SB377: Electric substation construction agreements; "electric cooperatives" or "cooperative," definitions.

signed by governor

<b>Utility consumer services cooperatives; substation construction agreements.</b> Permits an electric cooperative to enter into an agreement to construct a substation with a member receiving regulated electric service, with an electric demand of at least 20 megawatts during the most recent calendar year, that requires a point of interconnection with a transmission line system of 230 kilovolts or more. The bill provides that, upon final completion of a substation constructed under such an agreement, the member shall transfer ownership of such substation to the cooperative for the cooperative to operate and maintain at the member's sole expense. Under the bill, the costs of acquisition, operation, or maintenance of such a substation shall be excluded from the cooperative's general and base rates and shall not be recovered from any other ratepayer. This bill is identical to HB 1191.

Official bill page · Source: Richmond Sunlight

Ask about SB377

Full bill text

Version CHAP0022 · 2026-03-31 · Official source text

Full text

Changes in this version: added text deleted text

An Act to amend the Code of Virginia by adding a section numbered 56-594.01:2, relating to electric substation construction agreements; electric cooperatives.

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding a section numbered 56-594.01:2 as follows:

§ 56-594.01:2. Substation construction agreements; electric cooperatives.

A. As used in this section:

"Electric cooperative" or "cooperative" means a utility consumer services cooperative organized under Article 1 of Chapter 9.1.

"Member" has the same meaning as provided in § 56-231.15.

B. An electric cooperative may enter into an agreement to construct a substation with a member receiving regulated electric service, with an electric demand of at least 20 megawatts during the most recent calendar year, that requires a point of interconnection with a transmission line system of 230 kilovolts or more. Such agreement shall be filed jointly by the member and cooperative with the Commission for informational purposes and, if requested, treated with confidentiality by the Commission. Such substation shall be for dedicated service only to the member's facilities and shall be constructed at the member's sole expense, in accordance with all applicable laws, regulations, reliability standards, and the cooperative's specifications.

C. In addition to any inspections or milestones that may be included in an agreement described in subsection B, the member shall notify the cooperative in writing upon substantial completion of the substation. Within 60 days after receiving such notice, the cooperative shall inspect the substation and issue any final construction change orders within 30 days after the inspection.

D. Upon final completion of a substation constructed under an agreement described in subsection B, the member shall transfer ownership and control to the cooperative by donation or for mutually agreed consideration, which consideration shall be deemed legally sufficient to transfer ownership. Following such transfer of ownership, the cooperative shall operate and maintain such substation at the member's sole expense, pursuant to the cooperative's applicable rates, terms, and conditions.

E. The Commission shall exclude the costs of acquisition, operation, or maintenance of any substation acquired by a cooperative under this section from the cooperative's general and base rates and shall ensure that no costs associated with such substation are recovered from any ratepayer other than the member that entered an agreement to construct the substation.

F. No provision of Chapter 5 (§ 56-88 et seq.) or Chapter 10.1 (§ 56-265.1 et seq.) shall apply to any agreement or acquisition conducted pursuant to this section.

G. Any agreement described in subsection B shall be negotiated by the member and cooperative in good faith. If a cooperative fails to negotiate or fails to propose a draft agreement within 120 days after the date of written request for such agreement by the member, the member may file a petition with the Commission to order the cooperative to negotiate and to offer a draft agreement for substation construction by the member. If any such petition is filed, the Commission shall hear the petition, if necessary, within three months after filing and shall issue an order on such petition within six months after filing. The Commission shall establish a fee schedule for the adjudication of such petition, to be payable by the member seeking a draft agreement from the cooperative, which fees shall be assessed for the purposes of funding the Commission's costs of administering and enforcing the provisions of this section.

H. In the case of disputes that may arise during negotiation of an agreement described in subsection B, or during the construction and transfer process of the substation, the cooperative and member shall have recourse through the informal and formal dispute resolution processes of the Commission.

Legislative actions

2026-02-12 · history

Committee substitute rejected (Voice Vote)

2026-03-04 · history

Bill text as passed Senate and House (SB377ER)

2026-02-12 · history

Senator Surovell Substitute agreed to

2026-02-26 · history

Read second time

2026-02-24 · history

Reported from Labor and Commerce

2026-02-12 · history

Floor Offered

2026-02-11 · history

Constitutional reading dispensed Block Vote (on 1st reading) (40-Y 0-N 0-A)

2026-02-12 · history

Engrossed by Senate (Voice Vote)

2026-02-18 · history

Referred to Committee on Labor and Commerce

2026-01-13 · history

Referred to Committee on Commerce and Labor

2026-02-18 · history

Placed on Calendar

2026-02-12 · history

Floor substitute printed 26107668D-S2 (Surovell)

2026-02-27 · history

Passed House Block Vote (96-Y 0-N 0-A)

2026-02-12 · history

Engrossed by Senate - floor substitute (Voice Vote)

2026-02-10 · history

Committee substitute printed 26107087D-S1

2026-02-13 · history

Read third time and passed Senate (39-Y 0-N 0-A)

2026-03-31 · history

Acts of Assembly Chapter text (CHAP0022)

2026-02-18 · history

Read first time

2026-01-13 · history

Prefiled and ordered printed; Offered 01-14-2026 26105247D

2026-03-31 · history

Approved by Governor-Chapter 22 (effective 7/1/2026)

2026-03-04 · history

Enrolled

2026-02-12 · history

Reading of amendment waived (Voice Vote)

2026-02-09 · history

Reported from Commerce and Labor with substitute (12-Y 0-N 2-A)

2026-03-10 · history

Governor's Action Deadline 11:59 p.m., April 13, 2026

2026-02-12 · history

Engrossed by Senate - floor substitute

2026-03-04 · history

Signed by Speaker

2026-03-10 · history

Enrolled Bill communicated to Governor on March 10, 2026

2026-02-24 · history

Reported from Labor and Commerce (22-Y 0-N)

2026-02-11 · history

Passed by for the day

2026-02-11 · history

Passed by for the day Block Vote (Voice Vote)

2026-02-12 · history

Substitute by Senator agreed to (Voice Vote)

2026-02-11 · history

Rules suspended

2026-02-16 · history

Fiscal Impact Statement from State Corporation Commission (SB377)

2026-02-12 · history

Reading of substitute waived

2026-02-12 · history

Reading of substitute waived (Voice Vote)

2026-03-09 · history

Fiscal Impact Statement from State Corporation Commission (SB377)

2026-03-04 · history

Signed by President

2026-02-27 · history

Read third time

2026-02-09 · history

Reported from Commerce and Labor with substitute

2026-02-12 · history

Read second time

2026-02-09 · history

Senate committee offered

2026-02-03 · history

Fiscal Impact Statement from State Corporation Commission (SB377)

Raw source record
{
    "id": 85355,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb377\/",
    "tags": {
        "148287": "utility",
        "148288": "electricity",
        "148289": "infrastructure",
        "148290": "business",
        "148291": "scc",
        "148292": "regulation"
    },
    "text": [
        {
            "date": "2026-01-13",
            "number": "SB377",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb377.pdf"
        },
        {
            "date": "2026-02-10",
            "number": "SB377S1"
        },
        {
            "date": "2026-02-12",
            "number": "SB377S2"
        },
        {
            "date": "2026-03-04",
            "number": "SB377ER"
        },
        {
            "date": "2026-03-31",
            "number": "CHAP0022"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "sb377",
    "patron": "Surovell, Scott",
    "status": "signed by governor",
    "chamber": "senate",
    "changes": null,
    "outcome": "passed",
    "related": [
        {
            "id": 85094,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 6,
            "number": "hb1191",
            "status": "signed by governor",
            "catch_line": "Electric substation construction agreements; \"electric cooperatives\" or \"cooperative,\" definitions.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 85847,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 6,
            "number": "hb1379",
            "status": "failed committee",
            "catch_line": "Electric utilities; interconnection service standards, high-demand customers.",
            "date_introduced": "January 21, 2026"
        },
        {
            "id": 85172,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "hb1275",
            "status": "failed committee",
            "catch_line": "Electric utilities; recovery of certain project development costs.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 85513,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "sb509",
            "status": "failed committee",
            "catch_line": "Licensed suppliers of electric energy; aggregate demands, total retail load limit.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84013,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "hb284",
            "status": "signed by governor",
            "catch_line": "Electric utilities; electric demand flexibility programs, high energy demand customers, report.",
            "date_introduced": "January 09, 2026"
        }
    ],
    "summary": "<b>Utility consumer services cooperatives; substation construction agreements.<\/b> Permits an electric cooperative to enter into an agreement to construct a substation with a member receiving regulated electric service, with an electric demand of at least 20 megawatts during the most recent calendar year, that requires a point of interconnection with a transmission line system of 230 kilovolts or more. The bill provides that, upon final completion of a substation constructed under such an agreement, the member shall transfer ownership of such substation to the cooperative for the cooperative to operate and maintain at the member's sole expense. Under the bill, the costs of acquisition, operation, or maintenance of such a substation shall be excluded from the cooperative's general and base rates and shall not be recovered from any other ratepayer. This bill is identical to HB 1191.",
    "version": "CHAP0022",
    "copatron": [
        {
            "shortname": "lbagby",
            "partisanship": 19,
            "name_formatted": "Sen. Lamont Bagby (D-Richmond)"
        },
        {
            "shortname": "cncraig",
            "partisanship": 61,
            "name_formatted": "Sen. Christie New Craig (R-Chesapeake)"
        },
        {
            "shortname": "tepillion",
            "partisanship": 67,
            "name_formatted": "Sen. Todd E. Pillion (R-Abingdon)"
        }
    ],
    "committee": "Commerce and Labor",
    "full_text": "<p class=\"ldtitle\">An Act to amend the Code of Virginia by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a>, relating to electric substation construction agreements; electric cooperatives.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a> as follows:<\/p><p class=\"catchln\"><em class=\"new\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a>. Substation construction agreements; electric cooperatives.<\/ins><\/p><p class=\"section\"><em class=\"new\">A. As used in this section:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Electric cooperative\" or \"cooperative\" means a utility consumer services cooperative organized under Article 1 of Chapter 9.1.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Member\" has the same meaning as provided in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-231.15\/'>56-231.15<\/a>.<\/ins><\/p><p class=\"section\"><em class=\"new\">B. An electric cooperative may enter into an agreement to construct a substation with a member receiving regulated electric service, with an electric demand of at least 20 megawatts during the most recent calendar year, that requires a point of interconnection with a transmission line system of 230 kilovolts or more. Such agreement shall be filed jointly by the member and cooperative with the Commission for informational purposes and, if requested, treated with confidentiality by the Commission. Such substation shall be for dedicated service only to the member's facilities and shall be constructed at the member's sole expense, in accordance with all applicable laws, regulations, reliability standards, and the cooperative's specifications. <\/ins><\/p><p class=\"section\"><em class=\"new\">C. In addition to any inspections or milestones that may be included in an agreement described in subsection B, the member shall notify the cooperative in writing upon substantial completion of the substation. Within 60 days after receiving such notice, the cooperative shall inspect the substation and issue any final construction change orders within 30 days after the inspection.<\/ins><\/p><p class=\"section\"><em class=\"new\">D. Upon final completion of a substation constructed under an agreement described in subsection B, the member shall transfer ownership and control to the cooperative by donation or for mutually agreed consideration, which consideration shall be deemed legally sufficient to transfer ownership. Following such transfer of ownership, the cooperative shall operate and maintain such substation at the member's sole expense, pursuant to the cooperative's applicable rates, terms, and conditions.<\/ins><\/p><p class=\"section\"><em class=\"new\">E. The Commission shall exclude the costs of acquisition, operation, or maintenance of any substation acquired by a cooperative under this section from the cooperative's general and base rates and shall ensure that no costs associated with such substation are recovered from any ratepayer other than the member that entered an agreement to construct the substation. <\/ins><\/p><p class=\"section\"><em class=\"new\">F. No provision of Chapter 5 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-88\/'>56-88<\/a> et seq.) or Chapter 10.1 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-265.1\/'>56-265.1<\/a> et seq.) shall apply to any agreement or acquisition conducted pursuant to this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">G. Any agreement described in subsection B shall be negotiated by the member and cooperative in good faith. If a cooperative fails to negotiate or fails to propose a draft agreement within 120 days after the date of written request for such agreement by the member, the member may file a petition with the Commission to order the cooperative to negotiate and to offer a draft agreement for substation construction by the member. If any such petition is filed, the Commission shall hear the petition, if necessary, within three months after filing and shall issue an order on such petition within six months after filing. The Commission shall establish a fee schedule for the adjudication of such petition, to be payable by the member seeking a draft agreement from the cooperative, which fees shall be assessed for the purposes of funding the Commission's costs of administering and enforcing the provisions of this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">H. In the case of disputes that may arise during negotiation of an agreement described in subsection B, or during the construction and transfer process of the substation, the cooperative and member shall have recourse through the informal and formal dispute resolution processes of the Commission.<\/ins><\/p>",
    "catch_line": "Electric substation construction agreements; \"electric cooperatives\" or \"cooperative,\" definitions.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 762,
    "patron_party": "D",
    "patron_place": "Mount Vernon",
    "summary_hash": "2db5fc832a4a62b3f3858acd23b70c05",
    "patron_prefix": "Sen.",
    "patron_suffix": "(D-Mount Vernon)",
    "status_detail": "signed by governor",
    "_rsun_versions": [
        {
            "id": "6ec0e72c88f8cc4bdd8ca85ca87bfac40445593df76f1b2d8407d1fa6d7f8f9a",
            "code": "CHAP0022",
            "bill_id": 85355,
            "source_url": null,
            "source_date": "2026-03-31",
            "source_hash": "af44ed85433804394038c7bb2cdc2ac65b1ed2f3f2343e6400a320942f3860aa",
            "source_html": "<p class=\"ldtitle\">An Act to amend the Code of Virginia by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a>, relating to electric substation construction agreements; electric cooperatives.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a> as follows:<\/p><p class=\"catchln\"><em class=\"new\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-594.01:2\/'>56-594.01:2<\/a>. Substation construction agreements; electric cooperatives.<\/ins><\/p><p class=\"section\"><em class=\"new\">A. As used in this section:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Electric cooperative\" or \"cooperative\" means a utility consumer services cooperative organized under Article 1 of Chapter 9.1.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Member\" has the same meaning as provided in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-231.15\/'>56-231.15<\/a>.<\/ins><\/p><p class=\"section\"><em class=\"new\">B. An electric cooperative may enter into an agreement to construct a substation with a member receiving regulated electric service, with an electric demand of at least 20 megawatts during the most recent calendar year, that requires a point of interconnection with a transmission line system of 230 kilovolts or more. Such agreement shall be filed jointly by the member and cooperative with the Commission for informational purposes and, if requested, treated with confidentiality by the Commission. Such substation shall be for dedicated service only to the member's facilities and shall be constructed at the member's sole expense, in accordance with all applicable laws, regulations, reliability standards, and the cooperative's specifications. <\/ins><\/p><p class=\"section\"><em class=\"new\">C. In addition to any inspections or milestones that may be included in an agreement described in subsection B, the member shall notify the cooperative in writing upon substantial completion of the substation. Within 60 days after receiving such notice, the cooperative shall inspect the substation and issue any final construction change orders within 30 days after the inspection.<\/ins><\/p><p class=\"section\"><em class=\"new\">D. Upon final completion of a substation constructed under an agreement described in subsection B, the member shall transfer ownership and control to the cooperative by donation or for mutually agreed consideration, which consideration shall be deemed legally sufficient to transfer ownership. Following such transfer of ownership, the cooperative shall operate and maintain such substation at the member's sole expense, pursuant to the cooperative's applicable rates, terms, and conditions.<\/ins><\/p><p class=\"section\"><em class=\"new\">E. The Commission shall exclude the costs of acquisition, operation, or maintenance of any substation acquired by a cooperative under this section from the cooperative's general and base rates and shall ensure that no costs associated with such substation are recovered from any ratepayer other than the member that entered an agreement to construct the substation. <\/ins><\/p><p class=\"section\"><em class=\"new\">F. No provision of Chapter 5 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-88\/'>56-88<\/a> et seq.) or Chapter 10.1 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-265.1\/'>56-265.1<\/a> et seq.) shall apply to any agreement or acquisition conducted pursuant to this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">G. Any agreement described in subsection B shall be negotiated by the member and cooperative in good faith. If a cooperative fails to negotiate or fails to propose a draft agreement within 120 days after the date of written request for such agreement by the member, the member may file a petition with the Commission to order the cooperative to negotiate and to offer a draft agreement for substation construction by the member. If any such petition is filed, the Commission shall hear the petition, if necessary, within three months after filing and shall issue an order on such petition within six months after filing. The Commission shall establish a fee schedule for the adjudication of such petition, to be payable by the member seeking a draft agreement from the cooperative, which fees shall be assessed for the purposes of funding the Commission's costs of administering and enforcing the provisions of this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">H. In the case of disputes that may arise during negotiation of an agreement described in subsection B, or during the construction and transfer process of the substation, the cooperative and member shall have recourse through the informal and formal dispute resolution processes of the Commission.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-03-31",
                    "number": "CHAP0022"
                }
            }
        }
    ],
    "copatron_count": 3,
    "patron_address": [
        "P.O. Box 289",
        "Mount Vernon",
        "VA 22121"
    ],
    "patron_chamber": "senate",
    "patron_started": 2016,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "03\/31\/2026",
            "status": "Acts of Assembly Chapter text (CHAP0022)",
            "date_raw": "2026-03-31",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/31\/2026",
            "status": "Approved by Governor-Chapter 22 (effective 7\/1\/2026)",
            "date_raw": "2026-03-31",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "signed by governor"
        },
        {
            "date": "03\/10\/2026",
            "status": "Governor's Action Deadline 11:59 p.m., April 13, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Enrolled Bill communicated to Governor on March 10, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/09\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB377)",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/04\/2026",
            "status": "Signed by President",
            "date_raw": "2026-03-04",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed"
        },
        {
            "date": "03\/04\/2026",
            "status": "Signed by Speaker",
            "date_raw": "2026-03-04",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/04\/2026",
            "status": "Bill text as passed Senate and House (SB377ER)",
            "date_raw": "2026-03-04",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/04\/2026",
            "status": "Enrolled",
            "date_raw": "2026-03-04",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/27\/2026",
            "status": "Passed House  Block Vote (96-Y 0-N 0-A)",
            "date_raw": "2026-02-27",
            "vote_count": null,
            "lis_vote_id": "299514",
            "translation": "passed house"
        },
        {
            "date": "02\/27\/2026",
            "status": "Read third time",
            "date_raw": "2026-02-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/24\/2026",
            "status": "Reported from Labor and Commerce (22-Y 0-N)",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": "298749",
            "translation": "passed committee"
        },
        {
            "date": "02\/24\/2026",
            "status": "Reported from Labor and Commerce",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": "298749",
            "translation": "passed committee"
        },
        {
            "date": "02\/18\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-02-18",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/18\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-18",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/18\/2026",
            "status": "Placed on Calendar",
            "date_raw": "2026-02-18",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB377)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Read third time and passed Senate (39-Y 0-N 0-A)",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": "297193",
            "translation": "passed senate"
        },
        {
            "date": "02\/12\/2026",
            "status": "Reading of substitute waived",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Engrossed by Senate - floor substitute (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Senator Surovell Substitute agreed to",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296854",
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Reading of substitute waived (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Engrossed by Senate - floor substitute",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Engrossed by Senate (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296856",
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Substitute by Senator agreed to (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296854",
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Reading of amendment waived (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296853",
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Committee substitute rejected (Voice Vote)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296852",
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Floor substitute printed 26107668D-S2 (Surovell)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Floor Offered",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "0",
            "translation": null
        },
        {
            "date": "02\/11\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/11\/2026",
            "status": "Passed by for the day  Block Vote (Voice Vote)",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": "296383",
            "translation": null
        },
        {
            "date": "02\/11\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/11\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 1st reading) (40-Y 0-N 0-A)",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": "296382",
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Committee substitute printed 26107087D-S1",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/09\/2026",
            "status": "Reported from Commerce and Labor with substitute (12-Y 0-N 2-A)",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": "295689",
            "translation": "passed committee"
        },
        {
            "date": "02\/09\/2026",
            "status": "Reported from Commerce and Labor with substitute",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed committee"
        },
        {
            "date": "02\/09\/2026",
            "status": "Senate committee offered",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/03\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB377)",
            "date_raw": "2026-02-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/13\/2026",
            "status": "Referred to Committee on Commerce and Labor",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/13\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26105247D",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 342,
    "date_introduced": "2026-01-13",
    "patron_district": 34,
    "patron_shortname": "sasurovell",
    "committee_chamber": "senate",
    "status_detail_date": "03\/31\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Sen. Scott Surovell (D-Mount Vernon)"
}