HB562: Electric cooperatives; authorized to establish and implement a virtual power plant program.

signed by governor

<b>Electric utilities; virtual power plant program; electric cooperatives.</b> Authorizes electric cooperatives to establish and implement a virtual power plant program. The bill defines a virtual power plant as an aggregation of distributed energy resources, enrolled either directly with an electric cooperative or indirectly through an aggregator, that are operated in coordination to provide one or more grid services. Under the bill, an electric cooperative may offer incentives to residential customers to purchase battery storage devices and is required to evaluate various methods to optimize demand. This bill is identical to SB 487.

Official bill page · Source: Richmond Sunlight

Ask about HB562

Full bill text

Version CHAP0044 · 2026-03-31 · Official source text

Full text

Changes in this version: added text deleted text

An Act to amend the Code of Virginia by adding a section numbered 56-585.1:17, relating to electric cooperatives; virtual power plant program.

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding a section numbered 56-585.1:17 as follows:

§ 56-585.1:17. Virtual power plant program; electric cooperatives.

A. As used in this section:

"Aggregator" means an individual or entity, other than the electric cooperative, that enrolls customers in a virtual power plant program and coordinates the operation of enrolled energy resources. An aggregator shall not be considered an electric utility by virtue of participating in a virtual power plant program but shall, as part of its agreement with a participating cooperative, receive participating customer and grid data from the cooperative to participate in such program.

"Distributed energy resource" means a resource of up to five megawatts that is located on the customer's premises or is interconnected with the distribution system and produces or stores electricity or modifies the timing or amount of a customer's electricity consumption.

"Electric cooperative" or "cooperative" means a utility formed under or subject to Article 1 of Chapter 9.1 (§ 56-231.15 et seq.).

"Eligible technology" means a distributed energy resource that meets the requirements for participation in a virtual power plant program and does not emit carbon dioxide as a byproduct of combusting fuel or manufacturing fuel for combustion to generate electricity.

"Grid event" means a grid condition for which the electric cooperative schedules or remotely dispatches enrolled devices to respond.

"Grid service" means a capacity, energy, or ancillary service that supports grid operations.

"Historically economically disadvantaged community" has the same meaning as provided in § 56-576.

"Virtual power plant" means an aggregation of distributed energy resources, enrolled either directly with an electric cooperative or indirectly through an aggregator, that are operated in coordination to provide one or more grid services.

B. On or after January 1, 2027, notwithstanding any other provision of law, an electric cooperative may, without Commission approval, upon an affirmative resolution of its board of directors and without the requirement of any filing other than as required by this section, propose, establish, and implement a virtual power plant program, provided that such program adheres to the requirements of this section. This regulated, tariffed program shall be reviewable by the Commission at the electric cooperative's next general rate proceeding. An electric cooperative shall recover the costs of such virtual power plant program through a new rate schedule established by this section or otherwise through its rates. An electric cooperative establishing such a program shall file a copy of any such new rate schedule with the Commission for informational purposes.

C. Any such virtual power plant program shall consist of aggregations of distributed energy resources. An electric cooperative may utilize any existing or proposed distributed energy programs to further the development of virtual power plants in the Commonwealth. An electric cooperative that establishes a virtual power plant program shall demonstrate in the informational filing required by subsection B that the cooperative has evaluated funding opportunities from the federal government. In furthering the goals of such program, the electric cooperative may offer incentives to residential customers to purchase battery storage devices, and if the cooperative does offer such incentives, it shall conduct a competitive solicitation for the provision of such battery storage devices that is open to cooperative-owned and non-cooperative-owned resources.

D. In conducting such virtual power plant program, the electric cooperative shall evaluate methods to holistically optimize demand, including (i) a stakeholder process to receive feedback on virtual power plant program design; (ii) a review of reasonable enrollment and performance incentives for participating customers; (iii) potential incentives for the purchase of a battery storage device, including increased incentives for customers in historically economically disadvantaged communities; (iv) operational parameters for grid services, including the annual maximum number of grid events, the maximum duration of such grid events, and conditions under which a participating customer may opt out of a grid event; (v) reasonable mechanisms to disenroll customers for nonperformance; and (vi) preliminary development of a virtual power plant program tariff that is designed to (a) allow customers with technologies, including battery storage, non-battery storage, smart thermostat, or managed electric vehicle charging technologies, to enroll their eligible technologies in such program; (b) provide a mechanism to incorporate existing programs, including smart thermostat demand response programs, electric vehicle charging programs, and battery storage programs, into such tariff; (c) specify compensable grid services for each eligible technology, including peak demand reduction, voltage support, and emergency services; and (d) specify pay-for-performance compensation mechanisms for such grid services.

Legislative actions

2026-02-26 · history

Floor Offered

2026-02-23 · history

Reported from Commerce and Labor (14-Y 0-N)

2026-02-03 · history

Constitutional reading dispensed (on 1st reading)

2026-02-26 · history

Reading of substitute waived

2026-01-27 · history

Reported from Labor and Commerce (22-Y 0-N)

2026-01-20 · history

Assigned HCL sub: Subcommittee #3

2026-02-26 · history

Floor substitute printed 26108702D-S1 (McPike)

2026-02-25 · history

Passed by for the day

2026-01-22 · history

Subcommittee recommends reporting

2026-03-31 · history

Acts of Assembly Chapter text (CHAP0044)

2026-03-31 · history

Approved by Governor-Chapter 44 (effective 7/1/2026)

2026-02-02 · history

Read third time and passed House Block Vote (99-Y 0-N 0-A)

2026-03-06 · history

Signed by President

2026-02-26 · history

Substitute by Senator agreed to (Voice Vote)

2026-01-22 · history

Subcommittee recommends reporting (9-Y 0-N)

2026-03-06 · history

Bill text as passed House and Senate (HB562ER)

2026-02-25 · history

Rules suspended

2026-02-23 · history

Reported from Commerce and Labor

2026-02-26 · history

Passed Senate with substitute (39-Y 1-N 0-A)

2026-03-10 · history

Governor's Action Deadline 11:59 p.m., April 13, 2026

2026-02-03 · history

Referred to Committee on Commerce and Labor

2026-02-25 · history

Passed by for the day Block Vote (Voice Vote)

2026-03-10 · history

Enrolled Bill communicated to Governor on March 10, 2026

2026-01-13 · history

Referred to Committee on Labor and Commerce

2026-03-06 · history

Enrolled

2026-03-02 · history

Senate substitute agreed to by House (98-Y 1-N 0-A)

2026-02-26 · history

Read third time

2026-03-06 · history

Signed by Speaker

2026-01-29 · history

Read first time

2026-02-26 · history

Engrossed by Senate - committee substitute

2026-01-30 · history

Read second time and engrossed

2026-01-27 · history

Reported from Labor and Commerce

2026-01-19 · history

Fiscal Impact Statement from State Corporation Commission (HB562)

2026-01-13 · history

Prefiled and ordered printed; Offered 01-14-2026 26105224D

2026-03-12 · history

Fiscal Impact Statement from State Corporation Commission (HB562)

2026-02-26 · history

Reading of amendment waived (Voice Vote)

2026-02-26 · history

Senator McPike Substitute agreed to

2026-02-25 · history

Constitutional reading dispensed Block Vote (on 2nd reading) (40-Y 0-N 0-A)

2026-02-26 · history

Engrossed by Senate - floor substitute

Raw source record
{
    "id": 84393,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb562\/",
    "tags": {
        "151849": "electricity",
        "151850": "utility",
        "151851": "energy",
        "151852": "program",
        "151853": "incentive",
        "151858": "technology",
        "151859": "environment",
        "154023": "regulation"
    },
    "text": [
        {
            "date": "2026-01-13",
            "number": "HB562"
        },
        {
            "date": "2026-02-26",
            "number": "HB562S1"
        },
        {
            "date": "2026-03-06",
            "number": "HB562ER"
        },
        {
            "date": "2026-03-31",
            "number": "CHAP0044"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "hb562",
    "patron": "Reid, David",
    "status": "signed by governor",
    "chamber": "house",
    "changes": null,
    "outcome": "passed",
    "related": [
        {
            "id": 85486,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 8,
            "number": "sb487",
            "status": "signed by governor",
            "catch_line": "Electric cooperatives; authorized to establish and implement a virtual power plant program.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 85311,
            "name": "Finance",
            "year": 2026,
            "count": 5,
            "number": "sb333",
            "status": "signed by governor",
            "catch_line": "Remediated Mine Gas Grant Program; established, report.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84991,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb1090",
            "status": "failed committee",
            "catch_line": "Electric utilities; emissions intensity target program.",
            "date_introduced": "January 14, 2026"
        },
        {
            "id": 84446,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb615",
            "status": "failed committee",
            "catch_line": "Electric utilities; renewable portfolio standard program, deficiency payments.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 85979,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "hb1467",
            "status": "signed by governor",
            "catch_line": "Electric utilities; virtual power plant pilot program, Phase I Utilities.",
            "date_introduced": "January 23, 2026"
        }
    ],
    "summary": "<b>Electric utilities; virtual power plant program; electric cooperatives.<\/b> Authorizes electric cooperatives to establish and implement a virtual power plant program. The bill defines a virtual power plant as an aggregation of distributed energy resources, enrolled either directly with an electric cooperative or indirectly through an aggregator, that are operated in coordination to provide one or more grid services. Under the bill, an electric cooperative may offer incentives to residential customers to purchase battery storage devices and is required to evaluate various methods to optimize demand. This bill is identical to SB 487.",
    "version": "CHAP0044",
    "copatron": [
        {
            "shortname": "jsmcpike",
            "partisanship": 36,
            "name_formatted": "Sen. Jeremy McPike (D-Dale City)"
        }
    ],
    "committee": "Commerce and Labor",
    "full_text": "<p class=\"ldtitle\">An Act to amend the Code of Virginia by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a>, relating to electric cooperatives; virtual power plant program.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a> as follows:<\/p><p class=\"catchln\"><em class=\"new\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a>. Virtual power plant program; electric cooperatives.<\/ins><\/p><p class=\"section\"><em class=\"new\">A. As used in this section:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Aggregator\" means an individual or entity, other than the electric cooperative, that enrolls customers in a virtual power plant program and coordinates the operation of enrolled energy resources. An aggregator shall not be considered an electric utility by virtue of participating in a virtual power plant program but shall, as part of its agreement with a participating cooperative, receive participating customer and grid data from the cooperative to participate in such program.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Distributed energy resource\" means a resource of up to five megawatts that is located on the customer's premises or is interconnected with the distribution system and produces or stores electricity or modifies the timing or amount of a customer's electricity consumption.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Electric cooperative\" or \"cooperative\" means a utility formed under or subject to Article 1 of Chapter 9.1 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-231.15\/'>56-231.15<\/a> et seq.).<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Eligible technology\" means a distributed energy resource that meets the requirements for participation in a virtual power plant program and does not emit carbon dioxide as a byproduct of combusting fuel or manufacturing fuel for combustion to generate electricity.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Grid event\" means a grid condition for which the electric cooperative schedules or remotely dispatches enrolled devices to respond.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Grid service\" means a capacity, energy, or ancillary service that supports grid operations.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Historically economically disadvantaged community\" has the same meaning as provided in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-576\/'>56-576<\/a>.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Virtual power plant\" means an aggregation of distributed energy resources, enrolled either directly with an electric cooperative or indirectly through an aggregator, that are operated in coordination to provide one or more grid services.<\/ins><\/p><p class=\"section\"><em class=\"new\">B. On or after January 1, 2027, notwithstanding any other provision of law, an electric cooperative may, without Commission approval, upon an affirmative resolution of its board of directors and without the requirement of any filing other than as required by this section, propose, establish, and implement a virtual power plant program, provided that such program adheres to the requirements of this section. This regulated, tariffed program shall be reviewable by the Commission at the electric cooperative's next general rate proceeding. An electric cooperative shall recover the costs of such virtual power plant program through a new rate schedule established by this section or otherwise through its rates. An electric cooperative establishing such a program shall file a copy of any such new rate schedule with the Commission for informational purposes.<\/ins><\/p><p class=\"section\"><em class=\"new\">C. Any such virtual power plant program shall consist of aggregations of distributed energy resources. An electric cooperative may utilize any existing or proposed distributed energy programs to further the development of virtual power plants in the Commonwealth. An electric cooperative that establishes a virtual power plant program shall demonstrate in the informational filing required by subsection B that the cooperative has evaluated funding opportunities from the federal government. In furthering the goals of such program, the electric cooperative may offer incentives to residential customers to purchase battery storage devices, and if the cooperative does offer such incentives, it shall conduct a competitive solicitation for the provision of such battery storage devices that is open to cooperative-owned and non-cooperative-owned resources.<\/ins><\/p><p class=\"section\"><em class=\"new\">D. In conducting such virtual power plant program, the electric cooperative shall evaluate methods to holistically optimize demand, including (i) a stakeholder process to receive feedback on virtual power plant program design; (ii) a review of reasonable enrollment and performance incentives for participating customers; (iii) potential incentives for the purchase of a battery storage device, including increased incentives for customers in historically economically disadvantaged communities; (iv) operational parameters for grid services, including the annual maximum number of grid events, the maximum duration of such grid events, and conditions under which a participating customer may opt out of a grid event; (v) reasonable mechanisms to disenroll customers for nonperformance; and (vi) preliminary development of a virtual power plant program tariff that is designed to (a) allow customers with technologies, including battery storage, non-battery storage, smart thermostat, or managed electric vehicle charging technologies, to enroll their eligible technologies in such program; (b) provide a mechanism to incorporate existing programs, including smart thermostat demand response programs, electric vehicle charging programs, and battery storage programs, into such tariff; (c) specify compensable grid services for each eligible technology, including peak demand reduction, voltage support, and emergency services; and (d) specify pay-for-performance compensation mechanisms for such grid services.<\/ins><\/p>",
    "catch_line": "Electric cooperatives; authorized to establish and implement a virtual power plant program.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 929,
    "patron_party": "D",
    "patron_place": "Ashburn",
    "summary_hash": "85e3846968dea1acc8fe2af1b55268a4",
    "patron_prefix": "Del.",
    "patron_suffix": "(D-Ashburn)",
    "status_detail": "signed by governor",
    "_rsun_versions": [
        {
            "id": "0ca26c89f6d7bf17754e7160231f912540df444fbb081644c632eef77180dd09",
            "code": "CHAP0044",
            "bill_id": 84393,
            "source_url": null,
            "source_date": "2026-03-31",
            "source_hash": "5953035f2bcbaba080ae98d0058c8a1d14f66912563e6373bdd42e12c9ce4fa1",
            "source_html": "<p class=\"ldtitle\">An Act to amend the Code of Virginia by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a>, relating to electric cooperatives; virtual power plant program.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"enactcls\">1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a> as follows:<\/p><p class=\"catchln\"><em class=\"new\">\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:17\/'>56-585.1:17<\/a>. Virtual power plant program; electric cooperatives.<\/ins><\/p><p class=\"section\"><em class=\"new\">A. As used in this section:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Aggregator\" means an individual or entity, other than the electric cooperative, that enrolls customers in a virtual power plant program and coordinates the operation of enrolled energy resources. An aggregator shall not be considered an electric utility by virtue of participating in a virtual power plant program but shall, as part of its agreement with a participating cooperative, receive participating customer and grid data from the cooperative to participate in such program.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Distributed energy resource\" means a resource of up to five megawatts that is located on the customer's premises or is interconnected with the distribution system and produces or stores electricity or modifies the timing or amount of a customer's electricity consumption.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Electric cooperative\" or \"cooperative\" means a utility formed under or subject to Article 1 of Chapter 9.1 (\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-231.15\/'>56-231.15<\/a> et seq.).<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Eligible technology\" means a distributed energy resource that meets the requirements for participation in a virtual power plant program and does not emit carbon dioxide as a byproduct of combusting fuel or manufacturing fuel for combustion to generate electricity.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Grid event\" means a grid condition for which the electric cooperative schedules or remotely dispatches enrolled devices to respond.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Grid service\" means a capacity, energy, or ancillary service that supports grid operations.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Historically economically disadvantaged community\" has the same meaning as provided in \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-576\/'>56-576<\/a>.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Virtual power plant\" means an aggregation of distributed energy resources, enrolled either directly with an electric cooperative or indirectly through an aggregator, that are operated in coordination to provide one or more grid services.<\/ins><\/p><p class=\"section\"><em class=\"new\">B. On or after January 1, 2027, notwithstanding any other provision of law, an electric cooperative may, without Commission approval, upon an affirmative resolution of its board of directors and without the requirement of any filing other than as required by this section, propose, establish, and implement a virtual power plant program, provided that such program adheres to the requirements of this section. This regulated, tariffed program shall be reviewable by the Commission at the electric cooperative's next general rate proceeding. An electric cooperative shall recover the costs of such virtual power plant program through a new rate schedule established by this section or otherwise through its rates. An electric cooperative establishing such a program shall file a copy of any such new rate schedule with the Commission for informational purposes.<\/ins><\/p><p class=\"section\"><em class=\"new\">C. Any such virtual power plant program shall consist of aggregations of distributed energy resources. An electric cooperative may utilize any existing or proposed distributed energy programs to further the development of virtual power plants in the Commonwealth. An electric cooperative that establishes a virtual power plant program shall demonstrate in the informational filing required by subsection B that the cooperative has evaluated funding opportunities from the federal government. In furthering the goals of such program, the electric cooperative may offer incentives to residential customers to purchase battery storage devices, and if the cooperative does offer such incentives, it shall conduct a competitive solicitation for the provision of such battery storage devices that is open to cooperative-owned and non-cooperative-owned resources.<\/ins><\/p><p class=\"section\"><em class=\"new\">D. In conducting such virtual power plant program, the electric cooperative shall evaluate methods to holistically optimize demand, including (i) a stakeholder process to receive feedback on virtual power plant program design; (ii) a review of reasonable enrollment and performance incentives for participating customers; (iii) potential incentives for the purchase of a battery storage device, including increased incentives for customers in historically economically disadvantaged communities; (iv) operational parameters for grid services, including the annual maximum number of grid events, the maximum duration of such grid events, and conditions under which a participating customer may opt out of a grid event; (v) reasonable mechanisms to disenroll customers for nonperformance; and (vi) preliminary development of a virtual power plant program tariff that is designed to (a) allow customers with technologies, including battery storage, non-battery storage, smart thermostat, or managed electric vehicle charging technologies, to enroll their eligible technologies in such program; (b) provide a mechanism to incorporate existing programs, including smart thermostat demand response programs, electric vehicle charging programs, and battery storage programs, into such tariff; (c) specify compensable grid services for each eligible technology, including peak demand reduction, voltage support, and emergency services; and (d) specify pay-for-performance compensation mechanisms for such grid services.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-03-31",
                    "number": "CHAP0044"
                }
            }
        }
    ],
    "copatron_count": 1,
    "patron_address": [
        "P.O. Box 4132",
        "Ashburn",
        "VA 20148"
    ],
    "patron_chamber": "house",
    "patron_started": 2018,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "03\/31\/2026",
            "status": "Acts of Assembly Chapter text (CHAP0044)",
            "date_raw": "2026-03-31",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/31\/2026",
            "status": "Approved by Governor-Chapter 44 (effective 7\/1\/2026)",
            "date_raw": "2026-03-31",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "signed by governor"
        },
        {
            "date": "03\/12\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB562)",
            "date_raw": "2026-03-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Governor's Action Deadline 11:59 p.m., April 13, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Enrolled Bill communicated to Governor on March 10, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/06\/2026",
            "status": "Signed by President",
            "date_raw": "2026-03-06",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed"
        },
        {
            "date": "03\/06\/2026",
            "status": "Signed by Speaker",
            "date_raw": "2026-03-06",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/06\/2026",
            "status": "Bill text as passed House and Senate (HB562ER)",
            "date_raw": "2026-03-06",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/06\/2026",
            "status": "Enrolled",
            "date_raw": "2026-03-06",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/02\/2026",
            "status": "Senate substitute agreed to by House (98-Y 1-N 0-A)",
            "date_raw": "2026-03-02",
            "vote_count": null,
            "lis_vote_id": "299797",
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Engrossed by Senate - committee substitute",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Engrossed by Senate - floor substitute",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Senator McPike Substitute agreed to",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299239",
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Reading of substitute waived",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Passed Senate with substitute (39-Y 1-N 0-A)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299240",
            "translation": "passed senate"
        },
        {
            "date": "02\/26\/2026",
            "status": "Substitute by Senator agreed to (Voice Vote)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299239",
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Reading of amendment waived (Voice Vote)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299238",
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Read third time",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Floor substitute printed 26108702D-S1 (McPike)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Floor Offered",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "0",
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Passed by for the day  Block Vote (Voice Vote)",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": "298921",
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 2nd reading) (40-Y 0-N 0-A)",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": "298920",
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/23\/2026",
            "status": "Reported from Commerce and Labor (14-Y 0-N)",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": "298534",
            "translation": "passed committee"
        },
        {
            "date": "02\/23\/2026",
            "status": "Reported from Commerce and Labor",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": "298534",
            "translation": "passed committee"
        },
        {
            "date": "02\/03\/2026",
            "status": "Referred to Committee on Commerce and Labor",
            "date_raw": "2026-02-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/03\/2026",
            "status": "Constitutional reading dispensed (on 1st reading)",
            "date_raw": "2026-02-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/02\/2026",
            "status": "Read third time and passed House  Block Vote (99-Y 0-N 0-A)",
            "date_raw": "2026-02-02",
            "vote_count": null,
            "lis_vote_id": "293691",
            "translation": "passed house"
        },
        {
            "date": "01\/30\/2026",
            "status": "Read second time and engrossed",
            "date_raw": "2026-01-30",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/29\/2026",
            "status": "Read first time",
            "date_raw": "2026-01-29",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/27\/2026",
            "status": "Reported from Labor and Commerce (22-Y 0-N)",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": "292511",
            "translation": "passed committee"
        },
        {
            "date": "01\/27\/2026",
            "status": "Reported from Labor and Commerce",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed committee"
        },
        {
            "date": "01\/22\/2026",
            "status": "Subcommittee recommends reporting (9-Y 0-N)",
            "date_raw": "2026-01-22",
            "vote_count": null,
            "lis_vote_id": "291991",
            "translation": "passed subcommittee"
        },
        {
            "date": "01\/22\/2026",
            "status": "Subcommittee recommends reporting",
            "date_raw": "2026-01-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed subcommittee"
        },
        {
            "date": "01\/20\/2026",
            "status": "Assigned HCL sub: Subcommittee #3",
            "date_raw": "2026-01-20",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "01\/19\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB562)",
            "date_raw": "2026-01-19",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/13\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/13\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26105224D",
            "date_raw": "2026-01-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 431,
    "date_introduced": "2026-01-13",
    "patron_district": 28,
    "patron_shortname": "dareid",
    "committee_chamber": "house",
    "status_detail_date": "03\/31\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Del. David Reid (D-Loudoun)"
}