HB1133: Virginia Solar Energy and Battery Energy Storage Systems Program; established.

failed committee

<b>Department of Energy; Virginia Solar Energy and Battery Energy Storage Systems Program and tax credit; solar energy and battery energy storage projects.</b> Establishes the Virginia Solar Energy and Battery Energy Storage Systems Program, to be administered by the Department of Energy for the purpose of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by other public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the tax credit established by the bill; and (iii) determining which items and services are considered eligible project costs for a given qualified project, as defined in the bill. The bill establishes requirements for what can be considered a qualified solar energy and battery energy storage project based on whether the use of such project is for a residential, commercial and industrial, or utility-scale project. The bill establishes a tax credit for the installation of such residential, commercial and industrial, or utility-scale solar energy and energy storage projects for taxable years beginning on and after January 1, 2027, but before January 1, 2032. Finally, the bill requires the Department to monitor allocation of the tax credit and publish quarterly transparency reports summarizing such information and to establish and maintain a public dashboard displaying certain information on the solar energy and short duration battery energy storage installations by January 1, 2027. The bill has a delayed effective date of January 1, 2027.

Official bill page · Source: Richmond Sunlight

Ask about HB1133

Full bill text

Version HB1133 · 2026-01-14 · Official source text

Full text

Changes in this version: added text deleted text

Be it enacted by the General Assembly of Virginia:

1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered 45.2-1918 through 45.2-1922, and by adding in Article 13 of Chapter 3 of Title 58.1 a section numbered 58.1-439.12:13 as follows:

Article 4.

Virginia Solar Energy and Battery Energy Storage Systems Program.

§ 45.2-1918. Definitions.

As used in this article, unless the context requires a different meaning:

"Qualified commercial and industrial project" means a new solar energy and short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1921; (ii) that began construction on or after July 1, 2026; and (iii) used for commercial or industrial use as determined by the customer rate class used to determine billing related to such project.

"Qualified project" means a qualified commercial and industrial project, qualified residential project, or a qualified utility-scale project.

"Qualified residential project" means a new solar energy and short duration battery energy storage project or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1920; (ii) in service on or after July 1, 2026; and (iii) used for residential purposes as determined by the customer rate class used to determine billing related to such project.

"Qualified utility-scale project" means a short duration battery energy storage project added to an existing solar facility or a new standalone short duration battery energy storage project (i) approved by the Department pursuant to § 45.2-1921; (ii) that began construction on or after July 1, 2026; and (iii) used for utility-scale use as determined by the customer rate class used to determine billing related to such project.

"Short duration battery energy storage project" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored.

"Solar energy project" means the installation of a system of components designed to convert solar radiation into useable thermal or electrical energy.

§ 45.2-1919. Virginia Solar Energy and Battery Energy Storage Systems Program.

The Virginia Solar Energy and Battery Energy Storage Systems Program is hereby established and shall be administered by the Department for the purposes of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by other public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the tax credit in § 58.1-439.12:13; and (iii) determining which items and services are considered eligible project costs for a given qualified project. The Department may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the Department deems appropriate.

§ 45.2-1920. Qualified residential project requirements.

A. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified residential projects for the purposes of the tax credit in § 58.1-439.12:13. To receive approval as a qualified residential project, the following conditions shall be met:

1. The project shall be fully operational and installed in the Commonwealth by the time specified in subdivision 4;

2. The project meets the qualifications of one of the provisions of the federal Inflation Reduction Act (P.L. 117-169) as of June 30, 2025, that would have qualified for federal tax credits or other federal incentives;

3. The project is in service on or after July 1, 2026, but prior to the expiration of the tax credit in § 58.1-439.12:13, and construction is certified to be completed within five years of the date on which construction began; and

4. The energy storage portion of the project provides a minimum storage duration of up to two hours.

B. No solar energy and short duration battery energy storage project shall receive a tax credit pursuant to § 58.1-439.12:13 without approval by the Department pursuant to this section.

§ 45.2-1921. Qualified commercial, industrial, and utility-scale project requirements.

A. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified commercial and industrial projects for the purposes of the tax credit in § 58.1-439.12:13. To receive approval as a qualified commercial and industrial project, the following conditions shall be met:

1. The project shall be fully operational and have begun construction in the Commonwealth by the time specified in subdivision 3;

2. The project meets the qualifications of one of the provisions of the federal Inflation Reduction Act (P.L. 117-169) as of June 30, 2025, that would have qualified for federal tax credits or other federal incentives;

3. The project has begun construction on or after July 1, 2026, but prior to the expiration of the tax credit in § 58.1-439.12:13, and construction is certified to be completed within five years of the date on which construction began; and

4. The energy storage portion of the project provides a minimum storage duration of up to four hours.

The Department shall also evaluate and approve such qualified commercial and industrial projects pursuant to this subsection based upon the applicant's willingness to opt-in for the State Corporation Commission's virtual power plant pilot program established in § 56-585.1:16.

B. The Department shall evaluate and approve solar energy and short duration battery energy storage projects as qualified utility-scale projects for the purposes of the tax credit in § 58.1-439.12:13. To receive approval as a qualified utility-scale project, the conditions listed in subdivisions A 1 through 4 shall be met. The Department shall evaluate and approve such utility-scale project pursuant to this subsection based upon the applicant's ability to reduce electric utility costs for ratepayers.

C. No solar energy and short duration battery energy storage project shall receive a tax credit pursuant to § 58.1-439.12:13 without approval by the Department pursuant to this section.

§ 45.2-1922. Regional uptake dashboard for approved solar energy and short duration battery energy storage projects; reports.

A. The Department shall monitor allocation of the tax credit in § 58.1-439.12:13 and publish quarterly transparency reports summarizing such allocation.

B. The Department shall maintain a public dashboard displaying regional uptake, demographic distribution such as low to moderate income and non-low to moderate income data, and sectoral progress toward allocated targets.

§ 58.1-439.12:13. Tax credit for investments in solar energy equipment and short duration battery energy storage.

A. For purposes of this section:

"Eligible project costs" means (i) for residential projects, costs incurred for the construction, installation, purchase, or lease of qualifying solar energy equipment or qualifying energy storage resources, including labor costs incurred for installation and electrical integration, and costs incurred for permitting, inspection, engineering, and system design services necessary for such project; (ii) for commercial and industrial projects, costs incurred for such project that would otherwise be eligible for residential projects, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection application fees, project-specific legal and financial services, site preparation, purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switchgear, and transformer installation necessary for grid compliance; and (iii) for utility-scale projects, costs incurred for such project that would otherwise be eligible for commercial and industrial projects, and high-voltage interconnection and substation construction, transmission-level engineering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. "Eligible project costs" includes only costs directly associated with energy generation, storage, and grid integration. "Eligible projects costs" does not include land acquisition unrelated to system operation, or where the project is not completed, general property improvements, renovations, or unrelated construction; transmission upgrades not directly attributable to project interconnection; costs associated with speculative land banking or site prospecting without approved interconnection plans; legal fees, lobbying, or administrative costs unrelated to project execution; backup generators, fossil fuel systems, or hybrid diesel-photovoltaic integrations; energy efficiency upgrades such as insulation or lighting; heating, ventilation, and air conditioning (HVAC) unless integrated with a solar and storage project and separately itemized; or any leased residential systems.

"Qualified commercial and industrial project", "qualified project", and "qualified residential project" mean the same as those terms are defined in § 45.2-1918.

B. For taxable years beginning on and after January 1, 2027, but before January 1, 2032, a taxpayer shall be allowed a one-time, refundable, installment credit, in the manner provided in subsection C, against the tax levied pursuant to § 58.1-320 or 58.1-400 in an amount equal to:

1. For a residential qualified project, 35 percent of eligible project costs, not to exceed $6,000.

2. For a commercial and industrial qualified project, 35 percent of eligible project costs, not to exceed $2.5 million per project.

3. For a utility-scale qualified project, 35 percent of eligible project costs, not to exceed $5 million per project.

The taxpayer shall submit purchase receipts with the income tax return satisfactory to the Tax Commissioner.

C. One hundred percent of the tax credit shall be earned in the year the project is placed in service and shall be claimed over a five-year period in installments of 20 percent per year. If the amount of the credit allowed in any given year exceeds the taxpayer's liability for the taxable year, the amount that exceeds the tax liability shall be refunded by the Tax Commissioner on behalf of the Commonwealth for 100 percent of face value within 90 days after the filing date of the income tax return on which the individual applies for the refund. However, no credit may be claimed for a taxable year during or after which the taxpayer disposes of, takes out of service, or moves outside of the Commonwealth any qualifying solar energy equipment. In such instance, any remaining, unpaid installments of the credit allowed to such taxpayer for such given project shall expire and become non-claimable for such project.

D. The aggregate amount of credits allowed under this section shall not exceed $50 million per applicable budget cycle. Of this amount, $12.5 million shall be reserved for residential qualifying projects, and the remaining $37.5 million for commercial and industrial and utility-scale qualifying projects, or an amount appropriated by the General Assembly during the applicable budget cycle, with 25 percent allocated for qualified residential projects and 75 percent allocated for  qualified commercial and industrial projects. Credits shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department of Energy and the Department. If, after nine months from the start of the taxable year, the Department of Energy determines that the amounts reserved for a given qualified project are unlikely to be fully allocated, the Department of Energy may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the aggregate annual credit cap. Credits shall be allocated by the Department on a first-come, first-served basis.

E. The amount of any credit attributable under this section to a partnership, limited liability company, or electing small business corporation (S corporation) shall be allocated to the individual partners, members, or shareholders, in proportion to their ownership or interest in such entity.

F. To qualify for the tax credit under this section, a project shall be installed in compliance with Article 4 (§ 45.2-1918 et seq.) of Chapter 19 of Title 45.2.

1. Once the taxpayer has satisfied all the requirements to the satisfaction of the Department of Energy, the Department of Energy shall provide the taxpayer with a certificate of approval for a qualified project, identifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include the amount of eligible costs incurred and the fiscal year in which such costs were incurred for which the taxpayer may claim a tax credit pursuant to this section. The Department of Energy shall send a copy of such certificate to the Tax Commissioner in a reasonable time and manner as determined by the Commissioner.

2. The taxpayer shall retain all proof of cost documentation, including invoices and scope of work, and any certificate of approval for a qualified project received pursuant to subdivision 1 for at least five years from the receipt of such certificate.

G. The Tax Commissioner shall develop guidelines, in consultation with the Department of Energy, for claiming the credit provided by this section, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section. Such guidelines shall be exempt from the provisions of the Administrative Process Act (§ 2.2-4000 et seq.).

2. That the provisions of this act shall become effective on January 1, 2027.

Legislative actions

2026-02-09 · history

Subcommittee recommends continuing to 2027 (Voice Vote)

2026-01-14 · history

Prefiled and ordered printed; Offered 01-14-2026 26105280D

2026-01-14 · history

Committee Referral Pending

2026-02-05 · history

Assigned HFIN sub: Subcommittee #1

2026-02-11 · history

Continued to 2027 in Finance (Voice Vote)

2026-01-14 · history

Referred to Committee on Finance

2026-02-08 · history

Fiscal Impact Statement from Department of Planning and Budget (HB1133)

Raw source record
{
    "id": 85034,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb1133\/",
    "tags": {
        "149103": "energy",
        "149104": "solar",
        "149105": "battery",
        "149106": "tax credit",
        "149107": "renewable energy",
        "149108": "transparency"
    },
    "text": [
        {
            "date": "2026-01-14",
            "number": "hb1133",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb1133.pdf"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "hb1133",
    "patron": "Reid, David",
    "status": "failed committee",
    "chamber": "house",
    "changes": null,
    "outcome": "failed",
    "related": [
        {
            "id": 86124,
            "name": "Appropriations",
            "year": 2026,
            "count": 3,
            "number": "sb834",
            "status": "failed committee",
            "catch_line": "Virginia Solar Energy and Battery Energy Storage Systems Grant Program; established.",
            "date_introduced": "January 27, 2026"
        },
        {
            "id": 84337,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 2,
            "number": "hb508",
            "status": "signed by governor",
            "catch_line": "Small renewable energy projects; agrivoltaics definition.",
            "date_introduced": "January 12, 2026"
        },
        {
            "id": 84396,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 2,
            "number": "hb565",
            "status": "failed committee",
            "catch_line": "Electric utilities; renewable portfolio standard program, zero-carbon electricity, etc.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84729,
            "name": "Local Government",
            "year": 2026,
            "count": 2,
            "number": "hb891",
            "status": "signed by governor",
            "catch_line": "Siting of battery energy storage projects; commercial solar photovoltaic generation facilities, etc.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 84909,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 2,
            "number": "sb249",
            "status": "signed by governor",
            "catch_line": "Electric utilities; definitions, integrated resource plans, report.",
            "date_introduced": "January 12, 2026"
        }
    ],
    "summary": "<b>Department of Energy; Virginia Solar Energy and Battery Energy Storage Systems Program and tax credit; solar energy and battery energy storage projects.<\/b> Establishes the Virginia Solar Energy and Battery Energy Storage Systems Program, to be administered by the Department of Energy for the purpose of (i) coordinating and supporting the development of solar energy and short duration battery energy storage industries and projects by other public or private entities; (ii) evaluating and approving solar energy and short duration battery energy storage projects as qualified projects for the purposes of the tax credit established by the bill; and (iii) determining which items and services are considered eligible project costs for a given qualified project, as defined in the bill. The bill establishes requirements for what can be considered a qualified solar energy and battery energy storage project based on whether the use of such project is for a residential, commercial and industrial, or utility-scale project. The bill establishes a tax credit for the installation of such residential, commercial and industrial, or utility-scale solar energy and energy storage projects for taxable years beginning on and after January 1, 2027, but before January 1, 2032. Finally, the bill requires the Department to monitor allocation of the tax credit and publish quarterly transparency reports summarizing such information and to establish and maintain a public dashboard displaying certain information on the solar energy and short duration battery energy storage installations by January 1, 2027. The bill has a delayed effective date of January 1, 2027.",
    "version": "hb1133",
    "copatron": [
        {
            "shortname": "pmhernandez",
            "partisanship": 14,
            "name_formatted": "Del. Phil Hernandez (D-Norfolk)"
        }
    ],
    "committee": "Finance",
    "full_text": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> through <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>, and by adding in Article 13 of Chapter 3 of Title 58.1 a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> as follows:<\/p>\n<p class=textctr><ins>Article 4.<\/ins><\/p>\n<p class=textctr><ins>Virginia <\/ins><ins>Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy Storage Systems<\/ins><ins> Program<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a>. Definitions.<\/ins><\/p>\n<p class=section><ins>As used in this<\/ins><ins> article<\/ins><ins>, unless the context requires a different meaning:<\/ins><\/p>\n<p class=section><ins>\"Qualified commerci<\/ins><ins>al and industrial project\" means<\/ins><ins> a <\/ins><ins>new <\/ins><ins>solar energy and short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>1<\/ins><ins>; (ii) <\/ins><ins>that<\/ins><ins> began <\/ins><ins>construction<\/ins><ins> on or after July 1, 2026; and <\/ins><ins>(iii) <\/ins><ins>used for <\/ins><ins>commercial or industrial use as determined by the customer rate class used to determine billing related to<\/ins><ins> such project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified<\/ins><ins> project\" means a qualified commercial and indust<\/ins><ins>rial project, qualified residential project, or a qualified utility-scale project.<\/ins><\/p>\n<p class=section><ins>\"Qualified <\/ins><ins>residential <\/ins><ins>project\" means a <\/ins><ins>new <\/ins><ins>solar energy and <\/ins><ins>short duration <\/ins><ins>battery <\/ins><ins>energy storage project<\/ins><ins> or a <\/ins><ins>new <\/ins><ins>standalone<\/ins><ins> short duration battery energy storage project<\/ins><ins> (i)<\/ins><ins> approved by the <\/ins><ins>Department <\/ins><ins>pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; <\/ins><ins>(ii) <\/ins><ins>in service <\/ins><ins>on or after July 1, 2026<\/ins><ins>; and <\/ins><ins>(iii) <\/ins><ins>used for residential purposes<\/ins><ins> <\/ins><ins>as determined by the customer rate class used to determine billing related to <\/ins><ins>such<\/ins><ins> project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified utility-scale project\" <\/ins><ins>means a short duration battery energy storage project<\/ins><ins> added to an existing solar facility or a<\/ins><ins> new standalone short duration battery energy storage project<\/ins><ins> (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1921\/'>45.2-1921<\/a>; (ii) that began construction on or after July 1, 2026; and (iii) used for <\/ins><ins>utility-scale<\/ins><ins> use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Short duration battery energy storage project\" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored.<\/ins><\/p>\n<p class=section><ins>\"Solar energy project\" means<\/ins><ins> the installation of a system of components <\/ins><ins>designed to convert solar radiation into useable thermal or electrical energy<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1919\/'>45.2-1919<\/a>.<\/ins><ins> Virginia<\/ins><ins> <\/ins><ins>Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy <\/ins><ins>Storage<\/ins><ins> Systems<\/ins><ins> <\/ins><ins>Program<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>The Virginia Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy <\/ins><ins>Storage<\/ins><ins> Systems<\/ins><ins> <\/ins><ins>Program<\/ins><ins> is hereby <\/ins><ins>established and shall be administered by the Department <\/ins><ins>for the purposes of <\/ins><ins>(i) coordinating and supporting the development<\/ins><ins> <\/ins><ins>of<\/ins><ins> solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy <\/ins><ins>storage industries and projects<\/ins><ins> by other public or <\/ins><ins>private<\/ins><ins> entities<\/ins><ins>;<\/ins><ins> (ii) <\/ins><ins>evaluating and approving solar energy and <\/ins><ins>short duration battery<\/ins><ins> <\/ins><ins>energy storage projects as qualified projects for the purposes of<\/ins><ins> the tax credit in<\/ins><ins> \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>;<\/ins><ins> and (<\/ins><ins>iii<\/ins><ins>) determining<\/ins><ins> which<\/ins><ins> <\/ins><ins>items and services are considered<\/ins><ins> el<\/ins><ins>igible project costs for a given qualified project<\/ins><ins>. The <\/ins><ins>Department<\/ins><ins> may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the <\/ins><ins>Department<\/ins><ins> deems appropriate.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>. Qualified <\/ins><ins>residential <\/ins><ins>project requirements.<\/ins><\/p>\n<p class=section><ins>A. The <\/ins><ins>Department<\/ins><ins> shall evaluate and approve solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage projects as qualified<\/ins><ins> residential<\/ins><ins> projects for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>residential <\/ins><ins>project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project shall be fully operational and installed in the Commonwealth<\/ins><ins> by the time specified in subdivision 4<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>2<\/ins><ins>. The project <\/ins><ins>meets the qualifications of one of the provisions of the <\/ins><ins>federal Inflation Reduction Act (P.L. <a href='https:\/\/law.lis.virginia.gov\/vacode\/117-169\/'>117-169<\/a>)<\/ins><ins> as of June 30, <\/ins><ins>2025<\/ins><ins>,<\/ins><ins> that<\/ins><ins> would have qualified for federal tax credits or other federal incentives<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>3<\/ins><ins>. The project <\/ins><ins>is in service<\/ins><ins> on or after July 1, 2026<\/ins><ins>,<\/ins><ins> but<\/ins><ins> prior to the expiration of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>,<\/ins><ins> and construction is certified to be completed within five years of <\/ins><ins>the date on which construction began<\/ins><ins>; and<\/ins><\/p>\n<p class=section><ins>4<\/ins><ins>. The energy storage portion of the project provides a minimum storage duration of up to <\/ins><ins>two<\/ins><ins> hours.<\/ins><\/p>\n<p class=section><ins>B. No solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage project shall receive a tax credit pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> without approval by the <\/ins><ins>Department<\/ins><ins> pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>1<\/ins><ins>. <\/ins><ins>Qualified <\/ins><ins>commercial, industrial, and utility-scale project<\/ins><ins> requirements.<\/ins><\/p>\n<p class=section><ins>A.<\/ins><ins> The Department shall evaluate and approve solar energy and <\/ins><ins>short duration<\/ins><ins> battery <\/ins><ins>energy storage projects as qualified <\/ins><ins>commercial and industrial <\/ins><ins>projects for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>commercial and industrial<\/ins><ins> project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project shall be fully operational and<\/ins><ins> <\/ins><ins>have <\/ins><ins>beg<\/ins><ins>u<\/ins><ins>n construction<\/ins><ins> in the Commonwealth by the time specified in subdivision <\/ins><ins>3<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>2. <\/ins><ins>The project meets the qualifications of one of the provisions of the federal Inflation Reduction Act (P.L. <a href='https:\/\/law.lis.virginia.gov\/vacode\/117-169\/'>117-169<\/a>) as of June 30, 2025<\/ins><ins>,<\/ins><ins> that would have qualified for federal tax credits or other federal incentives<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>3. The project <\/ins><ins>has begun construction<\/ins><ins> on or after July 1, 2026<\/ins><ins>, <\/ins><ins>but prior to the expiration of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>,<\/ins><ins> and construction is certified to be completed within five years of<\/ins><ins> the date on which construction began<\/ins><ins>; and<\/ins><\/p>\n<p class=section><ins>4<\/ins><ins>. The energy storage portion of the project provides a minimum storage duration of up to four hours.<\/ins><\/p>\n<p class=section><ins>The Department shall <\/ins><ins>a<\/ins><ins>lso <\/ins><ins>evaluate and approve such <\/ins><ins>qualified <\/ins><ins>commercial and <\/ins><ins>industrial<\/ins><ins> <\/ins><ins>projects <\/ins><ins>pursuant to this subsection <\/ins><ins>based <\/ins><ins>upon the applicant's willingness to opt-in for the State Corporation Commission<\/ins><ins>'s<\/ins><ins> <\/ins><ins>v<\/ins><ins>irtual <\/ins><ins>p<\/ins><ins>ower<\/ins><ins> <\/ins><ins>p<\/ins><ins>lant<\/ins><ins> <\/ins><ins>p<\/ins><ins>ilot <\/ins><ins>p<\/ins><ins>rogram<\/ins><ins> established in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a><\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B. <\/ins><ins>The Department shall evaluate and approve solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage projects as qualified <\/ins><ins>utility-scale <\/ins><ins>project<\/ins><ins>s<\/ins><ins> for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>utility<\/ins><ins>-scale <\/ins><ins>project, the conditions <\/ins><ins>listed in su<\/ins><ins>bdivisions<\/ins><ins> A 1 through <\/ins><ins>4<\/ins><ins> <\/ins><ins>shall be me<\/ins><ins>t. <\/ins><ins>The Department shall evaluate and approve such utility<\/ins><ins>-<\/ins><ins>scale project<\/ins><ins> pursuant to this subsection<\/ins><ins> based upon the applicant<\/ins><ins>'s ability to reduce electric utility costs for ratepayers.<\/ins><\/p>\n<p class=section><ins>C. <\/ins><ins>No solar energy and short duration battery energy storage project shall receive a tax credit pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>2<\/ins><ins>. <\/ins><ins>Regional uptake <\/ins><ins>dashboard for approved solar energy and<\/ins><ins> short duration battery<\/ins><ins> energy<\/ins><ins> <\/ins><ins>storage projects<\/ins><ins>; reports.<\/ins><\/p>\n<p class=section><ins>A. <\/ins><ins>The <\/ins><ins>Department<\/ins><ins> shall monitor allocation of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> and publish quarterly transparency reports summarizing such <\/ins><ins>allocation<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B. The <\/ins><ins>Department<\/ins><ins> shall maintain<\/ins><ins> a public dashboard displaying regional uptake, demographic distribution<\/ins><ins> such as<\/ins><ins> low to moderate income and non-low<\/ins><ins> <\/ins><ins>to moderate income data<\/ins><ins>,<\/ins><ins> and<\/ins><ins> sectoral progress <\/ins><ins>toward<\/ins><ins> allocated targets.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 58.1-<\/ins><ins>439.12:13.<\/ins><ins> <\/ins><ins>Tax credit for investments in <\/ins><ins>solar<\/ins><ins> energy equipment<\/ins><ins> and<\/ins><ins> short duration<\/ins><ins> battery energy storage<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. For purpose<\/ins><ins>s<\/ins><ins> <\/ins><ins>of this section:<\/ins><\/p>\n<p class=section><ins>\"Eligible project costs\" means <\/ins><ins>(i) for residential projects, <\/ins><ins>costs incurred for the construction, <\/ins><ins>installation, <\/ins><ins>purchase, or lease of qualifying solar energy equipment<\/ins><ins> or qualifying energy storage <\/ins><ins>resources<\/ins><ins>, <\/ins><ins>including labor costs incurred for installation and electrical integration, <\/ins><ins>and costs incurred for permitting, inspection, engineering, and system design services necessary for such project<\/ins><ins>;<\/ins><ins> <\/ins><ins>(ii) for commercial and industrial projects, <\/ins><ins>costs incurred for such project that would otherwise be eligible for residential projects<\/ins><ins>, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection applica<\/ins><ins>tion fees, project-specific legal and financial services, site preparation,<\/ins><ins> <\/ins><ins>purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switch<\/ins><ins>gear, and transformer installation necessary for grid compliance<\/ins><ins>;<\/ins><ins> <\/ins><ins>and (iii) for utility-scale projects,<\/ins><ins> <\/ins><ins>costs incurred for such project that would otherwise be eligible for commercial and industrial projects, and high-voltage interconnection and substation construction, transmission-level engine<\/ins><ins>ering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. <\/ins><ins>\"Eligible project costs\" include<\/ins><ins>s<\/ins><ins> only costs directly associated with energy generation, storag<\/ins><ins>e, and grid integration. <\/ins><ins>\"Eligible projects costs\" does not include land acquisition unrelated to system<\/ins><ins> operation<\/ins><ins>,<\/ins><ins> or where the project is not completed<\/ins><ins>,<\/ins><ins> general property improvements, renovations, or unrelated construction<\/ins><ins>;<\/ins><ins> transmission upgrades not directly attributable to project interconnection<\/ins><ins>;<\/ins><ins> costs associated with speculative land banking or site prospecting without approved interconnection plans<\/ins><ins>;<\/ins><ins> legal fees, lob<\/ins><ins>bying, or administrative costs unrelated to project execution<\/ins><ins>;<\/ins><ins> backup generators, fossil fuel systems, or hybrid diesel-photovoltaic integrations<\/ins><ins>;<\/ins><ins> energy efficiency upgrades such as insulation<\/ins><ins> or<\/ins><ins> lighting<\/ins><ins>;<\/ins><ins> heating, ventilation, and air conditioning<\/ins><ins> <\/ins><ins>(<\/ins><ins>HVAC<\/ins><ins>)<\/ins><ins> unless integrated with<\/ins><ins> a<\/ins><ins> solar and storage projec<\/ins><ins>t and separately itemized<\/ins><ins>; or any leased residential systems<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified commercial and industrial project\"<\/ins><ins>, \"qualified project\"<\/ins><ins>,<\/ins><ins> and \"qualified residential project\"<\/ins><ins> mean the same as t<\/ins><ins>hose<\/ins><ins> term<\/ins><ins>s<\/ins><ins> <\/ins><ins>are <\/ins><ins>defined in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a>.<\/ins><\/p>\n<p class=section><ins>B. For taxable years beginning on and after January <\/ins><ins>1, 2027, but before January 1, 203<\/ins><ins>2, a taxpayer shall be allowed a <\/ins><ins>one-time, <\/ins><ins>refundable<\/ins><ins>, installment<\/ins><ins> <\/ins><ins>credit<\/ins><ins>, in the manner provided in subsection C,<\/ins><ins> against the tax levied pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-320\/'>58.1-320<\/a><\/ins><ins> or <a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-400\/'>58.1-400<\/a><\/ins><ins> in an amount equal to<\/ins><ins>:<\/ins><\/p>\n<p class=section><ins>1. <\/ins><ins>For <\/ins><ins>a <\/ins><ins>r<\/ins><ins>esidential<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project, 35 percent of eligible project costs<\/ins><ins>, not to exceed<\/ins><ins> $<\/ins><ins>6<\/ins><ins>,<\/ins><ins>0<\/ins><ins>00<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>2. <\/ins><ins>For <\/ins><ins>a <\/ins><ins>commercial and industrial<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project,<\/ins><ins> <\/ins><ins>35 percent of eligible project costs<\/ins><ins>, not to exceed $2.5 million per project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>3. For <\/ins><ins>a <\/ins><ins>utility-scale<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project, 35 percent of eligible project costs<\/ins><ins>, not to exceed $5 million per project.<\/ins><\/p>\n<p class=section><ins>The taxpayer shall submit purchase receipts with the income tax return satisfactory to the Tax Commissioner.<\/ins><\/p>\n<p class=section><ins>C. <\/ins><ins>One hundred <\/ins><ins>percent of t<\/ins><ins>he tax credit shall be earned in the year the <\/ins><ins>project<\/ins><ins> is placed in service and shall be claimed over a five-year period<\/ins><ins> in installments of<\/ins><ins> 20 percent per year. <\/ins><ins>If <\/ins><ins>the amount of the credit allowed<\/ins><ins> in any given year<\/ins><ins> exceeds the taxpayer's liability for the taxable year<\/ins><ins>, the amount that exceeds the tax liability shall be refunded by the Tax Commissioner<\/ins><ins> on behalf of the Commonwealth for 100 percent of face value within 90 days after the filing date of the income tax return on which the individual applies for the refund.<\/ins><ins> <\/ins><ins>However, no credit may be claimed for a taxable year during or after which the taxpayer disposes of, takes out of service, or moves outside of the Commonwealth any qualifying solar energy equipment. <\/ins><ins>In such instance, any remaining<\/ins><ins>, unpaid installments of<\/ins><ins> <\/ins><ins>the credit allowed to such taxpayer for such given project shall expire and become non-claimable for <\/ins><ins>such<\/ins><ins> project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>D. <\/ins><ins>The aggregate amount of credits allowed under this section shall not exceed $50 million per applicable budget cycle. Of this amount, $12.5 million shall be reserved for residential qualifying projects, and the remaining $37.5 million for commercial<\/ins><ins> and <\/ins><ins>industrial and utility-scale qualifying projects, or an amount appropriated by the General Assembly during the applicable budget cycle, with 25 percent allocated for <\/ins><ins>qualified residential projects <\/ins><ins>and 75 percent allocated for <\/ins><ins>\u00a0qualified<\/ins><ins> commercial and industrial projects<\/ins><ins>. Credits shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department of Energy and the Department. If, after nine months from the start of the taxable year, the Department of Energy determines that<\/ins><ins> the<\/ins><ins> amounts reserved for<\/ins><ins> a given qualified project<\/ins><ins> <\/ins><ins>are<\/ins><ins> unlikely to be fully allocated, the Department of Energy may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the aggregate annual credit cap. Credits shall be allocated by the Department on a first-come, first-served basis.<\/ins><\/p>\n<p class=section><ins>E. The amount of any credit attributable under this section to a partnership, limited liability company, or electing small business corporation (S <\/ins><ins>corporation) shall be allocated to the individual partners, members, or shareholders, in proportion to their ownership or interest in such entity.<\/ins><\/p>\n<p class=section><ins>F. <\/ins><ins>To qualify for the tax credit under this section, <\/ins><ins>a project <\/ins><ins>shall be installed in<\/ins><ins> compliance with <\/ins><ins>Article 4<\/ins><ins> <\/ins><ins>(\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> et seq.) of Chapter 19 of Title 45.2<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>1. <\/ins><ins>Once the taxpayer has satisfied all the requirements to the satisfaction of the<\/ins><ins> <\/ins><ins>Department<\/ins><ins> of Energy<\/ins><ins>, the <\/ins><ins>Department of Energy<\/ins><ins> shall <\/ins><ins>provide the taxpayer with a certificate <\/ins><ins>of approval for a qualified project, i<\/ins><ins>dentifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include<\/ins><ins> the<\/ins><ins> amount of eligible costs <\/ins><ins>incurred <\/ins><ins>and t<\/ins><ins>he fiscal year in which such costs were incurred <\/ins><ins>for which <\/ins><ins>the taxpayer may claim a <\/ins><ins>tax credit<\/ins><ins> pursuant to this section<\/ins><ins>.<\/ins><ins> <\/ins><ins>The <\/ins><ins>Department of Energy<\/ins><ins> shall send a copy of such certificate to the Tax Commissioner <\/ins><ins>in a reasonable time and manner as determined by the Commissioner.<\/ins><\/p>\n<p class=section><ins>2<\/ins><ins>. <\/ins><ins>The taxpayer shall retain all proof of cost documentation, including invoices and scope of work<\/ins><ins>,<\/ins><ins> and <\/ins><ins>any<\/ins><ins> certificate<\/ins><ins> of approval for a qualified project received pursuant to subdivision 1<\/ins><ins> for at least five years from the receipt of such certificate.<\/ins><\/p>\n<p class=section><ins>G. <\/ins><ins>The Tax Commissioner shall develop guidelines, in consultation with the<\/ins><ins> Department of Energy<\/ins><ins>, for claiming the credit provided by this section<\/ins><ins>, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section<\/ins><ins>. Such guidelines shall be exempt from the provisions of the Administrative Process Act (\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/2.2-4000\/'>2.2-4000<\/a> et seq.).<\/ins><\/p>\n<p class=enactcls>2. That the provisions of this act shall become effective on January 1, 2027.<\/p>",
    "catch_line": "Virginia Solar Energy and Battery Energy Storage Systems Program; established.",
    "duplicates": [
        {
            "year": 2027,
            "number": "hb1133",
            "patron": "Reid, David",
            "status": "failed committee",
            "chamber": "house",
            "catch_line": "Virginia Solar Energy and Battery Energy Storage Systems Program; established.",
            "date_introduced": "2026-01-14"
        }
    ],
    "session_id": 32,
    "word_count": 3610,
    "patron_party": "D",
    "patron_place": "Ashburn",
    "summary_hash": "d2c1b00aa4cea81e68ff55ef4f95f232",
    "patron_prefix": "Del.",
    "patron_suffix": "(D-Ashburn)",
    "status_detail": "failed committee",
    "_rsun_versions": [
        {
            "id": "1af10da02d9b6e5c2ba57ef463389e6acfa011b2a34b88a5a3667063f0cf0fde",
            "code": "HB1133",
            "bill_id": 85034,
            "source_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb1133.pdf",
            "source_date": "2026-01-14",
            "source_hash": "b7dedaf49ace29d7cbffd98280ec4d07abcd6a994a789b2295c98bf069e1ff4d",
            "source_html": "<p class=enactstm>Be it enacted by the General Assembly of Virginia:<\/p>\n<p class=enactcls>1. That the Code of Virginia is amended by adding in Chapter 19 of Title 45.2 an article numbered 4, consisting of sections numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> through <a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1922\/'>45.2-1922<\/a>, and by adding in Article 13 of Chapter 3 of Title 58.1 a section numbered <a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> as follows:<\/p>\n<p class=textctr><ins>Article 4.<\/ins><\/p>\n<p class=textctr><ins>Virginia <\/ins><ins>Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy Storage Systems<\/ins><ins> Program<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a>. Definitions.<\/ins><\/p>\n<p class=section><ins>As used in this<\/ins><ins> article<\/ins><ins>, unless the context requires a different meaning:<\/ins><\/p>\n<p class=section><ins>\"Qualified commerci<\/ins><ins>al and industrial project\" means<\/ins><ins> a <\/ins><ins>new <\/ins><ins>solar energy and short duration battery energy storage project (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>1<\/ins><ins>; (ii) <\/ins><ins>that<\/ins><ins> began <\/ins><ins>construction<\/ins><ins> on or after July 1, 2026; and <\/ins><ins>(iii) <\/ins><ins>used for <\/ins><ins>commercial or industrial use as determined by the customer rate class used to determine billing related to<\/ins><ins> such project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified<\/ins><ins> project\" means a qualified commercial and indust<\/ins><ins>rial project, qualified residential project, or a qualified utility-scale project.<\/ins><\/p>\n<p class=section><ins>\"Qualified <\/ins><ins>residential <\/ins><ins>project\" means a <\/ins><ins>new <\/ins><ins>solar energy and <\/ins><ins>short duration <\/ins><ins>battery <\/ins><ins>energy storage project<\/ins><ins> or a <\/ins><ins>new <\/ins><ins>standalone<\/ins><ins> short duration battery energy storage project<\/ins><ins> (i)<\/ins><ins> approved by the <\/ins><ins>Department <\/ins><ins>pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>; <\/ins><ins>(ii) <\/ins><ins>in service <\/ins><ins>on or after July 1, 2026<\/ins><ins>; and <\/ins><ins>(iii) <\/ins><ins>used for residential purposes<\/ins><ins> <\/ins><ins>as determined by the customer rate class used to determine billing related to <\/ins><ins>such<\/ins><ins> project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified utility-scale project\" <\/ins><ins>means a short duration battery energy storage project<\/ins><ins> added to an existing solar facility or a<\/ins><ins> new standalone short duration battery energy storage project<\/ins><ins> (i) approved by the Department pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1921\/'>45.2-1921<\/a>; (ii) that began construction on or after July 1, 2026; and (iii) used for <\/ins><ins>utility-scale<\/ins><ins> use as determined by the customer rate class used to determine billing related to such project.<\/ins><\/p>\n<p class=section><ins>\"Short duration battery energy storage project\" means the installation of battery energy storage equipment and technology that is capable of absorbing energy, storing such energy for less than 10 hours, and redelivering such energy after it has been stored.<\/ins><\/p>\n<p class=section><ins>\"Solar energy project\" means<\/ins><ins> the installation of a system of components <\/ins><ins>designed to convert solar radiation into useable thermal or electrical energy<\/ins><ins>.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1919\/'>45.2-1919<\/a>.<\/ins><ins> Virginia<\/ins><ins> <\/ins><ins>Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy <\/ins><ins>Storage<\/ins><ins> Systems<\/ins><ins> <\/ins><ins>Program<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>The Virginia Solar Energy and <\/ins><ins>Battery <\/ins><ins>Energy <\/ins><ins>Storage<\/ins><ins> Systems<\/ins><ins> <\/ins><ins>Program<\/ins><ins> is hereby <\/ins><ins>established and shall be administered by the Department <\/ins><ins>for the purposes of <\/ins><ins>(i) coordinating and supporting the development<\/ins><ins> <\/ins><ins>of<\/ins><ins> solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy <\/ins><ins>storage industries and projects<\/ins><ins> by other public or <\/ins><ins>private<\/ins><ins> entities<\/ins><ins>;<\/ins><ins> (ii) <\/ins><ins>evaluating and approving solar energy and <\/ins><ins>short duration battery<\/ins><ins> <\/ins><ins>energy storage projects as qualified projects for the purposes of<\/ins><ins> the tax credit in<\/ins><ins> \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>;<\/ins><ins> and (<\/ins><ins>iii<\/ins><ins>) determining<\/ins><ins> which<\/ins><ins> <\/ins><ins>items and services are considered<\/ins><ins> el<\/ins><ins>igible project costs for a given qualified project<\/ins><ins>. The <\/ins><ins>Department<\/ins><ins> may consult with research institutions, businesses, nonprofit organizations, and stakeholders as the <\/ins><ins>Department<\/ins><ins> deems appropriate.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>0<\/ins><ins>. Qualified <\/ins><ins>residential <\/ins><ins>project requirements.<\/ins><\/p>\n<p class=section><ins>A. The <\/ins><ins>Department<\/ins><ins> shall evaluate and approve solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage projects as qualified<\/ins><ins> residential<\/ins><ins> projects for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>residential <\/ins><ins>project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project shall be fully operational and installed in the Commonwealth<\/ins><ins> by the time specified in subdivision 4<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>2<\/ins><ins>. The project <\/ins><ins>meets the qualifications of one of the provisions of the <\/ins><ins>federal Inflation Reduction Act (P.L. <a href='https:\/\/law.lis.virginia.gov\/vacode\/117-169\/'>117-169<\/a>)<\/ins><ins> as of June 30, <\/ins><ins>2025<\/ins><ins>,<\/ins><ins> that<\/ins><ins> would have qualified for federal tax credits or other federal incentives<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>3<\/ins><ins>. The project <\/ins><ins>is in service<\/ins><ins> on or after July 1, 2026<\/ins><ins>,<\/ins><ins> but<\/ins><ins> prior to the expiration of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>,<\/ins><ins> and construction is certified to be completed within five years of <\/ins><ins>the date on which construction began<\/ins><ins>; and<\/ins><\/p>\n<p class=section><ins>4<\/ins><ins>. The energy storage portion of the project provides a minimum storage duration of up to <\/ins><ins>two<\/ins><ins> hours.<\/ins><\/p>\n<p class=section><ins>B. No solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage project shall receive a tax credit pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> without approval by the <\/ins><ins>Department<\/ins><ins> pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>1<\/ins><ins>. <\/ins><ins>Qualified <\/ins><ins>commercial, industrial, and utility-scale project<\/ins><ins> requirements.<\/ins><\/p>\n<p class=section><ins>A.<\/ins><ins> The Department shall evaluate and approve solar energy and <\/ins><ins>short duration<\/ins><ins> battery <\/ins><ins>energy storage projects as qualified <\/ins><ins>commercial and industrial <\/ins><ins>projects for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>commercial and industrial<\/ins><ins> project, the following conditions shall be met:<\/ins><\/p>\n<p class=section><ins>1. The project shall be fully operational and<\/ins><ins> <\/ins><ins>have <\/ins><ins>beg<\/ins><ins>u<\/ins><ins>n construction<\/ins><ins> in the Commonwealth by the time specified in subdivision <\/ins><ins>3<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>2. <\/ins><ins>The project meets the qualifications of one of the provisions of the federal Inflation Reduction Act (P.L. <a href='https:\/\/law.lis.virginia.gov\/vacode\/117-169\/'>117-169<\/a>) as of June 30, 2025<\/ins><ins>,<\/ins><ins> that would have qualified for federal tax credits or other federal incentives<\/ins><ins>;<\/ins><\/p>\n<p class=section><ins>3. The project <\/ins><ins>has begun construction<\/ins><ins> on or after July 1, 2026<\/ins><ins>, <\/ins><ins>but prior to the expiration of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a><\/ins><ins>,<\/ins><ins> and construction is certified to be completed within five years of<\/ins><ins> the date on which construction began<\/ins><ins>; and<\/ins><\/p>\n<p class=section><ins>4<\/ins><ins>. The energy storage portion of the project provides a minimum storage duration of up to four hours.<\/ins><\/p>\n<p class=section><ins>The Department shall <\/ins><ins>a<\/ins><ins>lso <\/ins><ins>evaluate and approve such <\/ins><ins>qualified <\/ins><ins>commercial and <\/ins><ins>industrial<\/ins><ins> <\/ins><ins>projects <\/ins><ins>pursuant to this subsection <\/ins><ins>based <\/ins><ins>upon the applicant's willingness to opt-in for the State Corporation Commission<\/ins><ins>'s<\/ins><ins> <\/ins><ins>v<\/ins><ins>irtual <\/ins><ins>p<\/ins><ins>ower<\/ins><ins> <\/ins><ins>p<\/ins><ins>lant<\/ins><ins> <\/ins><ins>p<\/ins><ins>ilot <\/ins><ins>p<\/ins><ins>rogram<\/ins><ins> established in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:16\/'>56-585.1:16<\/a><\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B. <\/ins><ins>The Department shall evaluate and approve solar energy and <\/ins><ins>short duration battery <\/ins><ins>energy storage projects as qualified <\/ins><ins>utility-scale <\/ins><ins>project<\/ins><ins>s<\/ins><ins> for the purposes of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a>. To receive approval as a qualified <\/ins><ins>utility<\/ins><ins>-scale <\/ins><ins>project, the conditions <\/ins><ins>listed in su<\/ins><ins>bdivisions<\/ins><ins> A 1 through <\/ins><ins>4<\/ins><ins> <\/ins><ins>shall be me<\/ins><ins>t. <\/ins><ins>The Department shall evaluate and approve such utility<\/ins><ins>-<\/ins><ins>scale project<\/ins><ins> pursuant to this subsection<\/ins><ins> based upon the applicant<\/ins><ins>'s ability to reduce electric utility costs for ratepayers.<\/ins><\/p>\n<p class=section><ins>C. <\/ins><ins>No solar energy and short duration battery energy storage project shall receive a tax credit pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> without approval by the Department pursuant to this section.<\/ins><\/p>\n<p class=catchln><ins>\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-192\/'>45.2-192<\/a><\/ins><ins>2<\/ins><ins>. <\/ins><ins>Regional uptake <\/ins><ins>dashboard for approved solar energy and<\/ins><ins> short duration battery<\/ins><ins> energy<\/ins><ins> <\/ins><ins>storage projects<\/ins><ins>; reports.<\/ins><\/p>\n<p class=section><ins>A. <\/ins><ins>The <\/ins><ins>Department<\/ins><ins> shall monitor allocation of the tax credit in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-439.12:13\/'>58.1-439.12:13<\/a> and publish quarterly transparency reports summarizing such <\/ins><ins>allocation<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>B. The <\/ins><ins>Department<\/ins><ins> shall maintain<\/ins><ins> a public dashboard displaying regional uptake, demographic distribution<\/ins><ins> such as<\/ins><ins> low to moderate income and non-low<\/ins><ins> <\/ins><ins>to moderate income data<\/ins><ins>,<\/ins><ins> and<\/ins><ins> sectoral progress <\/ins><ins>toward<\/ins><ins> allocated targets.<\/ins><\/p>\n<p class=catchln><ins>\u00a7 58.1-<\/ins><ins>439.12:13.<\/ins><ins> <\/ins><ins>Tax credit for investments in <\/ins><ins>solar<\/ins><ins> energy equipment<\/ins><ins> and<\/ins><ins> short duration<\/ins><ins> battery energy storage<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>A. For purpose<\/ins><ins>s<\/ins><ins> <\/ins><ins>of this section:<\/ins><\/p>\n<p class=section><ins>\"Eligible project costs\" means <\/ins><ins>(i) for residential projects, <\/ins><ins>costs incurred for the construction, <\/ins><ins>installation, <\/ins><ins>purchase, or lease of qualifying solar energy equipment<\/ins><ins> or qualifying energy storage <\/ins><ins>resources<\/ins><ins>, <\/ins><ins>including labor costs incurred for installation and electrical integration, <\/ins><ins>and costs incurred for permitting, inspection, engineering, and system design services necessary for such project<\/ins><ins>;<\/ins><ins> <\/ins><ins>(ii) for commercial and industrial projects, <\/ins><ins>costs incurred for such project that would otherwise be eligible for residential projects<\/ins><ins>, feasibility studies and resources assessments, environmental review and mitigation measures, interconnection studies and utility interconnection applica<\/ins><ins>tion fees, project-specific legal and financial services, site preparation,<\/ins><ins> <\/ins><ins>purchase or lease of land solely dedicated to project operation, onsite electrical upgrades, switch<\/ins><ins>gear, and transformer installation necessary for grid compliance<\/ins><ins>;<\/ins><ins> <\/ins><ins>and (iii) for utility-scale projects,<\/ins><ins> <\/ins><ins>costs incurred for such project that would otherwise be eligible for commercial and industrial projects, and high-voltage interconnection and substation construction, transmission-level engine<\/ins><ins>ering, permitting, and intertie infrastructure, long-term site development, roadwork, and land lease or purchase strictly for operational footprint. <\/ins><ins>\"Eligible project costs\" include<\/ins><ins>s<\/ins><ins> only costs directly associated with energy generation, storag<\/ins><ins>e, and grid integration. <\/ins><ins>\"Eligible projects costs\" does not include land acquisition unrelated to system<\/ins><ins> operation<\/ins><ins>,<\/ins><ins> or where the project is not completed<\/ins><ins>,<\/ins><ins> general property improvements, renovations, or unrelated construction<\/ins><ins>;<\/ins><ins> transmission upgrades not directly attributable to project interconnection<\/ins><ins>;<\/ins><ins> costs associated with speculative land banking or site prospecting without approved interconnection plans<\/ins><ins>;<\/ins><ins> legal fees, lob<\/ins><ins>bying, or administrative costs unrelated to project execution<\/ins><ins>;<\/ins><ins> backup generators, fossil fuel systems, or hybrid diesel-photovoltaic integrations<\/ins><ins>;<\/ins><ins> energy efficiency upgrades such as insulation<\/ins><ins> or<\/ins><ins> lighting<\/ins><ins>;<\/ins><ins> heating, ventilation, and air conditioning<\/ins><ins> <\/ins><ins>(<\/ins><ins>HVAC<\/ins><ins>)<\/ins><ins> unless integrated with<\/ins><ins> a<\/ins><ins> solar and storage projec<\/ins><ins>t and separately itemized<\/ins><ins>; or any leased residential systems<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>\"Qualified commercial and industrial project\"<\/ins><ins>, \"qualified project\"<\/ins><ins>,<\/ins><ins> and \"qualified residential project\"<\/ins><ins> mean the same as t<\/ins><ins>hose<\/ins><ins> term<\/ins><ins>s<\/ins><ins> <\/ins><ins>are <\/ins><ins>defined in \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a>.<\/ins><\/p>\n<p class=section><ins>B. For taxable years beginning on and after January <\/ins><ins>1, 2027, but before January 1, 203<\/ins><ins>2, a taxpayer shall be allowed a <\/ins><ins>one-time, <\/ins><ins>refundable<\/ins><ins>, installment<\/ins><ins> <\/ins><ins>credit<\/ins><ins>, in the manner provided in subsection C,<\/ins><ins> against the tax levied pursuant to \u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-320\/'>58.1-320<\/a><\/ins><ins> or <a href='https:\/\/law.lis.virginia.gov\/vacode\/58.1-400\/'>58.1-400<\/a><\/ins><ins> in an amount equal to<\/ins><ins>:<\/ins><\/p>\n<p class=section><ins>1. <\/ins><ins>For <\/ins><ins>a <\/ins><ins>r<\/ins><ins>esidential<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project, 35 percent of eligible project costs<\/ins><ins>, not to exceed<\/ins><ins> $<\/ins><ins>6<\/ins><ins>,<\/ins><ins>0<\/ins><ins>00<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>2. <\/ins><ins>For <\/ins><ins>a <\/ins><ins>commercial and industrial<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project,<\/ins><ins> <\/ins><ins>35 percent of eligible project costs<\/ins><ins>, not to exceed $2.5 million per project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>3. For <\/ins><ins>a <\/ins><ins>utility-scale<\/ins><ins> qualif<\/ins><ins>ied<\/ins><ins> project, 35 percent of eligible project costs<\/ins><ins>, not to exceed $5 million per project.<\/ins><\/p>\n<p class=section><ins>The taxpayer shall submit purchase receipts with the income tax return satisfactory to the Tax Commissioner.<\/ins><\/p>\n<p class=section><ins>C. <\/ins><ins>One hundred <\/ins><ins>percent of t<\/ins><ins>he tax credit shall be earned in the year the <\/ins><ins>project<\/ins><ins> is placed in service and shall be claimed over a five-year period<\/ins><ins> in installments of<\/ins><ins> 20 percent per year. <\/ins><ins>If <\/ins><ins>the amount of the credit allowed<\/ins><ins> in any given year<\/ins><ins> exceeds the taxpayer's liability for the taxable year<\/ins><ins>, the amount that exceeds the tax liability shall be refunded by the Tax Commissioner<\/ins><ins> on behalf of the Commonwealth for 100 percent of face value within 90 days after the filing date of the income tax return on which the individual applies for the refund.<\/ins><ins> <\/ins><ins>However, no credit may be claimed for a taxable year during or after which the taxpayer disposes of, takes out of service, or moves outside of the Commonwealth any qualifying solar energy equipment. <\/ins><ins>In such instance, any remaining<\/ins><ins>, unpaid installments of<\/ins><ins> <\/ins><ins>the credit allowed to such taxpayer for such given project shall expire and become non-claimable for <\/ins><ins>such<\/ins><ins> project<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>D. <\/ins><ins>The aggregate amount of credits allowed under this section shall not exceed $50 million per applicable budget cycle. Of this amount, $12.5 million shall be reserved for residential qualifying projects, and the remaining $37.5 million for commercial<\/ins><ins> and <\/ins><ins>industrial and utility-scale qualifying projects, or an amount appropriated by the General Assembly during the applicable budget cycle, with 25 percent allocated for <\/ins><ins>qualified residential projects <\/ins><ins>and 75 percent allocated for <\/ins><ins>\u00a0qualified<\/ins><ins> commercial and industrial projects<\/ins><ins>. Credits shall be allocated subject to the availability of funds within each category and tranche, upon submission of a complete application as determined by the Department of Energy and the Department. If, after nine months from the start of the taxable year, the Department of Energy determines that<\/ins><ins> the<\/ins><ins> amounts reserved for<\/ins><ins> a given qualified project<\/ins><ins> <\/ins><ins>are<\/ins><ins> unlikely to be fully allocated, the Department of Energy may reallocate any unreserved or uncommitted amounts, provided that such reallocation does not exceed the aggregate annual credit cap. Credits shall be allocated by the Department on a first-come, first-served basis.<\/ins><\/p>\n<p class=section><ins>E. The amount of any credit attributable under this section to a partnership, limited liability company, or electing small business corporation (S <\/ins><ins>corporation) shall be allocated to the individual partners, members, or shareholders, in proportion to their ownership or interest in such entity.<\/ins><\/p>\n<p class=section><ins>F. <\/ins><ins>To qualify for the tax credit under this section, <\/ins><ins>a project <\/ins><ins>shall be installed in<\/ins><ins> compliance with <\/ins><ins>Article 4<\/ins><ins> <\/ins><ins>(\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/45.2-1918\/'>45.2-1918<\/a> et seq.) of Chapter 19 of Title 45.2<\/ins><ins>.<\/ins><\/p>\n<p class=section><ins>1. <\/ins><ins>Once the taxpayer has satisfied all the requirements to the satisfaction of the<\/ins><ins> <\/ins><ins>Department<\/ins><ins> of Energy<\/ins><ins>, the <\/ins><ins>Department of Energy<\/ins><ins> shall <\/ins><ins>provide the taxpayer with a certificate <\/ins><ins>of approval for a qualified project, i<\/ins><ins>dentifying whether the project qualifies as residential, commercial and industrial, or utility-scale. Such certificate shall include<\/ins><ins> the<\/ins><ins> amount of eligible costs <\/ins><ins>incurred <\/ins><ins>and t<\/ins><ins>he fiscal year in which such costs were incurred <\/ins><ins>for which <\/ins><ins>the taxpayer may claim a <\/ins><ins>tax credit<\/ins><ins> pursuant to this section<\/ins><ins>.<\/ins><ins> <\/ins><ins>The <\/ins><ins>Department of Energy<\/ins><ins> shall send a copy of such certificate to the Tax Commissioner <\/ins><ins>in a reasonable time and manner as determined by the Commissioner.<\/ins><\/p>\n<p class=section><ins>2<\/ins><ins>. <\/ins><ins>The taxpayer shall retain all proof of cost documentation, including invoices and scope of work<\/ins><ins>,<\/ins><ins> and <\/ins><ins>any<\/ins><ins> certificate<\/ins><ins> of approval for a qualified project received pursuant to subdivision 1<\/ins><ins> for at least five years from the receipt of such certificate.<\/ins><\/p>\n<p class=section><ins>G. <\/ins><ins>The Tax Commissioner shall develop guidelines, in consultation with the<\/ins><ins> Department of Energy<\/ins><ins>, for claiming the credit provided by this section<\/ins><ins>, including establishing application procedures, reservation requirements, tranche schedules, and reallocation criteria consistent with this section<\/ins><ins>. Such guidelines shall be exempt from the provisions of the Administrative Process Act (\u00a7&nbsp;<a href='https:\/\/law.lis.virginia.gov\/vacode\/2.2-4000\/'>2.2-4000<\/a> et seq.).<\/ins><\/p>\n<p class=enactcls>2. That the provisions of this act shall become effective on January 1, 2027.<\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-01-14",
                    "number": "hb1133",
                    "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb1133.pdf"
                }
            }
        }
    ],
    "copatron_count": 1,
    "patron_address": [
        "P.O. Box 4132",
        "Ashburn",
        "VA 20148"
    ],
    "patron_chamber": "house",
    "patron_started": 2018,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "02\/11\/2026",
            "status": "Continued to 2027 in Finance (Voice Vote)",
            "date_raw": "2026-02-11",
            "vote_count": null,
            "lis_vote_id": "296401",
            "translation": "failed committee"
        },
        {
            "date": "02\/09\/2026",
            "status": "Subcommittee recommends continuing to 2027 (Voice Vote)",
            "date_raw": "2026-02-09",
            "vote_count": null,
            "lis_vote_id": "295391",
            "translation": "failed subcommittee"
        },
        {
            "date": "02\/08\/2026",
            "status": "Fiscal Impact Statement from Department of Planning and Budget (HB1133)",
            "date_raw": "2026-02-08",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/05\/2026",
            "status": "Assigned HFIN sub: Subcommittee #1",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "01\/14\/2026",
            "status": "Referred to Committee on Finance",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/14\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26105280D",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        },
        {
            "date": "01\/14\/2026",
            "status": "Committee Referral Pending",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        }
    ],
    "chief_patron_id": 431,
    "date_introduced": "2026-01-14",
    "patron_district": 28,
    "patron_shortname": "dareid",
    "committee_chamber": "house",
    "status_detail_date": "02\/11\/2026",
    "committee_shortname": "finance",
    "patron_name_formatted": "Del. David Reid (D-Loudoun)"
}