<b>State Corporation Commission; electric utility infrastructure; report.</b> Directs the Department of Energy (the Department) and the State Corporation Commission (the Commission) to conduct a comprehensive analysis of existing electric utility infrastructure to identify cost-saving opportunities that improve or preserve electric system reliability as an alternative or supplement to greenfield infrastructure projects. The bill requires the Department and the Commission to complete their analysis and submit a report to the General Assembly no later than July 1, 2027.
Raw source record
{
"id": 83773,
"url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb114\/",
"tags": {
"141871": "energy",
"141872": "infrastructure",
"141873": "utility",
"141874": "regulation",
"141875": "report"
},
"text": [
{
"date": "2026-01-02",
"number": "HB114",
"pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb114.pdf"
},
{
"date": "2026-01-27",
"number": "HB114H1"
},
{
"date": "2026-02-24",
"number": "HB114S1"
}
],
"type": "bill",
"year": 2026,
"video": null,
"number": "hb114",
"patron": "Ware, Lee",
"status": "failed committee",
"chamber": "house",
"changes": null,
"outcome": "failed",
"related": [
{
"id": 84927,
"name": "Finance",
"year": 2026,
"count": 4,
"number": "sb267",
"status": "signed by governor",
"catch_line": "Electric utility infrastructure; Dept. of Energy & SCC to conduct comprehensive analysis, report.",
"date_introduced": "January 12, 2026"
},
{
"id": 85128,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb1225",
"status": "signed by governor",
"catch_line": "Transportation electrification; integrated resource planning, fast-charging stations, etc.",
"date_introduced": "January 14, 2026"
},
{
"id": 84909,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "sb249",
"status": "signed by governor",
"catch_line": "Electric utilities; definitions, integrated resource plans, report.",
"date_introduced": "January 12, 2026"
},
{
"id": 84603,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "hb766",
"status": "failed committee",
"catch_line": "Electrical generating facilities; capacity factor, report.",
"date_introduced": "January 13, 2026"
},
{
"id": 86089,
"name": "Commerce and Labor",
"year": 2026,
"count": 4,
"number": "sb827",
"status": "signed by governor",
"catch_line": "Underground transmission lines; pilot program, clarifies qualifying projects, report.",
"date_introduced": "January 23, 2026"
}
],
"summary": "<b>State Corporation Commission; electric utility infrastructure; report.<\/b> Directs the Department of Energy (the Department) and the State Corporation Commission (the Commission) to conduct a comprehensive analysis of existing electric utility infrastructure to identify cost-saving opportunities that improve or preserve electric system reliability as an alternative or supplement to greenfield infrastructure projects. The bill requires the Department and the Commission to complete their analysis and submit a report to the General Assembly no later than July 1, 2027.",
"version": "HB114S1",
"copatron": [
{
"shortname": "rcsullivan",
"partisanship": 20,
"name_formatted": "Del. Rip Sullivan (D-Arlington)"
}
],
"committee": "Finance",
"full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The<\/ins><ins> Department of Energy (the Department), in consultation with the<\/ins><ins> State Corporation Commission<\/ins><ins> (<\/ins><ins>the <\/ins><ins>Commission)<\/ins><ins> and each Phase I and Phase II Utility, as those terms are defined in subdivision A 1 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-5\/'>56-5<\/a><\/ins><ins>85.1<\/ins><ins>,<\/ins><ins> shall conduct a comprehensive analysis of existing electric utility infrastructure to identify cost-saving opportunities that improve or preserve electric system reliability as an alternative or supplement to greenfield infrastructure projects. Such analysis shall include<\/ins><ins> capacity up<\/ins><ins>ra<\/ins><ins>t<\/ins><ins>es for zero-carbon electric gene<\/ins><ins>rating resources and energy storage resources<\/ins><ins> <\/ins><ins>and transmission upgrades<\/ins><ins>,<\/ins><ins> including <\/ins><ins>grid enhancing technologies and high-performance conductors. The<\/ins><ins> Department and the <\/ins><ins>Commission<\/ins><ins> shall also analyze whether there are or could be any potential voluntary regulatory pathways by which large load customers could directly finance such alternatives as a condition of accelerated interconnection. The <\/ins><ins>Department and the <\/ins><ins>Commission<\/ins><ins> shall <\/ins><ins>complete <\/ins><ins>their<\/ins><ins> analys<\/ins><ins>e<\/ins><ins>s and <\/ins><ins>submit <\/ins><ins>a<\/ins><ins> report to the General Assembly no later than <\/ins><ins>December<\/ins><ins> 1<\/ins><ins>,<\/ins><ins> 202<\/ins><ins>6<\/ins><ins>.<\/ins><ins> Notwithstanding any <\/ins><ins>provision of subsection C of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia, any additional generating capacity <\/ins><ins>achieved<\/ins><ins> through uprates at any existing <\/ins><ins>falling<\/ins><ins> water resources shall be <\/ins><ins>considered<\/ins><ins> <\/ins><ins>a renewable energy standard eligible source <\/ins><ins>for the purposes of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 2. To the extent that the Department of Energy determines that it requires outside independent consultants to assist in its evaluation required under this act, the Department shall conduct an open request for proposals for such independent consultin<\/ins><ins>g<\/ins><ins> services. Upon the conclusion of such request for proposals, the Department shall publish the results and solicit voluntary funding from private <\/ins><ins>entities<\/ins><ins> to finance the independent consultin<\/ins><ins>g<\/ins><ins>. If the Department receives sufficient voluntary financial contributions, it shall engage the necessary independent consultin<\/ins><ins>g<\/ins><ins> services and conduct all analyses required under this act. The Department shall not conduct any such analyses unless it receives such sufficient voluntary financial contributions.<\/ins><\/p>",
"catch_line": "Electric utility infrastructure; Dept. of Energy and SCC to conduct an analysis, report.",
"duplicates": [
{
"year": 2027,
"number": "hb114",
"patron": "Ware, Lee",
"status": "in committee",
"chamber": "house",
"catch_line": "Electric utility infrastructure; Dept. of Energy and SCC to conduct an analysis, report.",
"date_introduced": "2026-01-02"
}
],
"session_id": 32,
"word_count": 481,
"patron_party": "R",
"patron_place": "Powhatan",
"summary_hash": "6e0c16d28c0baa89bc7d2518c3560134",
"patron_prefix": "Del.",
"patron_suffix": "(R-Powhatan)",
"status_detail": "failed committee",
"_rsun_versions": [
{
"id": "3c5e32d8ecdc3e40fc97c35c34d0463eee8f2dbe5aed6ddb4144ba10983ec072",
"code": "HB114S1",
"bill_id": 83773,
"source_url": null,
"source_date": "2026-02-24",
"source_hash": "0af776ab3dca5b94303b78fcd00de6bb376347f8e57f1b69fdb12f20cdf0d8d5",
"source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=textbl><strong>1. <\/strong><ins>\u00a7 1. <\/ins><ins>The<\/ins><ins> Department of Energy (the Department), in consultation with the<\/ins><ins> State Corporation Commission<\/ins><ins> (<\/ins><ins>the <\/ins><ins>Commission)<\/ins><ins> and each Phase I and Phase II Utility, as those terms are defined in subdivision A 1 of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-5\/'>56-5<\/a><\/ins><ins>85.1<\/ins><ins>,<\/ins><ins> shall conduct a comprehensive analysis of existing electric utility infrastructure to identify cost-saving opportunities that improve or preserve electric system reliability as an alternative or supplement to greenfield infrastructure projects. Such analysis shall include<\/ins><ins> capacity up<\/ins><ins>ra<\/ins><ins>t<\/ins><ins>es for zero-carbon electric gene<\/ins><ins>rating resources and energy storage resources<\/ins><ins> <\/ins><ins>and transmission upgrades<\/ins><ins>,<\/ins><ins> including <\/ins><ins>grid enhancing technologies and high-performance conductors. The<\/ins><ins> Department and the <\/ins><ins>Commission<\/ins><ins> shall also analyze whether there are or could be any potential voluntary regulatory pathways by which large load customers could directly finance such alternatives as a condition of accelerated interconnection. The <\/ins><ins>Department and the <\/ins><ins>Commission<\/ins><ins> shall <\/ins><ins>complete <\/ins><ins>their<\/ins><ins> analys<\/ins><ins>e<\/ins><ins>s and <\/ins><ins>submit <\/ins><ins>a<\/ins><ins> report to the General Assembly no later than <\/ins><ins>December<\/ins><ins> 1<\/ins><ins>,<\/ins><ins> 202<\/ins><ins>6<\/ins><ins>.<\/ins><ins> Notwithstanding any <\/ins><ins>provision of subsection C of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia, any additional generating capacity <\/ins><ins>achieved<\/ins><ins> through uprates at any existing <\/ins><ins>falling<\/ins><ins> water resources shall be <\/ins><ins>considered<\/ins><ins> <\/ins><ins>a renewable energy standard eligible source <\/ins><ins>for the purposes of \u00a7 <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia.<\/ins><\/p>\n<p class=section><ins>\u00a7 2. To the extent that the Department of Energy determines that it requires outside independent consultants to assist in its evaluation required under this act, the Department shall conduct an open request for proposals for such independent consultin<\/ins><ins>g<\/ins><ins> services. Upon the conclusion of such request for proposals, the Department shall publish the results and solicit voluntary funding from private <\/ins><ins>entities<\/ins><ins> to finance the independent consultin<\/ins><ins>g<\/ins><ins>. If the Department receives sufficient voluntary financial contributions, it shall engage the necessary independent consultin<\/ins><ins>g<\/ins><ins> services and conduct all analyses required under this act. The Department shall not conduct any such analyses unless it receives such sufficient voluntary financial contributions.<\/ins><\/p>",
"source_metadata": {
"bodyAssociation": "archive-reported-current-version",
"archiveReference": {
"date": "2026-02-24",
"number": "HB114S1"
}
}
}
],
"copatron_count": 1,
"patron_address": [
"P.O. Box 689",
"Powhatan",
"VA 23139"
],
"patron_chamber": "house",
"patron_started": 1998,
"session_lis_id": 261,
"status_history": [
{
"date": "03\/06\/2026",
"status": "Continued to 2027 in Finance and Appropriations (14-Y 0-N)",
"date_raw": "2026-03-06",
"vote_count": null,
"lis_vote_id": "300925",
"translation": "failed committee"
},
{
"date": "03\/06\/2026",
"status": "Continued to 2027 in Finance and Appropriations",
"date_raw": "2026-03-06",
"vote_count": null,
"lis_vote_id": "300925",
"translation": "failed committee"
},
{
"date": "02\/25\/2026",
"status": "Fiscal Impact Statement from Department of Planning and Budget (HB114)",
"date_raw": "2026-02-25",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/24\/2026",
"status": "Committee substitute printed 26108325D-S1",
"date_raw": "2026-02-24",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/23\/2026",
"status": "Reported from Commerce and Labor with substitute and rereferred to Finance and Appropriations (15-Y 0-N)",
"date_raw": "2026-02-23",
"vote_count": null,
"lis_vote_id": "298554",
"translation": "passed committee"
},
{
"date": "02\/03\/2026",
"status": "Referred to Committee on Commerce and Labor",
"date_raw": "2026-02-03",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "02\/03\/2026",
"status": "Constitutional reading dispensed (on 1st reading)",
"date_raw": "2026-02-03",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "02\/02\/2026",
"status": "Read third time and passed House Block Vote (99-Y 0-N 0-A)",
"date_raw": "2026-02-02",
"vote_count": null,
"lis_vote_id": "293691",
"translation": "passed house"
},
{
"date": "01\/30\/2026",
"status": "Engrossed by House - committee substitute",
"date_raw": "2026-01-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/30\/2026",
"status": "committee substitute agreed to",
"date_raw": "2026-01-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/30\/2026",
"status": "Read second time",
"date_raw": "2026-01-30",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/29\/2026",
"status": "Read first time",
"date_raw": "2026-01-29",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/27\/2026",
"status": "Committee substitute printed 26106016D-H1",
"date_raw": "2026-01-27",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/27\/2026",
"status": "Reported from Labor and Commerce with substitute (22-Y 0-N)",
"date_raw": "2026-01-27",
"vote_count": null,
"lis_vote_id": "292506",
"translation": "passed committee"
},
{
"date": "01\/27\/2026",
"status": "Reported from Labor and Commerce with substitute",
"date_raw": "2026-01-27",
"vote_count": null,
"lis_vote_id": null,
"translation": "passed committee"
},
{
"date": "01\/22\/2026",
"status": "Subcommittee recommends reporting with substitute (10-Y 0-N)",
"date_raw": "2026-01-22",
"vote_count": null,
"lis_vote_id": "291979",
"translation": "passed subcommittee"
},
{
"date": "01\/22\/2026",
"status": "Subcommittee recommends reporting with substitute",
"date_raw": "2026-01-22",
"vote_count": null,
"lis_vote_id": null,
"translation": "passed subcommittee"
},
{
"date": "01\/22\/2026",
"status": "House subcommittee offered",
"date_raw": "2026-01-22",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/15\/2026",
"status": "Assigned HCL sub: Subcommittee #3",
"date_raw": "2026-01-15",
"vote_count": null,
"lis_vote_id": null,
"translation": "in subcommittee"
},
{
"date": "01\/02\/2026",
"status": "Referred to Committee on Labor and Commerce",
"date_raw": "2026-01-02",
"vote_count": null,
"lis_vote_id": null,
"translation": "in committee"
},
{
"date": "01\/02\/2026",
"status": "Committee Referral Pending",
"date_raw": "2026-01-02",
"vote_count": null,
"lis_vote_id": null,
"translation": null
},
{
"date": "01\/02\/2026",
"status": "Prefiled and ordered printed; Offered 01-14-2026 26103432D",
"date_raw": "2026-01-02",
"vote_count": null,
"lis_vote_id": null,
"translation": "introduced"
}
],
"chief_patron_id": 97,
"date_introduced": "2026-01-02",
"patron_district": 72,
"patron_shortname": "rlware",
"committee_chamber": "senate",
"status_detail_date": "03\/06\/2026",
"committee_shortname": "finance",
"patron_name_formatted": "Del. Lee Ware (R-Powhatan)"
}