<b>Air Pollution Control Board regulations; small renewable energy projects; anaerobic digestion technology; report.</b> Provides that for the purposes of a permit by rule for a small renewable energy project under existing law, a small renewable energy project includes an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030. The bill directs the Department of Environmental Quality, in coordination with relevant stakeholders, to (i) assess all practicable technologies available to waste-to-energy facilities to reduce carbon dioxide and methane emissions, (ii) assess technologies to create biomethane, and (iii) recommend any legislative changes necessary to create market conditions to ensure the viability of such program. The bill also directs the Department to report its findings to the Air Pollution Control Board by December 1, 2026.
Raw source record
{
"id": 85694,
"url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb645\/",
"tags": {
"146696": "environment",
"146697": "energy",
"146698": "regulation",
"146699": "pollution",
"146700": "renewable energy",
"146701": "waste management"
},
"text": [
{
"date": "2026-01-14",
"number": "SB645",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb645.pdf"
},
{
"date": "2026-02-12",
"number": "SB645S1"
},
{
"date": "2026-02-25",
"number": "SB645H1"
},
{
"date": "2026-03-02",
"number": "SB645H2"
},
{
"date": "2026-03-13",
"number": "SB645S2"
},
{
"date": "2026-03-30",
"number": "SB645ER"
},
{
"date": "2026-04-13",
"number": "CHAP0901"
}
],
"type": "bill",
"year": 2026,
"video": null,
"number": "sb645",
"patron": "Surovell, Scott",
"status": "signed by governor",
"chamber": "senate",
"changes": null,
"outcome": "passed",
"related": [
{
"id": 84446,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb615",
"status": "failed committee",
"catch_line": "Electric utilities; renewable portfolio standard program, deficiency payments.",
"date_introduced": "January 13, 2026"
},
{
"id": 84990,
"name": "Appropriations",
"year": 2026,
"count": 4,
"number": "hb1089",
"status": "failed committee",
"catch_line": "Va. Brownfield & Coal Mine Renewable Energy Grant Fund; increases kilowatt of nameplate capacity.",
"date_introduced": "January 14, 2026"
},
{
"id": 85566,
"name": "Agriculture, Conservation and Natural Resources",
"year": 2026,
"count": 4,
"number": "sb562",
"status": "failed committee",
"catch_line": "Electric utilities; RPS requirements, Air Pollution Control Board regulations.",
"date_introduced": "January 14, 2026"
},
{
"id": 84880,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb1031",
"status": "failed committee",
"catch_line": "Electric utilities; RPS requirements, Air Pollution Control Board regulations.",
"date_introduced": "January 14, 2026"
},
{
"id": 85393,
"name": "Finance",
"year": 2026,
"count": 4,
"number": "sb415",
"status": "failed committee",
"catch_line": "Va. Brownfield & Coal Mine Renewable Energy Grant Fund; increases kilowatt of nameplate capacity.",
"date_introduced": "January 13, 2026"
}
],
"summary": "<b>Air Pollution Control Board regulations; small renewable energy projects; anaerobic digestion technology; report.<\/b> Provides that for the purposes of a permit by rule for a small renewable energy project under existing law, a small renewable energy project includes an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030. The bill directs the Department of Environmental Quality, in coordination with relevant stakeholders, to (i) assess all practicable technologies available to waste-to-energy facilities to reduce carbon dioxide and methane emissions, (ii) assess technologies to create biomethane, and (iii) recommend any legislative changes necessary to create market conditions to ensure the viability of such program. The bill also directs the Department to report its findings to the Air Pollution Control Board by December 1, 2026.",
"version": "CHAP0901",
"copatron": null,
"committee": "Agriculture, Conservation and Natural Resources",
"full_text": "<p class=\"ldtitle\">An Act to amend and reenact \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>, as it is currently effective and as it shall become effective, of the Code of Virginia, relating to Air Pollution Control Board regulations; small renewable energy projects; anaerobic digestion technology; report.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>, as it is currently effective and as it shall become effective, of the Code of Virginia is amended and reenacted as follows:<\/p><p class=\"catchln\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>. (Effective until July 1, 2026) Definitions.<\/p><p class=\"section\">As used in this article:<\/p><p class=\"section\"><em class=\"new\">\"Anaerobic digestion technology\" means technology enabling anaerobic digestion as defined in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/3.2-3600\/'>3.2-3600<\/a>.<\/ins><\/p><p class=\"section\">\"Energy storage facility\" means energy storage equipment or technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering energy after it has been stored.<\/p><p class=\"section\">\"Small renewable energy project\" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts;<s> or<\/s> (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) and an energy storage facility that meets the parameters established in clause (iv)<em class=\"new\">; or (vi) an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that any such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030<\/ins>.<\/p><p class=\"catchln\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>. (Effective July 1, 2026) Definitions.<\/p><p class=\"section\">As used in this article:<\/p><p class=\"section\"><em class=\"new\">\"Anaerobic digestion technology\" means technology enabling anaerobic digestion as defined in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/3.2-3600\/'>3.2-3600<\/a>.<\/ins><\/p><p class=\"section\">\"Energy storage facility\" means energy storage equipment or technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering energy after it has been stored.<\/p><p class=\"section\">\"Interconnection facilities\" means generation tie lines, collector lines, substations, switching stations, and any other component required to connect an electrical generation facility with the electrical grid.<\/p><p class=\"section\">\"Small renewable energy project\" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind and its dedicated associated interconnection facilities; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power and its dedicated associated interconnection facilities; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts and its dedicated associated interconnection facilities;<s> or<\/s> (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) and an energy storage facility that meets the parameters established in clause (iv)<em class=\"new\">; or (vi) an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that any such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030<\/ins>.<\/p><p class=\"enactcls\">2. That the Department of Environmental Quality (the Department), in coordination with the Department of Energy, the Department of Health, the State Air Pollution Control Board, any county using a county manager plan of government, and any county using an urban county executive form of government operating an incinerator in Planning District 8, shall, in coordination with any operator of a waste-to-energy facility in the Commonwealth, (i) assess all practicable technologies available to waste-to-energy facilities to reduce carbon dioxide and methane emissions, (ii) assess technologies to create biomethane, and (iii) recommend any legislative changes necessary to create market conditions to ensure the viability of such program. The Department shall report its findings to the State Air Pollution Control Board by December 1, 2026.<\/p>",
"catch_line": "Air Pollution Control Board; regulations, small renewable energy projects, anaerobic tech., report.",
"duplicates": null,
"session_id": 32,
"word_count": 880,
"patron_party": "D",
"patron_place": "Mount Vernon",
"summary_hash": "d755375f7935925da55f4baa90dea271",
"patron_prefix": "Sen.",
"patron_suffix": "(D-Mount Vernon)",
"status_detail": "signed by governor",
"_rsun_versions": [
{
"id": "3772788aeac17ba954a29949ab9ae374380121207580b98f03f456e309bcf10f",
"code": "CHAP0901",
"bill_id": 85694,
"source_url": null,
"source_date": "2026-04-13",
"source_hash": "1423236fea2469700e3e024ba9f0d8a129413fda41a9ee2e414907b0c593840c",
"source_html": "<p class=\"ldtitle\">An Act to amend and reenact \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>, as it is currently effective and as it shall become effective, of the Code of Virginia, relating to Air Pollution Control Board regulations; small renewable energy projects; anaerobic digestion technology; report.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>, as it is currently effective and as it shall become effective, of the Code of Virginia is amended and reenacted as follows:<\/p><p class=\"catchln\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>. (Effective until July 1, 2026) Definitions.<\/p><p class=\"section\">As used in this article:<\/p><p class=\"section\"><em class=\"new\">\"Anaerobic digestion technology\" means technology enabling anaerobic digestion as defined in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/3.2-3600\/'>3.2-3600<\/a>.<\/ins><\/p><p class=\"section\">\"Energy storage facility\" means energy storage equipment or technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering energy after it has been stored.<\/p><p class=\"section\">\"Small renewable energy project\" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts;<s> or<\/s> (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) and an energy storage facility that meets the parameters established in clause (iv)<em class=\"new\">; or (vi) an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that any such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030<\/ins>.<\/p><p class=\"catchln\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/10.1-1197.5\/'>10.1-1197.5<\/a>. (Effective July 1, 2026) Definitions.<\/p><p class=\"section\">As used in this article:<\/p><p class=\"section\"><em class=\"new\">\"Anaerobic digestion technology\" means technology enabling anaerobic digestion as defined in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/3.2-3600\/'>3.2-3600<\/a>.<\/ins><\/p><p class=\"section\">\"Energy storage facility\" means energy storage equipment or technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering energy after it has been stored.<\/p><p class=\"section\">\"Interconnection facilities\" means generation tie lines, collector lines, substations, switching stations, and any other component required to connect an electrical generation facility with the electrical grid.<\/p><p class=\"section\">\"Small renewable energy project\" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind and its dedicated associated interconnection facilities; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power and its dedicated associated interconnection facilities; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts and its dedicated associated interconnection facilities;<s> or<\/s> (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) and an energy storage facility that meets the parameters established in clause (iv)<em class=\"new\">; or (vi) an electrical generation facility in a locality in Planning District 8 with a rated capacity not exceeding 100 megawatts that generates electricity from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities, provided that any such facility is capable of processing the majority of its organic waste, including food waste and municipal sludge, with anaerobic digestion technology by January 1, 2030<\/ins>.<\/p><p class=\"enactcls\">2. That the Department of Environmental Quality (the Department), in coordination with the Department of Energy, the Department of Health, the State Air Pollution Control Board, any county using a county manager plan of government, and any county using an urban county executive form of government operating an incinerator in Planning District 8, shall, in coordination with any operator of a waste-to-energy facility in the Commonwealth, (i) assess all practicable technologies available to waste-to-energy facilities to reduce carbon dioxide and methane emissions, (ii) assess technologies to create biomethane, and (iii) recommend any legislative changes necessary to create market conditions to ensure the viability of such program. The Department shall report its findings to the State Air Pollution Control Board by December 1, 2026.<\/p>",
"source_metadata": {
"bodyAssociation": "archive-reported-current-version",
"archiveReference": {
"date": "2026-04-13",
"number": "CHAP0901"
}
}
}
],
"copatron_count": 0,
"patron_address": [
"P.O. Box 289",
"Mount Vernon",
"VA 22121"
],
"patron_chamber": "senate",
"patron_started": 2016,
"session_lis_id": 261,
"status_history": [
{
"date": "04\/13\/2026",
"status": "Acts of Assembly Chapter text (CHAP0901)",
"date_raw": "2026-04-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "04\/13\/2026",
"status": "Approved by Governor-Chapter 901 (effective 7\/1\/2026)",
"date_raw": "2026-04-13",
"vote_count": null,
"lis_vote_id": null,
"translation": "signed by governor"
},
{
"date": "03\/31\/2026",
"status": "Signed by Speaker",
"date_raw": "2026-03-31",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/31\/2026",
"status": "Governor's Action Deadline 11:59 p.m., April 13, 2026",
"date_raw": "2026-03-31",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/31\/2026",
"status": "Enrolled Bill communicated to Governor on March 31, 2026",
"date_raw": "2026-03-31",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/31\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (SB645)",
"date_raw": "2026-03-31",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/30\/2026",
"status": "Signed by President",
"date_raw": "2026-03-30",
"vote_count": null,
"lis_vote_id": null,
"translation": "passed"
},
{
"date": "03\/30\/2026",
"status": "Bill text as passed Senate and House (SB645ER)",
"date_raw": "2026-03-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/30\/2026",
"status": "Enrolled",
"date_raw": "2026-03-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/20\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (SB645)",
"date_raw": "2026-03-20",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/14\/2026",
"status": "Conference report agreed to by Senate (22-Y 17-N 0-A)",
"date_raw": "2026-03-14",
"vote_count": null,
"lis_vote_id": "302245",
"translation": null
},
{
"date": "03\/14\/2026",
"status": "Conference report agreed to by House (87-Y 10-N 0-A)",
"date_raw": "2026-03-14",
"vote_count": null,
"lis_vote_id": "302219",
"translation": null
},
{
"date": "03\/13\/2026",
"status": "Conference Report released",
"date_raw": "2026-03-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/12\/2026",
"status": "House Conferees: Tran, Simonds, Ware",
"date_raw": "2026-03-12",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/12\/2026",
"status": "Conferees appointed by House",
"date_raw": "2026-03-12",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/11\/2026",
"status": "Senate Conferees: Surovell, Williams Graves, Pekarsky",
"date_raw": "2026-03-11",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/11\/2026",
"status": "Senate acceded to request Block Vote (40-Y 0-N 0-A)",
"date_raw": "2026-03-11",
"vote_count": null,
"lis_vote_id": "301772",
"translation": null
},
{
"date": "03\/11\/2026",
"status": "Conferees appointed by Senate",
"date_raw": "2026-03-11",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/10\/2026",
"status": "House requested conference committee",
"date_raw": "2026-03-10",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/10\/2026",
"status": "House insisted on substitute",
"date_raw": "2026-03-10",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/09\/2026",
"status": "House substitute rejected by Senate (0-Y 40-N 0-A)",
"date_raw": "2026-03-09",
"vote_count": null,
"lis_vote_id": "301104",
"translation": null
},
{
"date": "03\/09\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (SB645)",
"date_raw": "2026-03-09",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/05\/2026",
"status": "Passed House with substitute (93-Y 5-N 0-A)",
"date_raw": "2026-03-05",
"vote_count": null,
"lis_vote_id": "300734",
"translation": "passed house"
},
{
"date": "03\/05\/2026",
"status": "Engrossed by House - committee substitute",
"date_raw": "2026-03-05",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/05\/2026",
"status": "committee substitute agreed to",
"date_raw": "2026-03-05",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/05\/2026",
"status": "committee substitute rejected",
"date_raw": "2026-03-05",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/05\/2026",
"status": "Read third time",
"date_raw": "2026-03-05",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/04\/2026",
"status": "Read second time",
"date_raw": "2026-03-04",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/02\/2026",
"status": "Reported from Appropriations with substitute (22-Y 0-N)",
"date_raw": "2026-03-02",
"vote_count": null,
"lis_vote_id": "299853",
"translation": "passed committee"
},
{
"date": "03\/02\/2026",
"status": "Committee substitute printed 26108798D-H2",
"date_raw": "2026-03-02",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "03\/02\/2026",
"status": "Reported from Appropriations with substitute",
"date_raw": "2026-03-02",
"vote_count": null,
"lis_vote_id": "299853",
"translation": "passed committee"
},
{
"date": "02\/26\/2026",
"status": "Assigned HAPP sub: Commerce Agriculture & Natural Resources",
"date_raw": "2026-02-26",
"vote_count": null,
"lis_vote_id": null,
"translation": "in subcommittee"
},
{
"date": "02\/25\/2026",
"status": "Committee substitute printed 26108639D-H1",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/25\/2026",
"status": "House subcommittee offered",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/25\/2026",
"status": "Reported from Agriculture, Chesapeake and Natural Resources with substitute and referred to Appropriations (20-Y 2-N)",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": "298848",
"translation": "passed committee"
},
{
"date": "02\/25\/2026",
"status": "Subcommittee recommends reporting with substitute and referring to Appropriations (10-Y 0-N)",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": "298824",
"translation": "passed subcommittee"
},
{
"date": "02\/25\/2026",
"status": "Reported from Agriculture, Chesapeake and Natural Resources with substitute",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": "298848",
"translation": "passed committee"
},
{
"date": "02\/25\/2026",
"status": "Subcommittee recommends reporting with amendment(s)",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": "298824",
"translation": "passed subcommittee"
},
{
"date": "02\/24\/2026",
"status": "Assigned HACNR sub: Natural Resources",
"date_raw": "2026-02-24",
"vote_count": null,
"lis_vote_id": null,
"translation": "in subcommittee"
},
{
"date": "02\/19\/2026",
"status": "Referred to Committee on Agriculture, Chesapeake and Natural Resources",
"date_raw": "2026-02-19",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "02\/19\/2026",
"status": "Read first time",
"date_raw": "2026-02-19",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/19\/2026",
"status": "Placed on Calendar",
"date_raw": "2026-02-19",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/16\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (SB645)",
"date_raw": "2026-02-16",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Engrossed by Senate - committee substitute Block Vote (Voice Vote)",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Engrossed by Senate - committee substitute",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Agriculture, Conservation and Natural Resources Substitute agreed to",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": "297253",
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Read third time and passed Senate Block Vote (38-Y 0-N 0-A)",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": "297261",
"translation": "passed senate"
},
{
"date": "02\/13\/2026",
"status": "Rules suspended",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Constitutional reading dispensed Block Vote (on 3rd reading) (38-Y 0-N 0-A)",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": "297260",
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Engrossed by Senate Block Vote (Voice Vote)",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": "297259",
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Committee substitute agreed to (Voice Vote)",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": "297253",
"translation": null
},
{
"date": "02\/13\/2026",
"status": "Read second time",
"date_raw": "2026-02-13",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/12\/2026",
"status": "Passed by for the day",
"date_raw": "2026-02-12",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/12\/2026",
"status": "Passed by for the day Block Vote (Voice Vote)",
"date_raw": "2026-02-12",
"vote_count": null,
"lis_vote_id": "296922",
"translation": null
},
{
"date": "02\/12\/2026",
"status": "Constitutional reading dispensed Block Vote (on 1st reading) (40-Y 0-N 0-A)",
"date_raw": "2026-02-12",
"vote_count": null,
"lis_vote_id": "296921",
"translation": null
},
{
"date": "02\/12\/2026",
"status": "Rules suspended",
"date_raw": "2026-02-12",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/12\/2026",
"status": "Committee substitute printed 26107665D-S1",
"date_raw": "2026-02-12",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/10\/2026",
"status": "Reported from Agriculture, Conservation and Natural Resources with substitute (15-Y 0-N)",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": "296099",
"translation": "passed committee"
},
{
"date": "02\/10\/2026",
"status": "Reported from Agriculture, Conservation and Natural Resources with substitute",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": null,
"translation": "passed committee"
},
{
"date": "02\/10\/2026",
"status": "Senate committee offered",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/10\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (SB645)",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/14\/2026",
"status": "Referred to Committee on Agriculture, Conservation and Natural Resources",
"date_raw": "2026-01-14",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "01\/14\/2026",
"status": "Prefiled and ordered printed; Offered 01-14-2026 26102504D",
"date_raw": "2026-01-14",
"vote_count": null,
"lis_vote_id": null,
"translation": "introduced"
}
],
"chief_patron_id": 342,
"date_introduced": "2026-01-14",
"patron_district": 34,
"patron_shortname": "sasurovell",
"committee_chamber": "senate",
"status_detail_date": "04\/13\/2026",
"committee_shortname": "agriculture",
"patron_name_formatted": "Sen. Scott Surovell (D-Mount Vernon)"
}