall also evaluate and approve such qualified commercial and industrial projects pursuant to this subsection based upon the applicant's willingness to opt into the State Corporation Commission's virtual power plant pilot program established in § 56-585.1:16.

B. The Department shall evaluate and approve short duration battery energy storage projects as qualified utility-scale projects for the purposes of the grant program established by § 45.2-1922. To receive approval as a qualified utility-scale project, the conditions listed in subdivisions A 1, 2, and 3 shall be met. The Department shall evaluate the applicant's ability to reduce electric utility costs for ratepayers or the applicant's willingness to opt into demand response or virtual power plant programs.

C. No solar energy and short duration battery energy storage project shall receive a grant award pursuant to § 45.2-1922 without approval by the Department pursuant to this section.

§ 45.2-1921. Regional uptake dashboard for approved solar energy and short duration battery energy storage projects; reports.

A. The Department shall monitor allocation of the grant awards in § 45.2-1922 and publish quarterly transparency reports summarizing such allocation.

B. The Department shall maintain a public dashboard displaying regional uptake, demographic distribution such as low-to-moderate income and non-low-to-moderate income data, and sectoral progress toward allocated targets.

§ 45.2-1922. Virginia Solar Energy and Battery Energy Storage Systems Grant Program.

A. Subject to appropriation by the General Assembly, the Department shall establish the Virginia Solar Energy and Battery Energy Storage Systems Grant Program (the Program) for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the Program; and (iii) determining which items and services are considered eligible project costs for a given qualified project. The Department may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the Department deems appropriate.

B. The Department shall award applicants a grant in an amount equal to:

1. For a residential qualified project, 35 percent of eligible project costs, not to exceed $6,000.

2. For a commercial and industrial qualified project, 35 percent of eligible project costs.

3. For a utility-scale qualified project, 35 percent of eligible project costs.

C. The Department shall prioritize awarding grants to applicants that did not receive an award pursuant to the Program in the previous fiscal year. No applicant shall receive more than one grant per fiscal year. In order to apply for a grant, an applicant shall submit an application to the Department that shall include any invoices or purchase receipts for eligible project costs and (ii) a description of the projects for which eligible costs were incurred.

D. The aggregate amount of grants allowed under this section shall not exceed the amount appropriated by the General Assembly for the Program during the applicable budget cycle, with 25 percent allocated for qualified residential projects and 75 percent allocated for qualified commercial and industrial projects and qualified utility-scale projects. Grants shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department. If, after nine months from the start of the taxable year, the Department determines that the amounts reserved for a given qualified project are unlikely to be fully allocated, the Department may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the amount appropriated by the General Assembly for the Program.

E. To qualify for a grant under this section, a project shall be installed in compliance with this article.

1. Once the applicant has satisfied all the requirements to the satisfaction of the Department, the Department shall provide the applicant with a certificate of approval for a qualified project, identifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include the amount of eligible costs incurred and the fiscal year in which such costs were incurred for which the applicant may apply for a grant pursuant to this section.

2. The applicant shall retain all proof of cost documentation, including invoices and scope of work, and any certificate of approval for a qualified project received pursuant to subdivision 1 for at least five years from the receipt of such certificate.

F. The Department shall develop guidelines for the administration of the Program, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section. Such guidelines shall be exempt from the provisions of the Administrative Process Act (§ 2.2-4000 et seq.).

Legislative actions

2026-03-09 · history

Tabled in Appropriations (22-Y 0-N)

2026-02-10 · history

Read second time

2026-02-23 · history

Subcommittee recommends referring to Appropriations(Voice Vote)

2026-02-09 · history

Committee substitute printed 26107347D-S1

2026-02-17 · history

Read first time

2026-01-27 · history

Referred to Committee on Finance and Appropriations

2026-02-10 · history

Engrossed by Senate - committee substitute (Voice Vote)

2026-03-09 · history

Tabled in Appropriations

2026-02-09 · history

Constitutional reading dispensed Block Vote (on 1st reading) (40-Y 0-N 0-A)

2026-02-09 · history

Rules suspended

2026-02-17 · history

Referred to Committee on Finance

2026-02-17 · history

Read first time

2026-02-10 · history

Engrossed by Senate (Voice Vote)

2026-02-17 · history

Placed on Calendar

2026-02-05 · history

Reported from Finance and Appropriations with substitute

2026-02-09 · history

Passed by for the day Block Vote (Voice Vote)

2026-02-20 · history

Assigned HFIN sub: Subcommittee #1

2026-02-11 · history

Read third time and passed Senate (21-Y 19-N 0-A)

2026-02-05 · history

Reported from Finance and Appropriations with substitute (10-Y 5-N)

2026-02-10 · history

Finance and Appropriations Substitute agreed to

2026-02-10 · history

Engrossed by Senate - committee substitute

2026-02-25 · history

Referred from Finance and referred to Appropriations (21-Y 0-N)

2026-02-23 · history

Fiscal Impact Statement from Department of Planning and Budget (SB834)

2026-01-27 · history

Presented and ordered printed 26105850D

2026-02-10 · history

Committee substitute agreed to (Voice Vote)

2026-02-27 · history

Assigned HAPP sub: Commerce Agriculture & Natural Resources

2026-01-27 · history

Unanimous consent to introduce

2026-02-09 · history

Passed by for the day

Raw source record
{
    "id": 86124,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb834\/",
    "tags": {
        "154395": "energy",
        "154396": "solar energy",
        "154397": "tax credit",
        "154398": "battery storage",
        "154399": "department of energy",
        "154400": "transparency"
    },
    "text": [
        {
            "date": "2026-01-27",
            "number": "SB834",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb834.pdf"
        },
        {
            "date": "2026-02-09",
            "number": "SB834S1"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "sb834",
    "patron": "Jones, Michael",
    "status": "failed committee",
    "chamber": "senate",
    "changes": null,
    "outcome": "failed",
    "related": [
        {
            "id": 85034,
            "name": "Finance",
            "year": 2026,
            "count": 3,
            "number": "hb1133",
            "status": "failed committee",
            "catch_line": "Virginia Solar Energy and Battery Energy Storage Systems Program; established.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 85360,
            "name": "Finance",
            "year": 2026,
            "count": 2,
            "number": "sb382",
            "status": "signed by governor",
            "catch_line": "Smart Solar Permitting Platform; established, residential solar energy systems.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84909,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 2,
            "number": "sb249",
            "status": "signed by governor",
            "catch_line": "Electric utilities; definitions, integrated resource plans, report.",
            "date_introduced": "January 12, 2026"
        },
        {
            "id": 85945,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 2,
            "number": "hb1439",
            "status": "signed by governor",
            "catch_line": "Contractors; regulation, solar installation companies, sale, lease, etc., of solar energy systems.",
            "date_introduced": "January 22, 2026"
        },
        {
            "id": 84597,
            "name": "Finance",
            "year": 2026,
            "count": 2,
            "number": "hb760",
            "status": "failed committee",
            "catch_line": "Income tax, state; energy-efficient homes tax credits.",
            "date_introduced": "January 13, 2026"
        }
    ],
    "summary": "<b>Virginia Solar Energy and Battery Energy Storage Systems Grant Program.<\/b> Establishes the Virginia Solar Energy and Battery Energy Storage Systems Grant Program (the Program), subject to appropriation by the General Assembly, for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the Program; and (iii) determining which items and services are considered eligible project costs for a given qualified project, as defined in the bill. The bill provides requirements for what can be considered a qualified solar energy and short duration battery energy storage project based on whether the use of such project is for a residential, commercial and industrial, or utility-scale project. Finally, the bill directs the Department of Energy to monitor allocation of the grant awards and maintain a public dashboard displaying certain information on the solar energy and short duration battery energy storage installations.",
    "version": "SB834S1",
    "copatron": null,
    "committee": "Appropriations",
    "full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> through <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>, as follows:<\/p>\n<p class=textctr><ins>Article <\/ins><ins>4<\/ins><ins>.<\/ins><\/p>\n<p class=textctr><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a><\/ins><ins>. <\/ins><ins>Definitions.<\/ins><\/p>\n<p class=section><ins>As used in this article, unless the context requires a different meaning:<\/ins><\/p>\n<p class=section><ins>\"Eligible project costs\" means (i) for residential projects, costs incurred for the construction, installation, or purchase of qualifying solar energy equipment or qualifying energy storage resources, including labor costs incurred for installation and electrical integration and costs incurred for permitting, inspection, engineering, and system design services necessary for such project; (ii) for commercial and industrial projects, costs incurred for such project that would otherwise be eligible for residential projects, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection application fees, project-specific legal and financial services, site preparation, purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switchgear, and transformer installation necessary for grid compliance; and (iii) for utility-scale projects, costs incurred for such project that would otherwise be eligible for commercial and industrial projects and high-voltage interconnection and substation construction, transmission-level engineering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. \"Eligible project costs\" includes only costs directly associated with energy generation, storage, and grid integration. \"Eligible project costs\" does not include land acquisition unrelated to system operation, or<\/ins><ins>,<\/ins><ins> where the project is not completed, general property improvements, renovations, or unrelated construction; transmission upgrades not directly attributable to project interconnection; costs associated with speculative land banking or site prospecting without approved interconnection plans; legal fees, lobbying, or administrative costs unrelated to project execution; backup generators, fossil fuel systems, or hybrid diesel<\/ins><ins>-<\/ins><ins>photovoltaic integrations; energy efficiency upgrades such as insulation or lighting; heating, ventilation, and air conditioning (HVAC) unless integrated with a solar and storage project and separately itemized; or any leased residential systems.<\/ins><\/p>\n<p class=section><ins>\"Qualified commercial and industrial project\" means a short duration battery energy storage project added to an existing facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; (ii) that began construction on or after July 1, 2026; and (iii) used for commercial or industrial use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Qualified project\" means a qualified commercial and industrial project, qualified residential project, or a qualified utility-scale project.<\/ins><\/p>\n<p class=section><ins>\"Qualified residential project\" means a new solar energy and short duration battery energy storage project or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-19\/'>45.2-19<\/a><\/ins><ins>19<\/ins><ins>; (ii) in service on or after July 1, 2026; and (iii) used for residential purposes as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Qualified utility-scale project\" means a short duration battery energy storage project added to an existing solar facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; (ii) that began construction on or after July 1, 2026; and (iii) used for utility-scale use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Short duration battery energy storage project\" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored. \"Solar energy project\" means the installation of a system of components designed to convert solar radiation into useable thermal or electrical energy.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1919\/'>45.2-1919<\/a>.<\/ins><ins> Qualified residential project requirements.<\/ins><\/p>\n<p class=section><ins>A. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified residential projects for the purposes of <\/ins><ins>a grant award pursuant to <\/ins><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified residential project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project <\/ins><ins>is<\/ins><ins> fully operational and installed in the Commonwealth by the time specified in subdivision 2;<\/ins><\/p>\n<p class=section><ins>2. The project is in service on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and<\/ins><\/p>\n<p class=section><ins>3. The energy storage portion of the project provides a minimum storage duration of up to two hours.<\/ins><\/p>\n<p class=section><ins>B. No solar energy and short duration battery energy storage project shall receive a <\/ins><ins>grant award<\/ins><ins> pursuant to \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1920\/'>45.2-1920<\/a>.<\/ins><ins> Qualified commercial, industrial, and utility-scale project requirements.<\/ins><\/p>\n<p class=section><ins>A. The Department shall evaluate and approve short duration battery energy storage projects as qualified commercial and industrial projects for the purposes of <\/ins><ins>a grant award<\/ins><ins> <\/ins><ins>pursuant to<\/ins><ins> \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified commercial and industrial project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project <\/ins><ins>is<\/ins><ins> fully operational and have begun construction in the Commonwealth by the time specified in subdivision 2;<\/ins><\/p>\n<p class=section><ins>2. The project has begun construction on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and<\/ins><\/p>\n<p class=section><ins>3. The energy storage portion of the project provides a minimum storage duration of up to four hours. The Department shall also evaluate and approve such qualified commercial and industrial projects pursuant to this subsection based upon the applicant's willingness to opt in<\/ins><ins>to<\/ins><ins> the State Corporation Commission's virtual power plant pilot program established in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a>.<\/ins><\/p>\n<p class=section><ins>B. The Department shall evaluate and approve short duration battery energy storage projects as qualified utility-scale projects for the purposes of the <\/ins><ins>grant program established by<\/ins><ins> \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. To receive approval as a qualified utility-scale project, the conditions listed in subdivisions A 1, 2, and 3 shall be met. The Department shall evaluate the applicant's ability to reduce electric utility costs for ratepayers or the applicant's willingness to opt into demand response or virtual power plant programs.<\/ins><\/p>\n<p class=section><ins>C. No solar energy and short duration battery energy storage project shall receive a <\/ins><ins>grant award<\/ins><ins> pursuant to \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1921\/'>45.2-1921<\/a>.<\/ins><ins> Regional uptake dashboard for approved solar energy and short duration battery energy storage projects; reports.<\/ins><\/p>\n<p class=section><ins>A. The Department shall monitor allocation of the <\/ins><ins>grant awards<\/ins><ins> in \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>and publish quarterly transparency reports summarizing such allocation.<\/ins><\/p>\n<p class=section><ins>B. The Department shall maintain a public dashboard displaying regional uptake, demographic distribution such as low-to-moderate income and non-low-to-moderate income data, and sectoral progress toward allocated targets.<\/ins><\/p>\n<p class=catchln><ins>\u00a7<\/ins><ins> <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>. <\/ins><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program.<\/ins><\/p>\n<p class=section><ins>A<\/ins><ins>. <\/ins><ins>Subject to appropriation by the General Assembly<\/ins><ins>, t<\/ins><ins>he Department shall establish the <\/ins><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program<\/ins><ins> (<\/ins><ins>the <\/ins><ins>Program) <\/ins><ins>for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of <\/ins><ins>the Program<\/ins><ins>; and (iii) determining which items and services are considered eligible project costs for a given qualified project.<\/ins><ins> The Department may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the Department deems appropriate.<\/ins><\/p>\n<p class=section><ins>B<\/ins><ins>.<\/ins><ins> <\/ins><ins>T<\/ins><ins>he Department shall award <\/ins><ins>applicants<\/ins><ins> <\/ins><ins>a <\/ins><ins>grant <\/ins><ins>in an amount equal to<\/ins><ins>:<\/ins><\/p>\n<p class=section><ins>1. For a residential qualified project, 35 percent of eligible project costs, not to exceed $6,000.<\/ins><\/p>\n<p class=section><ins>2. For a commercial and industrial qualified project, 35 percent of eligible project costs.<\/ins><\/p>\n<p class=section><ins>3. For a utility-scale qualified project, 35 percent of eligible project costs.<\/ins><\/p>\n<p class=section><ins>C<\/ins><ins>. T<\/ins><ins>he Department shall prioritize awarding grants to <\/ins><ins>applicants<\/ins><ins> that did not receive an award pursuant to the Program in the previous fiscal year. No <\/ins><ins>applicant<\/ins><ins> shall receive more than one grant per fiscal year. <\/ins><ins>In order to apply for a grant,<\/ins><ins> an<\/ins><ins> <\/ins><ins>applicant<\/ins><ins> <\/ins><ins>shall submit an application to the Department <\/ins><ins>t<\/ins><ins>h<\/ins><ins>at<\/ins><ins> shall include <\/ins><ins>any invoices or purchase receipts for eligible project costs<\/ins><ins> and (ii) <\/ins><ins>a description of the projects for which eligible costs were incurred<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>D. The aggregate amount of <\/ins><ins>grants<\/ins><ins> allowed under this section shall not <\/ins><ins>exceed the<\/ins><ins> amount appropriated by the General Assembly<\/ins><ins> for the Program<\/ins><ins> during the applicable budget cycle, with 25 percent allocated for qualified residential projects and 75 percent allocated for qualified commercial and industrial projects and qualified utility-scale projects. <\/ins><ins>Grants<\/ins><ins> shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department. If, after nine months from the start of the taxable year, the Department determines that the amounts reserved for a given qualified project are unlikely to be fully allocated, the Department may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the <\/ins><ins>amount appropriated by the General Assembly for the Program<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>E. To qualify for <\/ins><ins>a grant<\/ins><ins> under this section, a project shall be installed in compliance with <\/ins><ins>this <\/ins><ins>a<\/ins><ins>rticle<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>1. Once the <\/ins><ins>applicant<\/ins><ins> has satisfied all the requirements to the satisfaction of the Department, the Department shall provide the <\/ins><ins>applicant<\/ins><ins> with a certificate of approval for a qualified project, identifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include the amount of eligible costs incurred and the fiscal year in which such costs were incurred for which the <\/ins><ins>applicant<\/ins><ins> may <\/ins><ins>apply for<\/ins><ins> a <\/ins><ins>grant<\/ins><ins> pursuant to this section.<\/ins><\/p>\n<p class=section><ins>2. The <\/ins><ins>applicant<\/ins><ins> shall retain all proof of cost documentation, including invoices and scope of work, and any certificate of approval for a qualified project received pursuant to subdivision 1 for at least five years from the receipt of such certificate.<\/ins><\/p>\n<p class=section><ins>F<\/ins><ins>. The <\/ins><ins>Department<\/ins><ins> shall develop guidelines<\/ins><ins> for the administration of the Program<\/ins><ins>, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section. Such guidelines shall be exempt from the provisions of the Administrative Process Act (\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/2.2-4000\/'>2.2-4000<\/a> et seq.).<\/ins><\/p>",
    "catch_line": "Virginia Solar Energy and Battery Energy Storage Systems Grant Program; established.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 2340,
    "patron_party": "D",
    "patron_place": "Richmond",
    "summary_hash": "355a7dd0148f997e849b40bf74d37280",
    "patron_prefix": "Del.",
    "patron_suffix": "(D-Richmond)",
    "status_detail": "failed committee",
    "_rsun_versions": [
        {
            "id": "851da994817910fe23aa90d31ece7d414a45418bcaf9f7f8cf933426f4ba78fe",
            "code": "SB834S1",
            "bill_id": 86124,
            "source_url": null,
            "source_date": "2026-02-09",
            "source_hash": "f6b0abfa0c1c8899118cb72a9f77aff7fc79503b3d371b1ea79fa23a0c540c86",
            "source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> through <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>, as follows:<\/p>\n<p class=textctr><ins>Article <\/ins><ins>4<\/ins><ins>.<\/ins><\/p>\n<p class=textctr><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a><\/ins><ins>. <\/ins><ins>Definitions.<\/ins><\/p>\n<p class=section><ins>As used in this article, unless the context requires a different meaning:<\/ins><\/p>\n<p class=section><ins>\"Eligible project costs\" means (i) for residential projects, costs incurred for the construction, installation, or purchase of qualifying solar energy equipment or qualifying energy storage resources, including labor costs incurred for installation and electrical integration and costs incurred for permitting, inspection, engineering, and system design services necessary for such project; (ii) for commercial and industrial projects, costs incurred for such project that would otherwise be eligible for residential projects, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection application fees, project-specific legal and financial services, site preparation, purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switchgear, and transformer installation necessary for grid compliance; and (iii) for utility-scale projects, costs incurred for such project that would otherwise be eligible for commercial and industrial projects and high-voltage interconnection and substation construction, transmission-level engineering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. \"Eligible project costs\" includes only costs directly associated with energy generation, storage, and grid integration. \"Eligible project costs\" does not include land acquisition unrelated to system operation, or<\/ins><ins>,<\/ins><ins> where the project is not completed, general property improvements, renovations, or unrelated construction; transmission upgrades not directly attributable to project interconnection; costs associated with speculative land banking or site prospecting without approved interconnection plans; legal fees, lobbying, or administrative costs unrelated to project execution; backup generators, fossil fuel systems, or hybrid diesel<\/ins><ins>-<\/ins><ins>photovoltaic integrations; energy efficiency upgrades such as insulation or lighting; heating, ventilation, and air conditioning (HVAC) unless integrated with a solar and storage project and separately itemized; or any leased residential systems.<\/ins><\/p>\n<p class=section><ins>\"Qualified commercial and industrial project\" means a short duration battery energy storage project added to an existing facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; (ii) that began construction on or after July 1, 2026; and (iii) used for commercial or industrial use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Qualified project\" means a qualified commercial and industrial project, qualified residential project, or a qualified utility-scale project.<\/ins><\/p>\n<p class=section><ins>\"Qualified residential project\" means a new solar energy and short duration battery energy storage project or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-19\/'>45.2-19<\/a><\/ins><ins>19<\/ins><ins>; (ii) in service on or after July 1, 2026; and (iii) used for residential purposes as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Qualified utility-scale project\" means a short duration battery energy storage project added to an existing solar facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; (ii) that began construction on or after July 1, 2026; and (iii) used for utility-scale use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Short duration battery energy storage project\" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored. \"Solar energy project\" means the installation of a system of components designed to convert solar radiation into useable thermal or electrical energy.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1919\/'>45.2-1919<\/a>.<\/ins><ins> Qualified residential project requirements.<\/ins><\/p>\n<p class=section><ins>A. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified residential projects for the purposes of <\/ins><ins>a grant award pursuant to <\/ins><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified residential project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project <\/ins><ins>is<\/ins><ins> fully operational and installed in the Commonwealth by the time specified in subdivision 2;<\/ins><\/p>\n<p class=section><ins>2. The project is in service on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and<\/ins><\/p>\n<p class=section><ins>3. The energy storage portion of the project provides a minimum storage duration of up to two hours.<\/ins><\/p>\n<p class=section><ins>B. No solar energy and short duration battery energy storage project shall receive a <\/ins><ins>grant award<\/ins><ins> pursuant to \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1920\/'>45.2-1920<\/a>.<\/ins><ins> Qualified commercial, industrial, and utility-scale project requirements.<\/ins><\/p>\n<p class=section><ins>A. The Department shall evaluate and approve short duration battery energy storage projects as qualified commercial and industrial projects for the purposes of <\/ins><ins>a grant award<\/ins><ins> <\/ins><ins>pursuant to<\/ins><ins> \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. The Department shall evaluate the applicant's willingness to opt into demand response or virtual power plant programs. To receive approval as a qualified commercial and industrial project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project <\/ins><ins>is<\/ins><ins> fully operational and have begun construction in the Commonwealth by the time specified in subdivision 2;<\/ins><\/p>\n<p class=section><ins>2. The project has begun construction on or after July 1, 2026 and construction is certified to be completed within five years of the date on which construction began; and<\/ins><\/p>\n<p class=section><ins>3. The energy storage portion of the project provides a minimum storage duration of up to four hours. The Department shall also evaluate and approve such qualified commercial and industrial projects pursuant to this subsection based upon the applicant's willingness to opt in<\/ins><ins>to<\/ins><ins> the State Corporation Commission's virtual power plant pilot program established in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a>.<\/ins><\/p>\n<p class=section><ins>B. The Department shall evaluate and approve short duration battery energy storage projects as qualified utility-scale projects for the purposes of the <\/ins><ins>grant program established by<\/ins><ins> \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a><\/ins><ins>. To receive approval as a qualified utility-scale project, the conditions listed in subdivisions A 1, 2, and 3 shall be met. The Department shall evaluate the applicant's ability to reduce electric utility costs for ratepayers or the applicant's willingness to opt into demand response or virtual power plant programs.<\/ins><\/p>\n<p class=section><ins>C. No solar energy and short duration battery energy storage project shall receive a <\/ins><ins>grant award<\/ins><ins> pursuant to \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1921\/'>45.2-1921<\/a>.<\/ins><ins> Regional uptake dashboard for approved solar energy and short duration battery energy storage projects; reports.<\/ins><\/p>\n<p class=section><ins>A. The Department shall monitor allocation of the <\/ins><ins>grant awards<\/ins><ins> in \u00a7 <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a> <\/ins><ins>and publish quarterly transparency reports summarizing such allocation.<\/ins><\/p>\n<p class=section><ins>B. The Department shall maintain a public dashboard displaying regional uptake, demographic distribution such as low-to-moderate income and non-low-to-moderate income data, and sectoral progress toward allocated targets.<\/ins><\/p>\n<p class=catchln><ins>\u00a7<\/ins><ins> <\/ins><ins><a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>. <\/ins><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program.<\/ins><\/p>\n<p class=section><ins>A<\/ins><ins>. <\/ins><ins>Subject to appropriation by the General Assembly<\/ins><ins>, t<\/ins><ins>he Department shall establish the <\/ins><ins>Virginia Solar Energy and Battery Energy Storage Systems Grant Program<\/ins><ins> (<\/ins><ins>the <\/ins><ins>Program) <\/ins><ins>for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of <\/ins><ins>the Program<\/ins><ins>; and (iii) determining which items and services are considered eligible project costs for a given qualified project.<\/ins><ins> The Department may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the Department deems appropriate.<\/ins><\/p>\n<p class=section><ins>B<\/ins><ins>.<\/ins><ins> <\/ins><ins>T<\/ins><ins>he Department shall award <\/ins><ins>applicants<\/ins><ins> <\/ins><ins>a <\/ins><ins>grant <\/ins><ins>in an amount equal to<\/ins><ins>:<\/ins><\/p>\n<p class=section><ins>1. For a residential qualified project, 35 percent of eligible project costs, not to exceed $6,000.<\/ins><\/p>\n<p class=section><ins>2. For a commercial and industrial qualified project, 35 percent of eligible project costs.<\/ins><\/p>\n<p class=section><ins>3. For a utility-scale qualified project, 35 percent of eligible project costs.<\/ins><\/p>\n<p class=section><ins>C<\/ins><ins>. T<\/ins><ins>he Department shall prioritize awarding grants to <\/ins><ins>applicants<\/ins><ins> that did not receive an award pursuant to the Program in the previous fiscal year. No <\/ins><ins>applicant<\/ins><ins> shall receive more than one grant per fiscal year. <\/ins><ins>In order to apply for a grant,<\/ins><ins> an<\/ins><ins> <\/ins><ins>applicant<\/ins><ins> <\/ins><ins>shall submit an application to the Department <\/ins><ins>t<\/ins><ins>h<\/ins><ins>at<\/ins><ins> shall include <\/ins><ins>any invoices or purchase receipts for eligible project costs<\/ins><ins> and (ii) <\/ins><ins>a description of the projects for which eligible costs were incurred<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>D. The aggregate amount of <\/ins><ins>grants<\/ins><ins> allowed under this section shall not <\/ins><ins>exceed the<\/ins><ins> amount appropriated by the General Assembly<\/ins><ins> for the Program<\/ins><ins> during the applicable budget cycle, with 25 percent allocated for qualified residential projects and 75 percent allocated for qualified commercial and industrial projects and qualified utility-scale projects. <\/ins><ins>Grants<\/ins><ins> shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department. If, after nine months from the start of the taxable year, the Department determines that the amounts reserved for a given qualified project are unlikely to be fully allocated, the Department may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the <\/ins><ins>amount appropriated by the General Assembly for the Program<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>E. To qualify for <\/ins><ins>a grant<\/ins><ins> under this section, a project shall be installed in compliance with <\/ins><ins>this <\/ins><ins>a<\/ins><ins>rticle<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>1. Once the <\/ins><ins>applicant<\/ins><ins> has satisfied all the requirements to the satisfaction of the Department, the Department shall provide the <\/ins><ins>applicant<\/ins><ins> with a certificate of approval for a qualified project, identifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include the amount of eligible costs incurred and the fiscal year in which such costs were incurred for which the <\/ins><ins>applicant<\/ins><ins> may <\/ins><ins>apply for<\/ins><ins> a <\/ins><ins>grant<\/ins><ins> pursuant to this section.<\/ins><\/p>\n<p class=section><ins>2. The <\/ins><ins>applicant<\/ins><ins> shall retain all proof of cost documentation, including invoices and scope of work, and any certificate of approval for a qualified project received pursuant to subdivision 1 for at least five years from the receipt of such certificate.<\/ins><\/p>\n<p class=section><ins>F<\/ins><ins>. The <\/ins><ins>Department<\/ins><ins> shall develop guidelines<\/ins><ins> for the administration of the Program<\/ins><ins>, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section. Such guidelines shall be exempt from the provisions of the Administrative Process Act (\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/2.2-4000\/'>2.2-4000<\/a> et seq.).<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-02-09",
                    "number": "SB834S1"
                }
            }
        }
    ],
    "copatron_count": 0,
    "patron_address": [
        "General Assembly Building",
        "P.O. Box 406",
        "Richmond",
        "VA 23218"
    ],
    "patron_chamber": "house",
    "patron_started": 2024,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "03\/09\/2026",
            "status": "Tabled in Appropriations (22-Y 0-N)",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": "301191",
            "translation": "failed committee"
        },
        {
            "date": "03\/09\/2026",
            "status": "Tabled in Appropriations",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": "301191",
            "translation": "failed committee"
        },
        {
            "date": "02\/27\/2026",
            "status": "Assigned HAPP sub: Commerce Agriculture & Natural Resources",
            "date_raw": "2026-02-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "02\/25\/2026",
            "status": "Referred from Finance and referred to Appropriations (21-Y 0-N)",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": "298994",
            "translation": null
        },
        {
            "date": "02\/23\/2026",
            "status": "Subcommittee recommends referring to Appropriations(Voice Vote)",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": "298561",
            "translation": null
        },
        {
            "date": "02\/23\/2026",
            "status": "Fiscal Impact Statement from Department of Planning and Budget (SB834)",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/20\/2026",
            "status": "Assigned HFIN sub: Subcommittee #1",
            "date_raw": "2026-02-20",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "02\/17\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/17\/2026",
            "status": "Referred to Committee on Finance",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/17\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/17\/2026",
            "status": "Placed on Calendar",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/11\/2026",
            "status": "Read third time and passed Senate (21-Y 19-N 0-A)",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": "296339",
            "translation": "passed senate"
        },
        {
            "date": "02\/10\/2026",
            "status": "Finance and Appropriations Substitute agreed to",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": "296003",
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Engrossed by Senate - committee substitute (Voice Vote)",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Engrossed by Senate - committee substitute",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Engrossed by Senate (Voice Vote)",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": "296004",
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Committee substitute agreed to (Voice Vote)",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Passed by for the day  Block Vote (Voice Vote)",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": "295543",
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 1st reading) (40-Y 0-N 0-A)",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": "295542",
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Committee substitute printed 26107347D-S1",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/05\/2026",
            "status": "Reported from Finance and Appropriations with substitute (10-Y 5-N)",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": "294965",
            "translation": "passed committee"
        },
        {
            "date": "02\/05\/2026",
            "status": "Reported from Finance and Appropriations with substitute",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed committee"
        },
        {
            "date": "01\/27\/2026",
            "status": "Unanimous consent to introduce",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/27\/2026",
            "status": "Referred to Committee on Finance and Appropriations",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/27\/2026",
            "status": "Presented and ordered printed 26105850D",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 511,
    "date_introduced": "2026-01-27",
    "patron_district": 77,
    "patron_shortname": "mjjones",
    "committee_chamber": "house",
    "status_detail_date": "03\/09\/2026",
    "committee_shortname": "appropriations",
    "patron_name_formatted": "Del. Michael Jones (D-Richmond)"
}