SB621: Electric utilities; electric grid utilization metrics; State Corporation Commission.

signed by governor

<b>Phase I and Phase II Utilities; electric grid utilization metrics.</b> Requires Dominion Energy and Appalachian Power to petition the State Corporation Commission for approval of grid utilization metrics by October 15, 2026, which petition may be consolidated with the integrated resource plan filing for Dominion Energy in 2026. Under the bill, the petition shall include certain assessments comparing current electric grid system performance with optimal utilization of existing electric grid assets. The bill also requires the Commission to include in an existing annual report its findings on each applicable utility's assessment of relevant grid utilization metrics, which shall include an analysis of the potential for each applicable utility to increase electric grid utilization through the deployment of non-wires alternatives. This bill is identical to HB 434.

Official bill page · Source: Richmond Sunlight

Ask about SB621

Full bill text

Version CHAP0612 · 2026-04-13

Full text

Changes in this version: added text deleted text

An Act to direct certain electric utilities to petition the State Corporation Commission for approval of electric grid utilization metrics.

Be it enacted by the General Assembly of Virginia:

1. § 1. No later than October 15, 2026, each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of § 56-585.1 of the Code of Virginia, shall petition the State Corporation Commission (the Commission) for approval of electric grid utilization metrics. Such petition may include a request that the Commission consolidate such petition with the integrated resource plan, if such plan is filed in 2026 pursuant to § 56-599 of the Code of Virginia. Such petition shall include an overview of electric grid utilization metrics, including industry standard metrics. Each Phase I and Phase II Utility shall include in such filing an assessment of current electric distribution and transmission system performance as compared with optimal utilization of existing electric grid assets, including any information necessary for the Commission to evaluate the efficiency and performance of electric distribution and transmission system infrastructure owned and operated by each Phase I and Phase II Utility. Any electric grid utilization metrics proposed by a Phase I or Phase II Utility shall include (i) the ratio of distribution system peak load to total distribution electric grid capacity, (ii) the ratio of current electric load delivered to total potential deliverable electric load over the distribution system, (iii) the percentage of kilowatt-hours of electricity lost during the distribution process or by the distribution system, (iv) an analysis of constrained circuits on the distribution system, and (v) an evaluation of the performance of the distribution system at system peaks. In conducting such proceeding, the Commission shall determine which electric grid utilization metrics shall be approved, how such metrics may be reasonably applied at the feeder and substation level, and how such metrics may be reported in future integrated resource plan filings and shall include, as appropriate, a requirement to submit seasonal assessments of electric grid utilization and implementation of the metrics. In approving any electric grid utilization metrics, the Commission shall include, as appropriate, (a) a timeline for each Phase I and Phase II Utility to increase electric grid utilization in accordance with the approved metrics and (b) a description of the ways in which such metrics may inform the Commission's consideration of future utility requests for approval of cost recovery for capital investments. In subsequent integrated resource plan filings, each Phase I and Phase II Utility shall include an assessment of current system performance relative to each proposed metric and may propose new or modified electric grid utilization metrics for Commission approval.

§ 2. The Commission shall include in its annual report to the Commission on Electric Utility Regulation and the Governor required by § 56-596 of the Code of Virginia its findings on each Phase I and Phase II Utility's assessment of relevant grid utilization metrics and performance against those metrics relative to the requirements of this act, including the timeline established by the Commission for each such utility. In such report, the Commission shall also analyze the potential for each Phase I or Phase II Utility to increase electric grid utilization through the deployment of non-wires alternatives, including (i) energy storage resources; (ii) customer-owned or customer-financed capacity resources; (iii) utility-owned or utility-contracted distributed generation resources; (iv) virtual power plants, including by using the pilot program investments and tariff under § 56-585.1:16 of the Code of Virginia; (v) flexible transmission and transmission static synchronous compensators; (vi) synchronous condensers; and (vii) power quality monitoring equipment installed at the point of interconnection for all customers with a measured or contracted demand of 25 megawatts or greater. In conducting such analysis, the Commission may request any information necessary from each Phase I or Phase II Utility to properly evaluate such utility's deployment of non-wires alternatives or other methods to improve electric grid utilization in the Commonwealth.

Legislative actions

2026-03-03 · history

Passed House (92-Y 6-N 0-A)

2026-02-24 · history

Placed on Calendar

2026-03-09 · history

Signed by President

2026-03-09 · history

Enrolled

2026-02-12 · history

Senate committee offered

2026-02-16 · history

Committee substitute agreed to (Voice Vote)

2026-02-16 · history

Engrossed by Senate - committee substitute (Voice Vote)

2026-03-02 · history

Read second time

2026-02-24 · history

Read first time

2026-01-14 · history

Prefiled and ordered printed; Offered 01-14-2026 26103265D

2026-02-26 · history

Reported from Labor and Commerce

2026-03-03 · history

Read third time

2026-02-16 · history

Read second time

2026-04-13 · history

Approved by Governor-Chapter 612 (effective 7/1/2026)

2026-03-09 · history

Bill text as passed Senate and House (SB621ER)

2026-02-17 · history

Read third time and passed Senate (21-Y 19-N 0-A)

2026-03-10 · history

Governor's Action Deadline 11:59 p.m., April 13, 2026

2026-04-13 · history

Acts of Assembly Chapter text (CHAP0612)

2026-02-13 · history

Constitutional reading dispensed Block Vote (on 1st reading) (35-Y 0-N 0-A)

2026-03-10 · history

Enrolled Bill communicated to Governor on March 10, 2026

2026-02-13 · history

Rules suspended

2026-02-24 · history

Referred to Committee on Labor and Commerce

2026-02-26 · history

Fiscal Impact Statement from State Corporation Commission (SB621)

2026-03-09 · history

Signed by Speaker

2026-02-16 · history

Engrossed by Senate (Voice Vote)

2026-02-13 · history

Committee substitute printed 26107598D-S1

2026-03-12 · history

Fiscal Impact Statement from State Corporation Commission (SB621)

2026-02-13 · history

Passed by for the day

2026-02-12 · history

Reported from Commerce and Labor with substitute (8-Y 6-N 1-A)

2026-02-12 · history

Reported from Commerce and Labor with substitute

2026-02-26 · history

Reported from Labor and Commerce (15-Y 6-N)

2026-01-14 · history

Referred to Committee on Commerce and Labor

2026-01-27 · history

Fiscal Impact Statement from State Corporation Commission (SB621)

Raw source record
{
    "id": 85670,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb621\/",
    "tags": {
        "146594": "electricity",
        "146595": "utility",
        "146596": "scc",
        "146597": "regulation",
        "146598": "energy"
    },
    "text": [
        {
            "date": "2026-01-14",
            "number": "SB621",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb621.pdf"
        },
        {
            "date": "2026-02-13",
            "number": "SB621S1"
        },
        {
            "date": "2026-03-09",
            "number": "SB621ER"
        },
        {
            "date": "2026-04-13",
            "number": "CHAP0612"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "sb621",
    "patron": "Srinivasan, Kannan",
    "status": "signed by governor",
    "chamber": "senate",
    "changes": null,
    "outcome": "passed",
    "related": [
        {
            "id": 85042,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb1141",
            "status": "failed committee",
            "catch_line": "Electric utilities; suspension of certain requirements.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 85349,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "sb371",
            "status": "signed by governor",
            "catch_line": "Electric utilities; electric demand flexibility programs, high energy demand customers, report.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84976,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb1075",
            "status": "failed committee",
            "catch_line": "State Corporation Commission; Phase I Utility biennial rate review, reports.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 85752,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "sb691",
            "status": "failed committee",
            "catch_line": "State Corporation Commission; Phase I Utility biennial rate review, reports.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 84013,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb284",
            "status": "signed by governor",
            "catch_line": "Electric utilities; electric demand flexibility programs, high energy demand customers, report.",
            "date_introduced": "January 09, 2026"
        }
    ],
    "summary": "<b>Phase I and Phase II Utilities; electric grid utilization metrics.<\/b> Requires Dominion Energy and Appalachian Power to petition the State Corporation Commission for approval of grid utilization metrics by October 15, 2026, which petition may be consolidated with the integrated resource plan filing for Dominion Energy in 2026. Under the bill, the petition shall include certain assessments comparing current electric grid system performance with optimal utilization of existing electric grid assets. The bill also requires the Commission to include in an existing annual report its findings on each applicable utility's assessment of relevant grid utilization metrics, which shall include an analysis of the potential for each applicable utility to increase electric grid utilization through the deployment of non-wires alternatives. This bill is identical to HB 434.",
    "version": "CHAP0612",
    "copatron": null,
    "committee": "Commerce and Labor",
    "full_text": "<p class=\"ldtitle\">An Act to direct certain electric utilities to petition the State Corporation Commission for approval of electric grid utilization metrics.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"textbl\"><strong>1. <\/strong><em class=\"new\">\u00a7 1. No later than October 15, 2026, each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, shall petition the State Corporation Commission (the Commission) for approval of electric grid utilization metrics. Such petition may include a request that the Commission consolidate such petition with the integrated resource plan, if such plan is filed in 2026 pursuant to \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-599\/'>56-599<\/a> of the Code of Virginia. Such petition shall include an overview of electric grid utilization metrics, including industry standard metrics. Each Phase I and Phase II Utility shall include in such filing an assessment of current electric distribution and transmission system performance as compared with optimal utilization of existing electric grid assets, including any information necessary for the Commission to evaluate the efficiency and performance of electric distribution and transmission system infrastructure owned and operated by each Phase I and Phase II Utility. Any electric grid utilization metrics proposed by a Phase I or Phase II Utility shall include (i) the ratio of distribution system peak load to total distribution electric grid capacity, (ii) the ratio of current electric load delivered to total potential deliverable electric load over the distribution system, (iii) the percentage of kilowatt-hours of electricity lost during the distribution process or by the distribution system, (iv) an analysis of constrained circuits on the distribution system, and (v) an evaluation of the performance of the distribution system at system peaks. In conducting such proceeding, the Commission shall determine which electric grid utilization metrics shall be approved, how such metrics may be reasonably applied at the feeder and substation level, and how such metrics may be reported in future integrated resource plan filings and shall include, as appropriate, a requirement to submit seasonal assessments of electric grid utilization and implementation of the metrics. In approving any electric grid utilization metrics, the Commission shall include, as appropriate, (a) a timeline for each Phase I and Phase II Utility to increase electric grid utilization in accordance with the approved metrics and (b) a description of the ways in which such metrics may inform the Commission's consideration of future utility requests for approval of cost recovery for capital investments. In subsequent integrated resource plan filings, each Phase I and Phase II Utility shall include an assessment of current system performance relative to each proposed metric and may propose new or modified electric grid utilization metrics for Commission approval.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 2. The Commission shall include in its annual report to the Commission on Electric Utility Regulation and the Governor required by \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-596\/'>56-596<\/a> of the Code of Virginia its findings on each Phase I and Phase II Utility's assessment of relevant grid utilization metrics and performance against those metrics relative to the requirements of this act, including the timeline established by the Commission for each such utility. In such report, the Commission shall also analyze the potential for each Phase I or Phase II Utility to increase electric grid utilization through the deployment of non-wires alternatives, including (i) energy storage resources; (ii) customer-owned or customer-financed capacity resources; (iii) utility-owned or utility-contracted distributed generation resources; (iv) virtual power plants, including by using the pilot program investments and tariff under \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a> of the Code of Virginia; (v) flexible transmission and transmission static synchronous compensators; (vi) synchronous condensers; and (vii) power quality monitoring equipment installed at the point of interconnection for all customers with a measured or contracted demand of 25 megawatts or greater. In conducting such analysis, the Commission may request any information necessary from each Phase I or Phase II Utility to properly evaluate such utility's deployment of non-wires alternatives or other methods to improve electric grid utilization in the Commonwealth.<\/ins><\/p>",
    "catch_line": "Electric utilities; electric grid utilization metrics; State Corporation Commission.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 709,
    "patron_party": "D",
    "patron_place": "Broadlands",
    "summary_hash": "1bd2de67b012980cdf2aaecd3f27d248",
    "patron_prefix": "Sen.",
    "patron_suffix": "(D-Broadlands)",
    "status_detail": "signed by governor",
    "_rsun_versions": [
        {
            "id": "bb80f3106e31341955ec0bff4c8cdfab1e39a4f1357eec454a3db139f70f9cef",
            "code": "CHAP0612",
            "bill_id": 85670,
            "source_url": null,
            "source_date": "2026-04-13",
            "source_hash": "b0e0a41b004f53bd296157d6b2d63740f4bbb4ab3f5d4d50d67270f05438f204",
            "source_html": "<p class=\"ldtitle\">An Act to direct certain electric utilities to petition the State Corporation Commission for approval of electric grid utilization metrics.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"textbl\"><strong>1. <\/strong><em class=\"new\">\u00a7 1. No later than October 15, 2026, each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, shall petition the State Corporation Commission (the Commission) for approval of electric grid utilization metrics. Such petition may include a request that the Commission consolidate such petition with the integrated resource plan, if such plan is filed in 2026 pursuant to \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-599\/'>56-599<\/a> of the Code of Virginia. Such petition shall include an overview of electric grid utilization metrics, including industry standard metrics. Each Phase I and Phase II Utility shall include in such filing an assessment of current electric distribution and transmission system performance as compared with optimal utilization of existing electric grid assets, including any information necessary for the Commission to evaluate the efficiency and performance of electric distribution and transmission system infrastructure owned and operated by each Phase I and Phase II Utility. Any electric grid utilization metrics proposed by a Phase I or Phase II Utility shall include (i) the ratio of distribution system peak load to total distribution electric grid capacity, (ii) the ratio of current electric load delivered to total potential deliverable electric load over the distribution system, (iii) the percentage of kilowatt-hours of electricity lost during the distribution process or by the distribution system, (iv) an analysis of constrained circuits on the distribution system, and (v) an evaluation of the performance of the distribution system at system peaks. In conducting such proceeding, the Commission shall determine which electric grid utilization metrics shall be approved, how such metrics may be reasonably applied at the feeder and substation level, and how such metrics may be reported in future integrated resource plan filings and shall include, as appropriate, a requirement to submit seasonal assessments of electric grid utilization and implementation of the metrics. In approving any electric grid utilization metrics, the Commission shall include, as appropriate, (a) a timeline for each Phase I and Phase II Utility to increase electric grid utilization in accordance with the approved metrics and (b) a description of the ways in which such metrics may inform the Commission's consideration of future utility requests for approval of cost recovery for capital investments. In subsequent integrated resource plan filings, each Phase I and Phase II Utility shall include an assessment of current system performance relative to each proposed metric and may propose new or modified electric grid utilization metrics for Commission approval.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 2. The Commission shall include in its annual report to the Commission on Electric Utility Regulation and the Governor required by \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-596\/'>56-596<\/a> of the Code of Virginia its findings on each Phase I and Phase II Utility's assessment of relevant grid utilization metrics and performance against those metrics relative to the requirements of this act, including the timeline established by the Commission for each such utility. In such report, the Commission shall also analyze the potential for each Phase I or Phase II Utility to increase electric grid utilization through the deployment of non-wires alternatives, including (i) energy storage resources; (ii) customer-owned or customer-financed capacity resources; (iii) utility-owned or utility-contracted distributed generation resources; (iv) virtual power plants, including by using the pilot program investments and tariff under \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a> of the Code of Virginia; (v) flexible transmission and transmission static synchronous compensators; (vi) synchronous condensers; and (vii) power quality monitoring equipment installed at the point of interconnection for all customers with a measured or contracted demand of 25 megawatts or greater. In conducting such analysis, the Commission may request any information necessary from each Phase I or Phase II Utility to properly evaluate such utility's deployment of non-wires alternatives or other methods to improve electric grid utilization in the Commonwealth.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-04-13",
                    "number": "CHAP0612"
                }
            }
        }
    ],
    "copatron_count": 0,
    "patron_address": [
        "P.O. Box 4268",
        "Broadlands",
        "VA 20148"
    ],
    "patron_chamber": "senate",
    "patron_started": 2025,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "04\/13\/2026",
            "status": "Acts of Assembly Chapter text (CHAP0612)",
            "date_raw": "2026-04-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "04\/13\/2026",
            "status": "Approved by Governor-Chapter 612 (effective 7\/1\/2026)",
            "date_raw": "2026-04-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "signed by governor"
        },
        {
            "date": "03\/12\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB621)",
            "date_raw": "2026-03-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Governor's Action Deadline 11:59 p.m., April 13, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Enrolled Bill communicated to Governor on March 10, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/09\/2026",
            "status": "Signed by President",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed"
        },
        {
            "date": "03\/09\/2026",
            "status": "Signed by Speaker",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/09\/2026",
            "status": "Bill text as passed Senate and House (SB621ER)",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/09\/2026",
            "status": "Enrolled",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/03\/2026",
            "status": "Passed House (92-Y 6-N 0-A)",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": "300135",
            "translation": "passed house"
        },
        {
            "date": "03\/03\/2026",
            "status": "Read third time",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/02\/2026",
            "status": "Read second time",
            "date_raw": "2026-03-02",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Reported from Labor and Commerce (15-Y 6-N)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299377",
            "translation": "passed committee"
        },
        {
            "date": "02\/26\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB621)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Reported from Labor and Commerce",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299377",
            "translation": "passed committee"
        },
        {
            "date": "02\/24\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/24\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/24\/2026",
            "status": "Placed on Calendar",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/17\/2026",
            "status": "Read third time and passed Senate (21-Y 19-N 0-A)",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": "297958",
            "translation": "passed senate"
        },
        {
            "date": "02\/16\/2026",
            "status": "Engrossed by Senate - committee substitute (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Engrossed by Senate (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": "297721",
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Committee substitute agreed to (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": "297720",
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 1st reading) (35-Y 0-N 0-A)",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": "297343",
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Committee substitute printed 26107598D-S1",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Reported from Commerce and Labor with substitute (8-Y 6-N 1-A)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296949",
            "translation": "passed committee"
        },
        {
            "date": "02\/12\/2026",
            "status": "Reported from Commerce and Labor with substitute",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296949",
            "translation": "passed committee"
        },
        {
            "date": "02\/12\/2026",
            "status": "Senate committee offered",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/27\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB621)",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/14\/2026",
            "status": "Referred to Committee on Commerce and Labor",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/14\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26103265D",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 523,
    "date_introduced": "2026-01-14",
    "patron_district": 32,
    "patron_shortname": "ksrinivasan",
    "committee_chamber": "senate",
    "status_detail_date": "04\/13\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Sen. Kannan Srinivasan (D-Loudoun)"
}