<b>Electric utilities; certificate of operation for high-load facilities.</b> Prohibits any person from operating a high-load facility, defined in the bill as a facility whose electricity demand exceeds 25 megawatts that was not operating before July 1, 2026, without first having obtained a certificate of operation from the State Corporation Commission. The bill includes factors for the Commission to consider in reviewing a petition to operate a high-load facility. The bill establishes a presumption that a high-load facility shall be considered to have met certain requirements if the high-load facility has secured sufficient contracts for energy storage resources or zero-carbon electric generating resources or that the high-load facility has a plan to implement sufficient demand reduction measures. The bill also requires the Commission to consider certain factors in a review of a petition for a certificate to operate a high-load facility, including whether there is sufficient energy, capacity, and grid infrastructure to support the operation of the high-load facility and whether the operation of the high-load facility would create an unreasonable cross-subsidy across customers served by the incumbent electric utility.
Raw source record
{
"id": 83822,
"url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb155\/",
"tags": {
"142152": "electricity",
"142153": "regulation",
"142154": "energy",
"142155": "infrastructure",
"142158": "utilities",
"144826": "data center",
"144827": "data"
},
"text": [
{
"date": "2026-01-06",
"number": "HB155",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb155.pdf"
}
],
"type": "bill",
"year": 2026,
"video": null,
"number": "hb155",
"patron": "Thomas, Josh",
"status": "failed committee",
"chamber": "house",
"changes": null,
"outcome": "failed",
"related": [
{
"id": 85668,
"name": "Commerce and Labor",
"year": 2026,
"count": 7,
"number": "sb619",
"status": "failed committee",
"catch_line": "Electric utilities; certificate of operation for high-load facilities.",
"date_introduced": "January 14, 2026"
},
{
"id": 84909,
"name": "Commerce and Labor",
"year": 2026,
"count": 5,
"number": "sb249",
"status": "signed by governor",
"catch_line": "Electric utilities; definitions, integrated resource plans, report.",
"date_introduced": "January 12, 2026"
},
{
"id": 85496,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "sb497",
"status": "signed by governor",
"catch_line": "Transmission lines, certain; Department of Transportation to identify opportunities for siting.",
"date_introduced": "January 13, 2026"
},
{
"id": 83742,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb84",
"status": "signed by governor",
"catch_line": "Electric utilities and licensed suppliers of electricity; regional transmission entities.",
"date_introduced": "January 01, 2026"
},
{
"id": 85520,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "sb516",
"status": "signed by governor",
"catch_line": "Electric utilities; disconnection reports, State Corporation Commission database, annual summary.",
"date_introduced": "January 13, 2026"
}
],
"summary": "<b>Electric utilities; certificate of operation for high-load facilities.<\/b> Prohibits any person from operating a high-load facility, defined in the bill as a facility whose electricity demand exceeds 25 megawatts that was not operating before July 1, 2026, without first having obtained a certificate of operation from the State Corporation Commission. The bill includes factors for the Commission to consider in reviewing a petition to operate a high-load facility. The bill establishes a presumption that a high-load facility shall be considered to have met certain requirements if the high-load facility has secured sufficient contracts for energy storage resources or zero-carbon electric generating resources or that the high-load facility has a plan to implement sufficient demand reduction measures. The bill also requires the Commission to consider certain factors in a review of a petition for a certificate to operate a high-load facility, including whether there is sufficient energy, capacity, and grid infrastructure to support the operation of the high-load facility and whether the operation of the high-load facility would create an unreasonable cross-subsidy across customers served by the incumbent electric utility.",
"version": "HB155",
"copatron": null,
"committee": "Commerce and Labor",
"full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a> as follows:<\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins>56<\/ins><ins>-<\/ins><ins>580.<\/ins><ins>1. <\/ins><ins>Certificate of operation<\/ins><ins> required<\/ins><ins> for<\/ins><ins> new<\/ins><ins> high<\/ins><ins>-<\/ins><ins>load facilities<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high<\/ins><ins>-<\/ins><ins>load facility\" means any faci<\/ins><ins>lity, or a combination of facilities that in the Commission's discretion effectively operate together as one facility, with an electricity demand or contracted capacity<\/ins><ins> that exceeds 25 megawatts and that was not in operation prior to July 1, 2026.<\/ins><\/p>\n<p class=section><ins>B. No person shall operate a high<\/ins><ins>-<\/ins><ins>load facility without first having obtained a certificate of operation from the Commission. Any certificate required by this section shall be issued by the Commission only after co<\/ins><ins>mpliance with applicable notice and hearing requirements.<\/ins><\/p>\n<p class=section><ins>C. The Commission shall issue a certificate of operation for a high<\/ins><ins>-<\/ins><ins>load facility upon a finding that such facility and any associated facilities (i) will have no material adverse effect upon the rates paid by customers of any regulated public utility in the Commonwealth, taking into account any likely generation, transm<\/ins><ins>ission, or distribution needs attributable to the operation of the high<\/ins><ins>-<\/ins><ins>load facility; (ii) will have no material adverse effect upon reliability of electric service provided by any regulated public utility; (iii) will have no material adverse effect upon the incumbent electric utility's ability to comply with applicable energy and environmental laws and regulations, including any <\/ins><ins>obligation to retire electric generating units under subdivision B 3 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a>; (iv) would be consistent with the Commonwealth Clean Energy Policy under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1706.1\/'>45.2-1706.1<\/a>; and (v) is not otherwise contrary to the public interest.<\/ins><\/p>\n<p class=section><ins>D. In review of a petition for a certificate to operate a high<\/ins><ins>-<\/ins><ins>load facility, the Commission shall give consideration to the effect of the facility and any associated facilities on the environment and public health and shall establish such conditions as may be desirable or necessary to minimize adverse environmental and <\/ins><ins>public health impacts. In its review, the Commission shall consider (i) whether adequate notice has been provided to the incumbent electric utility serving the area where the high<\/ins><ins>-<\/ins><ins>load facility would be located; (ii) whether the applicant has provided adequate information to the public and interested stakeholders regarding the high<\/ins><ins>-<\/ins><ins>load facility's energy use<\/ins><ins> and<\/ins><ins> its impacts on the electric g<\/ins><ins>rid, the environment and public health, and natural resources; (iii) whether there is sufficient energy, capacity, and grid infrastructure to support the <\/ins><ins>operation of the high<\/ins><ins>-<\/ins><ins>load facility; (iv) the cumulative impacts on the environment, public health, and the reliability of the electric grid that may result from the permitting and operation of multiple high<\/ins><ins>-<\/ins><ins>load facilities in the same geographic area; (v) the high<\/ins><ins>-<\/ins><ins>load facility's contribution to economic development in the Commonwealth; and (vi) whether the permitting and operation of the high<\/ins><ins>-<\/ins><ins>load facility would create an unreasonable cro<\/ins><ins>ss-subsidy across customers served by the incumbent electric utility.<\/ins><\/p>\n<p class=section><ins>E. The operation of a high<\/ins><ins>-<\/ins><ins>load facility shall be presumed to have no material adverse effect upon the incumbent electric utility's ability to comply with applicable energy and environmental laws and regulations, including any obligation to retire electric generating units under subdivision B 3 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a><\/ins><ins>, to be consistent with the Commonwealth Clean Energy Policy under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1706.1\/'>45.2-1706.1<\/a>, and to be not otherwise contrary to the public interest, if the high<\/ins><ins>-<\/ins><ins>load facility demonstrates to the satisfaction of the Commission that the high<\/ins><ins>-<\/ins><ins>load facility has secured contracts with<\/ins><ins> energy storage resources or<\/ins><ins> zero-carbon electric gene<\/ins><ins>rating resources or taken other actions that are reasonably designed to offset its contribution to the incumbent electric utility's system peak demand. A high<\/ins><ins>-<\/ins><ins>load facility may re<\/ins><ins>ceive such presumption by demonstrating, to the satisfaction of the Commission<\/ins><ins>,<\/ins><ins> that <\/ins><ins>(i) <\/ins><ins>the high<\/ins><ins>-<\/ins><ins>load facility has secured sufficient contracts with energy storage facilities or zero-carbon electric generating resources within the service territory of the regional transmission entity or (ii) the high<\/ins><ins>-<\/ins><ins>load facility ha<\/ins><ins>s a plan to implement sufficient energy efficiency, demand response, load shedding, or load reassignment measures.<\/ins><\/p>\n<p class=section><ins>F. To the extent that the requirements of this section conflict with any other provision of law, including an electric utility's obligation to provide service under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-234\/'>56-234<\/a>, the provisions of this secti<\/ins><ins>on shall control.<\/ins><\/p>\n<p class=enactcls>2. That the State Corporation Commission may issue rules and guidance as necessary to implement the provisions of this act.<\/p>",
"catch_line": "Electric utilities; certificate of operation for high-load facilities.",
"duplicates": null,
"session_id": 32,
"word_count": 996,
"patron_party": "D",
"patron_place": "Gainesville",
"summary_hash": "dd651a596f05afd7bd603a1dd01d3cb3",
"patron_prefix": "Del.",
"patron_suffix": "(D-Gainesville)",
"status_detail": "failed committee",
"_rsun_versions": [
{
"id": "701f5c0043025946c8ab9dfe383706de61dd69862cdcd20e5c6b9a84abed225d",
"code": "HB155",
"bill_id": 83822,
"source_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb155.pdf",
"source_date": "2026-01-06",
"source_hash": "5154fd232917cc38725479fa35ff8bfd706cb8bf7a38de2a7fc6f23a2b90b897",
"source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580.1\/'>56-580.1<\/a> as follows:<\/p>\n<p class=catchln><ins>\u00a7 <\/ins><ins>56<\/ins><ins>-<\/ins><ins>580.<\/ins><ins>1. <\/ins><ins>Certificate of operation<\/ins><ins> required<\/ins><ins> for<\/ins><ins> new<\/ins><ins> high<\/ins><ins>-<\/ins><ins>load facilities<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. As used in this section, \"high<\/ins><ins>-<\/ins><ins>load facility\" means any faci<\/ins><ins>lity, or a combination of facilities that in the Commission's discretion effectively operate together as one facility, with an electricity demand or contracted capacity<\/ins><ins> that exceeds 25 megawatts and that was not in operation prior to July 1, 2026.<\/ins><\/p>\n<p class=section><ins>B. No person shall operate a high<\/ins><ins>-<\/ins><ins>load facility without first having obtained a certificate of operation from the Commission. Any certificate required by this section shall be issued by the Commission only after co<\/ins><ins>mpliance with applicable notice and hearing requirements.<\/ins><\/p>\n<p class=section><ins>C. The Commission shall issue a certificate of operation for a high<\/ins><ins>-<\/ins><ins>load facility upon a finding that such facility and any associated facilities (i) will have no material adverse effect upon the rates paid by customers of any regulated public utility in the Commonwealth, taking into account any likely generation, transm<\/ins><ins>ission, or distribution needs attributable to the operation of the high<\/ins><ins>-<\/ins><ins>load facility; (ii) will have no material adverse effect upon reliability of electric service provided by any regulated public utility; (iii) will have no material adverse effect upon the incumbent electric utility's ability to comply with applicable energy and environmental laws and regulations, including any <\/ins><ins>obligation to retire electric generating units under subdivision B 3 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a>; (iv) would be consistent with the Commonwealth Clean Energy Policy under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1706.1\/'>45.2-1706.1<\/a>; and (v) is not otherwise contrary to the public interest.<\/ins><\/p>\n<p class=section><ins>D. In review of a petition for a certificate to operate a high<\/ins><ins>-<\/ins><ins>load facility, the Commission shall give consideration to the effect of the facility and any associated facilities on the environment and public health and shall establish such conditions as may be desirable or necessary to minimize adverse environmental and <\/ins><ins>public health impacts. In its review, the Commission shall consider (i) whether adequate notice has been provided to the incumbent electric utility serving the area where the high<\/ins><ins>-<\/ins><ins>load facility would be located; (ii) whether the applicant has provided adequate information to the public and interested stakeholders regarding the high<\/ins><ins>-<\/ins><ins>load facility's energy use<\/ins><ins> and<\/ins><ins> its impacts on the electric g<\/ins><ins>rid, the environment and public health, and natural resources; (iii) whether there is sufficient energy, capacity, and grid infrastructure to support the <\/ins><ins>operation of the high<\/ins><ins>-<\/ins><ins>load facility; (iv) the cumulative impacts on the environment, public health, and the reliability of the electric grid that may result from the permitting and operation of multiple high<\/ins><ins>-<\/ins><ins>load facilities in the same geographic area; (v) the high<\/ins><ins>-<\/ins><ins>load facility's contribution to economic development in the Commonwealth; and (vi) whether the permitting and operation of the high<\/ins><ins>-<\/ins><ins>load facility would create an unreasonable cro<\/ins><ins>ss-subsidy across customers served by the incumbent electric utility.<\/ins><\/p>\n<p class=section><ins>E. The operation of a high<\/ins><ins>-<\/ins><ins>load facility shall be presumed to have no material adverse effect upon the incumbent electric utility's ability to comply with applicable energy and environmental laws and regulations, including any obligation to retire electric generating units under subdivision B 3 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a><\/ins><ins>, to be consistent with the Commonwealth Clean Energy Policy under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1706.1\/'>45.2-1706.1<\/a>, and to be not otherwise contrary to the public interest, if the high<\/ins><ins>-<\/ins><ins>load facility demonstrates to the satisfaction of the Commission that the high<\/ins><ins>-<\/ins><ins>load facility has secured contracts with<\/ins><ins> energy storage resources or<\/ins><ins> zero-carbon electric gene<\/ins><ins>rating resources or taken other actions that are reasonably designed to offset its contribution to the incumbent electric utility's system peak demand. A high<\/ins><ins>-<\/ins><ins>load facility may re<\/ins><ins>ceive such presumption by demonstrating, to the satisfaction of the Commission<\/ins><ins>,<\/ins><ins> that <\/ins><ins>(i) <\/ins><ins>the high<\/ins><ins>-<\/ins><ins>load facility has secured sufficient contracts with energy storage facilities or zero-carbon electric generating resources within the service territory of the regional transmission entity or (ii) the high<\/ins><ins>-<\/ins><ins>load facility ha<\/ins><ins>s a plan to implement sufficient energy efficiency, demand response, load shedding, or load reassignment measures.<\/ins><\/p>\n<p class=section><ins>F. To the extent that the requirements of this section conflict with any other provision of law, including an electric utility's obligation to provide service under \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-234\/'>56-234<\/a>, the provisions of this secti<\/ins><ins>on shall control.<\/ins><\/p>\n<p class=enactcls>2. That the State Corporation Commission may issue rules and guidance as necessary to implement the provisions of this act.<\/p>",
"source_metadata": {
"bodyAssociation": "archive-reported-current-version",
"archiveReference": {
"date": "2026-01-06",
"number": "HB155",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb155.pdf"
}
}
}
],
"copatron_count": 0,
"patron_address": [
"P.O. Box 922",
"Gainesville",
"VA 20156"
],
"patron_chamber": "house",
"patron_started": 2024,
"session_lis_id": 261,
"status_history": [
{
"date": "02\/18\/2026",
"status": "Left in Labor and Commerce",
"date_raw": "2026-02-18",
"vote_count": null,
"lis_vote_id": null,
"translation": "failed committee"
},
{
"date": "02\/18\/2026",
"status": "Left in Committee Education",
"date_raw": "2026-02-18",
"vote_count": null,
"lis_vote_id": null,
"translation": "failed committee"
},
{
"date": "02\/10\/2026",
"status": "Subcommittee recommends laying on the table (9-Y 0-N)",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": "296107",
"translation": "failed subcommittee"
},
{
"date": "02\/10\/2026",
"status": "Subcommittee recommends laying on the table",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": null,
"translation": "failed subcommittee"
},
{
"date": "02\/10\/2026",
"status": "House subcommittee offered",
"date_raw": "2026-02-10",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/30\/2026",
"status": "Fiscal Impact Statement from State Corporation Commission (HB155)",
"date_raw": "2026-01-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/15\/2026",
"status": "Assigned HCL sub: Subcommittee #3",
"date_raw": "2026-01-15",
"vote_count": null,
"lis_vote_id": null,
"translation": "in subcommittee"
},
{
"date": "01\/06\/2026",
"status": "Referred to Committee on Labor and Commerce",
"date_raw": "2026-01-06",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "01\/06\/2026",
"status": "Prefiled and ordered printed; Offered 01-14-2026 26102983D",
"date_raw": "2026-01-06",
"vote_count": null,
"lis_vote_id": null,
"translation": "introduced"
}
],
"chief_patron_id": 524,
"date_introduced": "2026-01-06",
"patron_district": 21,
"patron_shortname": "jethomas",
"committee_chamber": "house",
"status_detail_date": "02\/18\/2026",
"committee_shortname": "commerce",
"patron_name_formatted": "Del. Josh Thomas (D-Gainesville)"
}