Virginia / 2026 Regular Session

2026 Regular Session · Imported snapshot

SB339: SCC; cost allocation proceedings for certain electric utilities, definitions.

failed committee

<b>State Corporation Commission; cost allocation proceedings for certain electric utilities.</b> Directs the State Corporation Commission to conduct proceedings to review cost allocation among different customer classifications for certain electric utilities. For Dominion Energy and Appalachian Power, the Commission is directed to determine if the cost allocation of transmission costs require customers that are not high-load customers, as defined in the bill, to unreasonably subsidize the transmission costs attributable to serving high-load customers by January 1, 2027. For Dominion Energy, the Commission is directed to determine if the current allocation of generation and distribution costs require customers that are not high-load customers to unreasonably subsidize the generation and distribution costs attributable to serving high-load customers by January 1, 2028.

Official bill page · Source: Richmond Sunlight

Ask about SB339

Full bill text

Version SB339S1 · 2026-02-13

Full text

Changes in this version: added text deleted text

Be it enacted by the General Assembly of Virginia:

1. § 1. The State Corporation Commission (the Commission) shall initiate a proceeding to determine if current and proposed allocations of transmission costs among different customer classifications of service for Phase I and Phase II Utilities, or the allocations of transmission costs to any retail customers or electric service providers receiving transmission service from a Phase I or Phase II Utility, require customers that are not high-load customers to unreasonably subsidize the transmission costs attributable to serving customers that are high-load customers. In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or primarily to serve high-load customers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a project to serve one or more high-load customers that is classified as a supplemental transmission project by the regional transmission entity shall be presumed to be designed, constructed, or operated solely or primarily to serve high-load customers, unless otherwise demonstrated by clear and convincing evidence. The Commission shall complete such proceedings by January 1, 2027. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.

§ 2. The Commission shall initiate a proceeding to determine if the current allocation of generation and distribution costs among different customer classifications of service for a Phase II Utility requires customers that are not high-load customers to unreasonably subsidize the generation and distribution costs attributable to serving high-load customers. In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the probability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to allocate costs appropriately among high-load customers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions in the Phase II Utility's biennial rate review proceeding conducted pursuant to § 56-585.1 of the Code of Virginia.

§ 3. The Commission may adopt any regulations or guidelines necessary to comply with the provisions of this act.

§ 4. For the purposes of this act:

"High-load customer" means a customer of a Phase I or Phase II Utility that takes service under such utility's commercial or industrial rate schedule and contracts for an electric demand of 25 megawatts or greater.

"Phase I Utility" and "Phase II Utility" have the same meaning as provided in subdivision A 1 of § 56-585.1 of the Code of Virginia.

"Transmission costs" includes the downstream costs associated with upgrades or modifications to interconnection or distribution infrastructure necessitated to implement a transmission project.

Legislative actions

2026-03-05 · history

Continued to 2027 in Labor and Commerce (Voice Vote)

2026-02-24 · history

Placed on Calendar

2026-02-03 · history

Fiscal Impact Statement from State Corporation Commission (SB339)

2026-02-12 · history

Senate committee offered

2026-02-16 · history

Committee substitute agreed to (Voice Vote)

2026-02-16 · history

Engrossed by Senate - committee substitute (Voice Vote)

2026-02-17 · history

Read third time and passed Senate (40-Y 0-N 0-A)

2026-02-24 · history

Read first time

2026-02-16 · history

Read second time

2026-01-13 · history

Referred to Committee on Commerce and Labor

2026-02-26 · history

Fiscal Impact Statement from State Corporation Commission (SB339)

2026-02-13 · history

Constitutional reading dispensed Block Vote (on 1st reading) (35-Y 0-N 0-A)

2026-02-13 · history

Rules suspended

2026-01-13 · history

Prefiled and ordered printed; Offered 01-14-2026 26104824D

2026-02-24 · history

Referred to Committee on Labor and Commerce

2026-03-03 · history

Subcommittee recommends continuing to 2027 (Voice Vote)

2026-02-16 · history

Engrossed by Senate (Voice Vote)

2026-02-13 · history

Committee substitute printed 26107935D-S1

2026-02-13 · history

Passed by for the day

2026-02-24 · history

Assigned HCL sub: Subcommittee #3

2026-02-12 · history

Reported from Commerce and Labor with substitute

2026-02-12 · history

Reported from Commerce and Labor with substitute (14-Y 1-N)

2026-03-03 · history

House subcommittee offered

Raw source record
{
    "id": 85317,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/sb339\/",
    "tags": {
        "144399": "cost",
        "144400": "energy",
        "144401": "regulation",
        "144402": "services",
        "144403": "utilities"
    },
    "text": [
        {
            "date": "2026-01-13",
            "number": "SB339",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/sb339.pdf"
        },
        {
            "date": "2026-02-13",
            "number": "SB339S1"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "sb339",
    "patron": "Perry, Russet",
    "status": "failed committee",
    "chamber": "senate",
    "changes": null,
    "outcome": "failed",
    "related": [
        {
            "id": 84495,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb658",
            "status": "failed committee",
            "catch_line": "State Corporation Commission; cost allocation proceedings for certain electric utilities.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84744,
            "name": "Rules",
            "year": 2026,
            "count": 3,
            "number": "hb906",
            "status": "failed committee",
            "catch_line": "Energy load flexibility protocols; SCC et al., to evaluate high electric demand customers, report.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84727,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 3,
            "number": "hb889",
            "status": "signed by governor",
            "catch_line": "Transmission lines, certain; Department of Transportation to identify opportunities for siting.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84764,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 3,
            "number": "hb921",
            "status": "signed by governor",
            "catch_line": "Electric utilities; licensed retail suppliers, renewable portfolio standard requirements.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84733,
            "name": "Appropriations",
            "year": 2026,
            "count": 3,
            "number": "hb895",
            "status": "signed by governor",
            "catch_line": "Electric utilities; energy storage requirements, Department of Energy to develop model ordinance.",
            "date_introduced": "January 13, 2026"
        }
    ],
    "summary": "<b>State Corporation Commission; cost allocation proceedings for certain electric utilities.<\/b> Directs the State Corporation Commission to conduct proceedings to review cost allocation among different customer classifications for certain electric utilities. For Dominion Energy and Appalachian Power, the Commission is directed to determine if the cost allocation of transmission costs require customers that are not high-load customers, as defined in the bill, to unreasonably subsidize the transmission costs attributable to serving high-load customers by January 1, 2027. For Dominion Energy, the Commission is directed to determine if the current allocation of generation and distribution costs require customers that are not high-load customers to unreasonably subsidize the generation and distribution costs attributable to serving high-load customers by January 1, 2028.",
    "version": "SB339S1",
    "copatron": null,
    "committee": "Commerce and Labor",
    "full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The State Corporation Commission (the Commission) shall initiate <\/ins><ins>a <\/ins><ins>proceeding to determine if current<\/ins><ins> and proposed<\/ins><ins> allocation<\/ins><ins>s<\/ins><ins> of transmission costs among different customer classifications <\/ins><ins>of service for Phase I and Phase II Utilities,<\/ins><ins> or <\/ins><ins>the allocation<\/ins><ins>s<\/ins><ins> of transmission costs to<\/ins><ins> any retail customers or electric service providers <\/ins><ins>receiving<\/ins><ins> <\/ins><ins>transmission service from a Phase I or Phase II Utility<\/ins><ins>,<\/ins><ins> <\/ins><ins>require customers that are not <\/ins><ins>high-load customers <\/ins><ins>to unreasonably subsidize the <\/ins><ins>transmission <\/ins><ins>cost<\/ins><ins>s attributable to serving customers that are<\/ins><ins> high-load customers<\/ins><ins>.<\/ins><ins> <\/ins><ins>In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or prim<\/ins><ins>arily to serve <\/ins><ins>high-load <\/ins><ins>customers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a<\/ins><ins> project<\/ins><ins> <\/ins><ins>to <\/ins><ins>s<\/ins><ins>erve<\/ins><ins> one or more <\/ins><ins>high-load <\/ins><ins>customers <\/ins><ins>that is classified as a supplemental transmission project by the regional transmission entity <\/ins><ins>shall be presumed to be designed, constructed, or operated solely or primarily to serve <\/ins><ins>high-load <\/ins><ins>customers, unless otherwise demonstrated by clear and convincing evidence<\/ins><ins>. The Commission shall complete such proceedings by January 1, 2027. <\/ins><ins>The Commission may comply with the requirements of this section<\/ins><ins> by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.<\/ins><\/p>\n<p class=section><ins>\u00a7 2. The Commission shall initiate a proceeding to determine if the current allocation of generation and di<\/ins><ins>stribution costs among different customer classifications of service for a Phase II Utility<\/ins><ins> <\/ins><ins>requires customers that are not <\/ins><ins>high-load customers <\/ins><ins>to unreasonably subsidize the<\/ins><ins> generation and distribution<\/ins><ins> costs attributable to serving <\/ins><ins>high-load <\/ins><ins>customer<\/ins><ins>s<\/ins><ins>.<\/ins><ins> In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the prob<\/ins><ins>ability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to a<\/ins><ins>llocate costs appropriately among<\/ins><ins> high-load<\/ins><ins> customers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions <\/ins><ins>in the Phase II Utility's biennial rate review proceeding conducted pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 3. The Commi<\/ins><ins>ssion<\/ins><ins> may adopt any regulations or guidelines necessary to comply with the provisions of this act.<\/ins><\/p>\n<p class=section><ins>\u00a7 4. For the purposes of this act:<\/ins><\/p>\n<p class=section><ins>\"High-load customer\" means a customer of a Phase I or Phase II Utility that takes service under such utility's commercial or industrial rate schedule and contracts for an electric demand of 25 megawatts or greater.<\/ins><\/p>\n<p class=section><ins>\"Phase I Utility\" and \"Phase II Utility\" have the same meaning as provided in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\"Transmission costs\" includes the downstream costs associated with upgrades or modifications to interconnection or distribution infrastructure <\/ins><ins>necessitated <\/ins><ins>to implement a transmission project.<\/ins><\/p>",
    "catch_line": "SCC; cost allocation proceedings for certain electric utilities, definitions.",
    "duplicates": [
        {
            "year": 2027,
            "number": "sb339",
            "patron": "Perry, Russet",
            "status": "failed committee",
            "chamber": "senate",
            "catch_line": "SCC; cost allocation proceedings for certain electric utilities, definitions.",
            "date_introduced": "2026-01-13"
        }
    ],
    "session_id": 32,
    "word_count": 750,
    "patron_party": "D",
    "patron_place": "Leesburg",
    "summary_hash": "5f24c3ea34d324b6ce54c94969244f09",
    "patron_prefix": "Sen.",
    "patron_suffix": "(D-Leesburg)",
    "status_detail": "failed committee",
    "_rsun_versions": [
        {
            "id": "ca29e86a40ef75dba970bf0a565542dc931025cfef8f5fc7256c3441eae3fe6f",
            "code": "SB339S1",
            "bill_id": 85317,
            "source_url": null,
            "source_date": "2026-02-13",
            "source_hash": "6ffe5868ce0ed7a70e2f9c31f21e6f846cafde16433906e3b868f7145eb2d519",
            "source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The State Corporation Commission (the Commission) shall initiate <\/ins><ins>a <\/ins><ins>proceeding to determine if current<\/ins><ins> and proposed<\/ins><ins> allocation<\/ins><ins>s<\/ins><ins> of transmission costs among different customer classifications <\/ins><ins>of service for Phase I and Phase II Utilities,<\/ins><ins> or <\/ins><ins>the allocation<\/ins><ins>s<\/ins><ins> of transmission costs to<\/ins><ins> any retail customers or electric service providers <\/ins><ins>receiving<\/ins><ins> <\/ins><ins>transmission service from a Phase I or Phase II Utility<\/ins><ins>,<\/ins><ins> <\/ins><ins>require customers that are not <\/ins><ins>high-load customers <\/ins><ins>to unreasonably subsidize the <\/ins><ins>transmission <\/ins><ins>cost<\/ins><ins>s attributable to serving customers that are<\/ins><ins> high-load customers<\/ins><ins>.<\/ins><ins> <\/ins><ins>In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or prim<\/ins><ins>arily to serve <\/ins><ins>high-load <\/ins><ins>customers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a<\/ins><ins> project<\/ins><ins> <\/ins><ins>to <\/ins><ins>s<\/ins><ins>erve<\/ins><ins> one or more <\/ins><ins>high-load <\/ins><ins>customers <\/ins><ins>that is classified as a supplemental transmission project by the regional transmission entity <\/ins><ins>shall be presumed to be designed, constructed, or operated solely or primarily to serve <\/ins><ins>high-load <\/ins><ins>customers, unless otherwise demonstrated by clear and convincing evidence<\/ins><ins>. The Commission shall complete such proceedings by January 1, 2027. <\/ins><ins>The Commission may comply with the requirements of this section<\/ins><ins> by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.<\/ins><\/p>\n<p class=section><ins>\u00a7 2. The Commission shall initiate a proceeding to determine if the current allocation of generation and di<\/ins><ins>stribution costs among different customer classifications of service for a Phase II Utility<\/ins><ins> <\/ins><ins>requires customers that are not <\/ins><ins>high-load customers <\/ins><ins>to unreasonably subsidize the<\/ins><ins> generation and distribution<\/ins><ins> costs attributable to serving <\/ins><ins>high-load <\/ins><ins>customer<\/ins><ins>s<\/ins><ins>.<\/ins><ins> In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the prob<\/ins><ins>ability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to a<\/ins><ins>llocate costs appropriately among<\/ins><ins> high-load<\/ins><ins> customers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions <\/ins><ins>in the Phase II Utility's biennial rate review proceeding conducted pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 3. The Commi<\/ins><ins>ssion<\/ins><ins> may adopt any regulations or guidelines necessary to comply with the provisions of this act.<\/ins><\/p>\n<p class=section><ins>\u00a7 4. For the purposes of this act:<\/ins><\/p>\n<p class=section><ins>\"High-load customer\" means a customer of a Phase I or Phase II Utility that takes service under such utility's commercial or industrial rate schedule and contracts for an electric demand of 25 megawatts or greater.<\/ins><\/p>\n<p class=section><ins>\"Phase I Utility\" and \"Phase II Utility\" have the same meaning as provided in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\"Transmission costs\" includes the downstream costs associated with upgrades or modifications to interconnection or distribution infrastructure <\/ins><ins>necessitated <\/ins><ins>to implement a transmission project.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-02-13",
                    "number": "SB339S1"
                }
            }
        }
    ],
    "copatron_count": 0,
    "patron_address": [
        "P.O. Box 6434",
        "Leesburg",
        "VA 20178"
    ],
    "patron_chamber": "senate",
    "patron_started": 2024,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "03\/05\/2026",
            "status": "Continued to 2027 in Labor and Commerce (Voice Vote)",
            "date_raw": "2026-03-05",
            "vote_count": null,
            "lis_vote_id": "300783",
            "translation": "failed committee"
        },
        {
            "date": "03\/03\/2026",
            "status": "Subcommittee recommends continuing to 2027 (Voice Vote)",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": "300242",
            "translation": "failed subcommittee"
        },
        {
            "date": "03\/03\/2026",
            "status": "House subcommittee offered",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB339)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/24\/2026",
            "status": "Assigned HCL sub: Subcommittee #3",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "02\/24\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/24\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/24\/2026",
            "status": "Placed on Calendar",
            "date_raw": "2026-02-24",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/17\/2026",
            "status": "Read third time and passed Senate (40-Y 0-N 0-A)",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": "297938",
            "translation": "passed senate"
        },
        {
            "date": "02\/16\/2026",
            "status": "Engrossed by Senate - committee substitute (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Engrossed by Senate (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": "297690",
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Committee substitute agreed to (Voice Vote)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": "297689",
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 1st reading) (35-Y 0-N 0-A)",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": "297343",
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Committee substitute printed 26107935D-S1",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Reported from Commerce and Labor with substitute (14-Y 1-N)",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296959",
            "translation": "passed committee"
        },
        {
            "date": "02\/12\/2026",
            "status": "Reported from Commerce and Labor with substitute",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": "296959",
            "translation": "passed committee"
        },
        {
            "date": "02\/12\/2026",
            "status": "Senate committee offered",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/03\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (SB339)",
            "date_raw": "2026-02-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/13\/2026",
            "status": "Referred to Committee on Commerce and Labor",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/13\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26104824D",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 531,
    "date_introduced": "2026-01-13",
    "patron_district": 31,
    "patron_shortname": "rwperry",
    "committee_chamber": "house",
    "status_detail_date": "03\/05\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Sen. Russet Perry (D-Leesburg)"
}