<b>High load facilities; impact assessments.</b> Prohibits a governing body or board of zoning appeals from issuing final approval for any special exception, special use permit, variance, rezoning application, or other land disturbing permit, including building permits and erosion and sediment control permits, for a high load facility, defined in the bill, until the applicant submits a finding of no impact or minimal impact issued by the State Corporation Commission. The bill provides that upon request by the owner or operator of a high load facility, the Commission will assess whether the high load facility will have a material adverse impact upon the incumbent electric utility's ability to (i) to maintain electric grid reliability, (ii) avoid exceeding available generation or transmission capacity constraints, or (iii) meet certain statutory requirements.
Raw source record
{
"id": 85466,
"url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb467\/",
"tags": {
"147859": "regulation",
"147860": "land use",
"147861": "energy",
"147862": "zoning",
"147863": "environment",
"147864": "electricity"
},
"text": [
{
"date": "2026-01-13",
"number": "SB467",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb467.pdf"
}
],
"type": "bill",
"year": 2026,
"video": null,
"number": "sb467",
"patron": "Deeds, Creigh",
"status": "failed committee",
"chamber": "senate",
"changes": null,
"outcome": "failed",
"related": [
{
"id": 85013,
"name": "Counties, Cities and Towns",
"year": 2026,
"count": 5,
"number": "hb1112",
"status": "failed committee",
"catch_line": "Zoning; high-energy users, local authority.",
"date_introduced": "January 14, 2026"
},
{
"id": 85558,
"name": "Local Government",
"year": 2026,
"count": 5,
"number": "sb554",
"status": "failed committee",
"catch_line": "Zoning; high-energy users, local authority.",
"date_introduced": "January 14, 2026"
},
{
"id": 85078,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb1175",
"status": "failed committee",
"catch_line": "Electric utilities; request for proposals required for certain facilities.",
"date_introduced": "January 14, 2026"
},
{
"id": 83908,
"name": "Local Government",
"year": 2026,
"count": 4,
"number": "sb130",
"status": "incorporated",
"catch_line": "Data centers; site assessment, definition of high energy use facility.",
"date_introduced": "January 06, 2026"
},
{
"id": 84991,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb1090",
"status": "failed committee",
"catch_line": "Electric utilities; emissions intensity target program.",
"date_introduced": "January 14, 2026"
}
],
"summary": "<b>High load facilities; impact assessments.<\/b> Prohibits a governing body or board of zoning appeals from issuing final approval for any special exception, special use permit, variance, rezoning application, or other land disturbing permit, including building permits and erosion and sediment control permits, for a high load facility, defined in the bill, until the applicant submits a finding of no impact or minimal impact issued by the State Corporation Commission. The bill provides that upon request by the owner or operator of a high load facility, the Commission will assess whether the high load facility will have a material adverse impact upon the incumbent electric utility's ability to (i) to maintain electric grid reliability, (ii) avoid exceeding available generation or transmission capacity constraints, or (iii) meet certain statutory requirements.",
"version": "SB467",
"copatron": null,
"committee": "Commerce and Labor",
"full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Article 1 of Chapter 22 of Title 15.2 a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/15.2-2209.4\/'>15.2-2209.4<\/a> and by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a> as follows:<\/p>\n<p class=catchln><ins>\u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/15.2-2209.4\/'>15.2-2209.4<\/a>. <\/ins><ins>High load facility<\/ins><ins>; <\/ins><ins>impact <\/ins><ins>assessment<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high<\/ins><ins> <\/ins><ins>load<\/ins><ins> facility<\/ins><ins>\"<\/ins><ins> <\/ins><ins>means a <\/ins><ins>proposed <\/ins><ins>facility <\/ins><ins>or a combination of facilities that effectively operate together as one facility with an expected electricity demand that exceeds 90 megawatts<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B.<\/ins><ins> No <\/ins><ins>governing body or board of zoning appeals<\/ins><ins> shall issue final approval for any special exception, special use permit, variance, rezoning application<\/ins><ins>,<\/ins><ins> or other land disturbing permit, including building permits and erosion and sediment control permits,<\/ins><ins> for a high <\/ins><ins>load<\/ins><ins> facility until the applicant submits<\/ins><ins> a finding<\/ins><ins> of no impact or minimal impact<\/ins><ins> issued by the State Corporation Commission <\/ins><ins>in accordance with the provisions of <\/ins><ins>\u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins>56<\/ins><ins>-<\/ins><ins>580.<\/ins><ins>1. <\/ins><ins>High <\/ins><ins>load facilities<\/ins><ins>; impact assessment<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high load facility\" means a<\/ins><ins> <\/ins><ins>proposed <\/ins><ins>faci<\/ins><ins>lity or a combination of facilities that effectively operate together as one facility with an <\/ins><ins>expected <\/ins><ins>electricity demand <\/ins><ins>that exceeds <\/ins><ins>90 <\/ins><ins>megawatts.<\/ins><\/p>\n<p class=section><ins>B. <\/ins><ins>In a form and manner <\/ins><ins>and with such information as determined by the Commission, the owner or operator of a high load facility may request an a<\/ins><ins>ssessment<\/ins><ins> of the impact<\/ins><ins> <\/ins><ins>of its high load facility from the Commission. <\/ins><ins>Upon receipt of a complete request, the Commission shall assess whether the<\/ins><ins> <\/ins><ins>high load facility <\/ins><ins>will have <\/ins><ins>a<\/ins><ins> <\/ins><ins>material adverse <\/ins><ins>impact <\/ins><ins>upon <\/ins><ins>the incumbent electric utility's ability<\/ins><ins> <\/ins><ins>to <\/ins><ins>(i)<\/ins><ins> to maintain electric grid reliability<\/ins><ins>, (<\/ins><ins>ii)<\/ins><ins> avoid exceeding available generation or transmission capacity constraints<\/ins><ins>,<\/ins><ins> or (i<\/ins><ins>ii<\/ins><ins>) <\/ins><ins>meet its obligations under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a>. <\/ins><ins>The Commission shall issue its findings <\/ins><ins>within<\/ins><ins> 120 days <\/ins><ins>of receipt of a complete request unless the Commission determines<\/ins><ins> a longer period is required.<\/ins><\/p>\n<p class=section><ins>C. The owner or operator of a high load facility<\/ins><ins> ma<\/ins><ins>y<\/ins><ins> <\/ins><ins>request a subsequent impact assessment <\/ins><ins>if the<\/ins><ins>re is a material change in the<\/ins><ins> facts and circumstances surrounding <\/ins><ins>its<\/ins><ins> facility or <\/ins><ins>the <\/ins><ins>i<\/ins><ins>ncumbent electric utility<\/ins><ins>.<\/ins><\/p>",
"catch_line": "High load facilities; impact assessments.",
"duplicates": [
{
"year": 2027,
"number": "sb467",
"patron": "Deeds, Creigh",
"status": "in committee",
"chamber": "senate",
"catch_line": "High load facilities; impact assessments.",
"date_introduced": "2026-01-13"
}
],
"session_id": 32,
"word_count": 625,
"patron_party": "D",
"patron_place": "Charlottesville",
"summary_hash": "b105d3b5f39fc99e27d95256052449ba",
"patron_prefix": "Sen.",
"patron_suffix": "(D-Charlottesville)",
"status_detail": "failed committee",
"_rsun_versions": [
{
"id": "d2e9b1750dfe24d4580b5edca8fb7f68ef966a57362a74a8a0fcd1bb2656d13c",
"code": "SB467",
"bill_id": 85466,
"source_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb467.pdf",
"source_date": "2026-01-13",
"source_hash": "60a5fe72ce397dc5c20a12066fe22f92cb77bfc8df0916b1776f512c52451db5",
"source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Article 1 of Chapter 22 of Title 15.2 a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/15.2-2209.4\/'>15.2-2209.4<\/a> and by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a> as follows:<\/p>\n<p class=catchln><ins>\u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/15.2-2209.4\/'>15.2-2209.4<\/a>. <\/ins><ins>High load facility<\/ins><ins>; <\/ins><ins>impact <\/ins><ins>assessment<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high<\/ins><ins> <\/ins><ins>load<\/ins><ins> facility<\/ins><ins>\"<\/ins><ins> <\/ins><ins>means a <\/ins><ins>proposed <\/ins><ins>facility <\/ins><ins>or a combination of facilities that effectively operate together as one facility with an expected electricity demand that exceeds 90 megawatts<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B.<\/ins><ins> No <\/ins><ins>governing body or board of zoning appeals<\/ins><ins> shall issue final approval for any special exception, special use permit, variance, rezoning application<\/ins><ins>,<\/ins><ins> or other land disturbing permit, including building permits and erosion and sediment control permits,<\/ins><ins> for a high <\/ins><ins>load<\/ins><ins> facility until the applicant submits<\/ins><ins> a finding<\/ins><ins> of no impact or minimal impact<\/ins><ins> issued by the State Corporation Commission <\/ins><ins>in accordance with the provisions of <\/ins><ins>\u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins>56<\/ins><ins>-<\/ins><ins>580.<\/ins><ins>1. <\/ins><ins>High <\/ins><ins>load facilities<\/ins><ins>; impact assessment<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high load facility\" means a<\/ins><ins> <\/ins><ins>proposed <\/ins><ins>faci<\/ins><ins>lity or a combination of facilities that effectively operate together as one facility with an <\/ins><ins>expected <\/ins><ins>electricity demand <\/ins><ins>that exceeds <\/ins><ins>90 <\/ins><ins>megawatts.<\/ins><\/p>\n<p class=section><ins>B. <\/ins><ins>In a form and manner <\/ins><ins>and with such information as determined by the Commission, the owner or operator of a high load facility may request an a<\/ins><ins>ssessment<\/ins><ins> of the impact<\/ins><ins> <\/ins><ins>of its high load facility from the Commission. <\/ins><ins>Upon receipt of a complete request, the Commission shall assess whether the<\/ins><ins> <\/ins><ins>high load facility <\/ins><ins>will have <\/ins><ins>a<\/ins><ins> <\/ins><ins>material adverse <\/ins><ins>impact <\/ins><ins>upon <\/ins><ins>the incumbent electric utility's ability<\/ins><ins> <\/ins><ins>to <\/ins><ins>(i)<\/ins><ins> to maintain electric grid reliability<\/ins><ins>, (<\/ins><ins>ii)<\/ins><ins> avoid exceeding available generation or transmission capacity constraints<\/ins><ins>,<\/ins><ins> or (i<\/ins><ins>ii<\/ins><ins>) <\/ins><ins>meet its obligations under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a>. <\/ins><ins>The Commission shall issue its findings <\/ins><ins>within<\/ins><ins> 120 days <\/ins><ins>of receipt of a complete request unless the Commission determines<\/ins><ins> a longer period is required.<\/ins><\/p>\n<p class=section><ins>C. The owner or operator of a high load facility<\/ins><ins> ma<\/ins><ins>y<\/ins><ins> <\/ins><ins>request a subsequent impact assessment <\/ins><ins>if the<\/ins><ins>re is a material change in the<\/ins><ins> facts and circumstances surrounding <\/ins><ins>its<\/ins><ins> facility or <\/ins><ins>the <\/ins><ins>i<\/ins><ins>ncumbent electric utility<\/ins><ins>.<\/ins><\/p>",
"source_metadata": {
"bodyAssociation": "archive-reported-current-version",
"archiveReference": {
"date": "2026-01-13",
"number": "SB467",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb467.pdf"
}
}
}
],
"copatron_count": 0,
"patron_address": [
"P.O. Box 5462",
"Charlottesville",
"VA 22905"
],
"patron_chamber": "senate",
"patron_started": 2001,
"session_lis_id": 261,
"status_history": [
{
"date": "02\/09\/2026",
"status": "Continued to 2027 in Commerce and Labor (11-Y 4-N)",
"date_raw": "2026-02-09",
"vote_count": null,
"lis_vote_id": "295632",
"translation": "failed committee"
},
{
"date": "02\/09\/2026",
"status": "Continued to 2027 in Commerce and Labor",
"date_raw": "2026-02-09",
"vote_count": null,
"lis_vote_id": null,
"translation": "failed committee"
},
{
"date": "02\/09\/2026",
"status": "Fiscal Impact Statement from State Corporation Commission (SB467)",
"date_raw": "2026-02-09",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/13\/2026",
"status": "Referred to Committee on Commerce and Labor",
"date_raw": "2026-01-13",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "01\/13\/2026",
"status": "Prefiled and ordered printed; Offered 01-14-2026 26100165D",
"date_raw": "2026-01-13",
"vote_count": null,
"lis_vote_id": null,
"translation": "introduced"
}
],
"chief_patron_id": 269,
"date_introduced": "2026-01-13",
"patron_district": 11,
"patron_shortname": "rcdeeds",
"committee_chamber": "senate",
"status_detail_date": "02\/09\/2026",
"committee_shortname": "commerce",
"patron_name_formatted": "Sen. Creigh Deeds (D-Charlottesville)"
}