HB658: State Corporation Commission; cost allocation proceedings for certain electric utilities.

failed committee

<b>State Corporation Commission; cost allocation proceedings for certain electric utilities.</b> Directs the State Corporation Commission to conduct proceedings to review cost allocation among different customer classifications for certain electric utilities. For Dominion Energy and Appalachian Power, the Commission is directed to determine if the cost allocation of transmission costs require customers that are not data centers to unreasonably subsidize the transmission costs attributable to serving customers that are data centers by January 1, 2027. For Dominion Energy, the Commission is directed to determine if the current allocation of generation and distribution costs require customers that are not data centers to unreasonably subsidize the generation and distribution costs attributable to serving customers that are data centers by January 1, 2028.

Official bill page · Source: Richmond Sunlight

Ask about HB658

Full bill text

Version HB658 · 2026-01-13 · Official source text

Full text

Changes in this version: added text deleted text

Be it enacted by the General Assembly of Virginia:

1. § 1. The State Corporation Commission (the Commission) shall initiate a proceeding to determine if the current allocation of transmission costs among different customer classifications of service for Phase I and Phase II Utilities, as such terms are defined in subdivision A 1 of § 56-585.1 of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of § 58.1-3506 of the Code of Virginia, to unreasonably subsidize the transmission costs attributable to serving customers that are data centers. In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or primarily to serve customers that are data centers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a project to serve one or more customers that are data centers that is classified as a supplemental transmission project by the regional transmission entity shall be presumed to be designed, constructed, or operated solely or primarily to serve customers that are data centers. The Commission shall complete such proceedings by January 1, 2027. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.

§ 2. The State Corporation Commission (the Commission) shall initiate a proceeding to determine if the current allocation of generation and distribution costs among different customer classifications of service for a Phase II Utility, as defined in subdivision A 1 of § 56-585.1 of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of § 58.1-3506 of the Code of Virginia, to unreasonably subsidize the generation and distribution costs attributable to serving customers that are data centers. In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the probability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to allocate costs appropriately among customers that are data centers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions in the Phase II Utility's biennial rate review proceeding conducted pursuant to § 56-585.1 of the Code of Virginia.

§ 3. The State Corporation Commission may adopt any regulations or guidelines necessary to comply with the provisions of this act.

Legislative actions

2026-02-18 · history

Left in Labor and Commerce

2026-01-20 · history

Assigned HCL sub: Subcommittee #3

2026-01-13 · history

Committee Referral Pending

2026-02-10 · history

Subcommittee recommends laying on the table (7-Y 2-N)

2026-01-13 · history

Referred to Committee on Labor and Commerce

2026-02-10 · history

House subcommittee offered

2026-01-13 · history

Prefiled and ordered printed; Offered 01-14-2026 26104557D

2026-02-10 · history

Subcommittee recommends laying on the table

2026-02-03 · history

Fiscal Impact Statement from State Corporation Commission (HB658)

Raw source record
{
    "id": 84495,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb658\/",
    "tags": {
        "143638": "energy",
        "143639": "utilities",
        "143640": "regulation",
        "143641": "cost",
        "143642": "services"
    },
    "text": [
        {
            "date": "2026-01-13",
            "number": "HB658",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb658.pdf"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "hb658",
    "patron": "Maldonado, Michelle",
    "status": "failed committee",
    "chamber": "house",
    "changes": null,
    "outcome": "failed",
    "related": [
        {
            "id": 85317,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "sb339",
            "status": "failed committee",
            "catch_line": "SCC; cost allocation proceedings for certain electric utilities, definitions.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84915,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 3,
            "number": "sb255",
            "status": "signed by governor",
            "catch_line": "Electric utilities; shared solar programs, Phase I Utility.",
            "date_introduced": "January 12, 2026"
        },
        {
            "id": 83732,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 3,
            "number": "hb74",
            "status": "failed committee",
            "catch_line": "Electric utilities; recovery of development costs associated with small modular reactor.",
            "date_introduced": "December 31, 2025"
        },
        {
            "id": 84771,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 3,
            "number": "hb928",
            "status": "incorporated",
            "catch_line": "Electric utilities; small portable solar generation devices, local regulation.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 85447,
            "name": "Finance",
            "year": 2026,
            "count": 3,
            "number": "sb448",
            "status": "signed by governor",
            "catch_line": "Electric utilities; energy storage requirements, Department of Energy to develop model ordinance.",
            "date_introduced": "January 13, 2026"
        }
    ],
    "summary": "<b>State Corporation Commission; cost allocation proceedings for certain electric utilities.<\/b> Directs the State Corporation Commission to conduct proceedings to review cost allocation among different customer classifications for certain electric utilities. For Dominion Energy and Appalachian Power, the Commission is directed to determine if the cost allocation of transmission costs require customers that are not data centers to unreasonably subsidize the transmission costs attributable to serving customers that are data centers by January 1, 2027. For Dominion Energy, the Commission is directed to determine if the current allocation of generation and distribution costs require customers that are not data centers to unreasonably subsidize the generation and distribution costs attributable to serving customers that are data centers by January 1, 2028.",
    "version": "HB658",
    "copatron": [
        {
            "shortname": "jcmcauliff",
            "partisanship": null,
            "name_formatted": "Del. John McAuliff (D-Loudoun)"
        },
        {
            "shortname": "ishin",
            "partisanship": 12,
            "name_formatted": "Del. Irene Shin (D-Herndon)"
        },
        {
            "shortname": "mjwebert",
            "partisanship": 73,
            "name_formatted": "Del. Michael Webert (R-Marshall)"
        }
    ],
    "committee": "Commerce and Labor",
    "full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The State Corporation Commission (the Commission) shall initiate <\/ins><ins>a <\/ins><ins>proceeding to determine if the current allocation of transmission costs among different customer classifications <\/ins><ins>of service for Phase I and Phase II Utilities, as such terms are defined in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-3506\/'>58.1-3506<\/a> of the Code of Virginia, to unreasonably subsidize the <\/ins><ins>transmission <\/ins><ins>cost<\/ins><ins>s attributable to serving customers that are data centers. In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or prim<\/ins><ins>arily to serve customers that are data centers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a<\/ins><ins> project<\/ins><ins> <\/ins><ins>to <\/ins><ins>s<\/ins><ins>erve<\/ins><ins> one or more customers that are data centers<\/ins><ins> that is classified as a supplemental transmission project by the regional transmission entity shall be presumed to be designed, constructed, or operated solely or primarily to serve customers tha<\/ins><ins>t are data centers. The Commission shall complete such proceedings by January 1, 2027. <\/ins><ins>The Commission may comply with the requirements of this section<\/ins><ins> by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.<\/ins><ins> <\/ins><\/p>\n<p class=section><ins>\u00a7 2. The State Corporation Commission (the Commission) shall initiate a proceeding to determine if the current allocation of generation and di<\/ins><ins>stribution costs among different customer classifications of service for a Phase II Utility, as defined in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-3506\/'>58.1-3506<\/a> of the Code of Virginia, to unreasonably subsidize the<\/ins><ins> generation and distribution<\/ins><ins> costs attributable to serving customers that are data centers.<\/ins><ins> In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the prob<\/ins><ins>ability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to a<\/ins><ins>llocate costs appropriately among customers that are data centers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions <\/ins><ins>in the Phase II Utility's biennial rate review proceeding conducted pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 3. The State Corporation Commi<\/ins><ins>ssion<\/ins><ins> may adopt any regulations or guidelines necessary to comply with the provisions of this act.<\/ins><\/p>",
    "catch_line": "State Corporation Commission; cost allocation proceedings for certain electric utilities.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 635,
    "patron_party": "D",
    "patron_place": "Manassas",
    "summary_hash": "0e97eb12f7d50f0dc86e4cccfe13550e",
    "patron_prefix": "Del.",
    "patron_suffix": "(D-Manassas)",
    "status_detail": "failed committee",
    "_rsun_versions": [
        {
            "id": "26fe75444d89ae39dca9659036be9be4b252b215d9ac50677ee874869e065354",
            "code": "HB658",
            "bill_id": 84495,
            "source_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb658.pdf",
            "source_date": "2026-01-13",
            "source_hash": "ad6b09a77764bb0631f56833e2233b4ca5146e770c3096d0c78fdc20dbd208b2",
            "source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The State Corporation Commission (the Commission) shall initiate <\/ins><ins>a <\/ins><ins>proceeding to determine if the current allocation of transmission costs among different customer classifications <\/ins><ins>of service for Phase I and Phase II Utilities, as such terms are defined in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-3506\/'>58.1-3506<\/a> of the Code of Virginia, to unreasonably subsidize the <\/ins><ins>transmission <\/ins><ins>cost<\/ins><ins>s attributable to serving customers that are data centers. In conducting such proceeding, the Commission shall ensure to the maximum extent possible that the costs of any transmission projects that are designed, constructed, or operated solely or prim<\/ins><ins>arily to serve customers that are data centers are not recovered from any other customers of the Phase I or Phase II Utility. For the purposes of such proceeding, a<\/ins><ins> project<\/ins><ins> <\/ins><ins>to <\/ins><ins>s<\/ins><ins>erve<\/ins><ins> one or more customers that are data centers<\/ins><ins> that is classified as a supplemental transmission project by the regional transmission entity shall be presumed to be designed, constructed, or operated solely or primarily to serve customers tha<\/ins><ins>t are data centers. The Commission shall complete such proceedings by January 1, 2027. <\/ins><ins>The Commission may comply with the requirements of this section<\/ins><ins> by incorporating the provisions of this section in an ongoing proceeding for a Phase I or Phase II Utility.<\/ins><ins> <\/ins><\/p>\n<p class=section><ins>\u00a7 2. The State Corporation Commission (the Commission) shall initiate a proceeding to determine if the current allocation of generation and di<\/ins><ins>stribution costs among different customer classifications of service for a Phase II Utility, as defined in subdivision A 1 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia, requires customers that are not data centers, as defined in subdivision A 43 of \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-3506\/'>58.1-3506<\/a> of the Code of Virginia, to unreasonably subsidize the<\/ins><ins> generation and distribution<\/ins><ins> costs attributable to serving customers that are data centers.<\/ins><ins> In conducting such proceeding, the Commission shall direct the Phase II Utility to propose at least three alternative cost allocations for the Commission's consideration, provided in executable formats that can be fully replicated, and at least one such alternative cost allocation shall represent the prob<\/ins><ins>ability of dispatch methodology as described in the electric utility cost allocation manual published by the National Association of Regulatory Utility Commissioners. The Commission may order any changes to the Phase II Utility's cost allocation structure that the Commission determines to be appropriate to a<\/ins><ins>llocate costs appropriately among customers that are data centers and other customers of the Phase II Utility. The Commission shall complete such proceedings by January 1, 2028. The Commission may comply with the requirements of this section by incorporating the provisions of this section in an ongoing proceeding for a Phase II Utility or by incorporating such provisions <\/ins><ins>in the Phase II Utility's biennial rate review proceeding conducted pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 3. The State Corporation Commi<\/ins><ins>ssion<\/ins><ins> may adopt any regulations or guidelines necessary to comply with the provisions of this act.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-01-13",
                    "number": "HB658",
                    "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb658.pdf"
                }
            }
        }
    ],
    "copatron_count": 3,
    "patron_address": [
        "9108 Church Street",
        "#102",
        "Manassas",
        "VA 20108"
    ],
    "patron_chamber": "house",
    "patron_started": 2022,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "02\/18\/2026",
            "status": "Left in Labor and Commerce",
            "date_raw": "2026-02-18",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "failed committee"
        },
        {
            "date": "02\/10\/2026",
            "status": "Subcommittee recommends laying on the table (7-Y 2-N)",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": "296096",
            "translation": "failed subcommittee"
        },
        {
            "date": "02\/10\/2026",
            "status": "Subcommittee recommends laying on the table",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "failed subcommittee"
        },
        {
            "date": "02\/10\/2026",
            "status": "House subcommittee offered",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/03\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB658)",
            "date_raw": "2026-02-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/20\/2026",
            "status": "Assigned HCL sub: Subcommittee #3",
            "date_raw": "2026-01-20",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "01\/13\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/13\/2026",
            "status": "Committee Referral Pending",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/13\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26104557D",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 485,
    "date_introduced": "2026-01-13",
    "patron_district": 20,
    "patron_shortname": "memaldonado",
    "committee_chamber": "house",
    "status_detail_date": "02\/18\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Del. Michelle Maldonado (D-Manassas)"
}