HB1065: Electric utilities; comprehensive assessments, surplus interconnection service.

signed by governor

<b>Electric utilities; surplus interconnection service sites.</b> Directs Appalachian Power and Dominion Energy Virginia to undertake a comprehensive assessment of available interconnection capacity at each such utility's existing and planned intermittent electric generation facilities located in the Commonwealth. The bill directs such utilities to establish pilot programs for energy storage resources and solar generation facilities that utilize surplus interconnection service, as defined in the bill, including a request for proposals. The bill requires such utilities to submit the results of such requests for proposals as part of their 2027 plans and petitions for approval for the development of new solar and onshore wind generation capacity, which plans are required under existing law. This bill is identical to SB 508.

Official bill page · Source: Richmond Sunlight

Ask about HB1065

Full bill text

Version CHAP1089 · 2026-04-22

Full text

Changes in this version: added text deleted text

An Act to direct certain electric utilities to undertake comprehensive assessments and establish pilot programs related to surplus interconnection service; report.

Be it enacted by the General Assembly of Virginia:

1. § 1. That each Phase I and Phase II Utility shall undertake a comprehensive assessment of available interconnection capacity at each such utility's existing and planned intermittent electric generation facilities located in the Commonwealth. Such assessment shall (i) identify all of each such utility's solar generation facilities located in the certificated service territory of the Phase I or Phase II Utility that are interconnected pursuant to an interconnection agreement or that have executed an interconnection agreement; (ii) determine the capacity interconnection rights of each such solar generation facility pursuant to the filed or executed interconnection agreement; and (iii) determine how much, if any, surplus interconnection service may be available at each such solar generation facility's point of interconnection. In conducting such assessment, a Phase I Utility shall identify at least two points of interconnection and a Phase II Utility shall identify at least five points of interconnection at which utilizing surplus interconnection service may be feasible. In conducting such assessment and identifying such points of interconnection, the Phase I and Phase II Utility shall consider relevant factors, including the relative resource value expected from utilizing surplus interconnection service at each such point of interconnection and the potential for deferring other investments in electric generation or transmission infrastructure, the proximity to areas of highly concentrated electric load, environmental impacts, impacts to the existing generation facility, and the receptivity of local permitting. Additionally, the Phase I and Phase II Utility shall identify planned intermittent electric generation facilities operating pursuant to a power purchase agreement with the Phase I or Phase II Utility and shall, to the extent such information is reasonably available, list for each such facility the capacity interconnection rights and potential surplus interconnection service that may be available at the point of interconnection for such facility. The Phase I and Phase II Utility shall submit a report to the State Corporation Commission (the Commission) no later than January 1, 2027, describing the results of the assessments conducted pursuant to this section, including the preliminary identification of specific points of interconnection as required under this section.

§ 2. That a Phase I Utility shall establish a pilot program with a capacity of up to 100 megawatts and a Phase II Utility shall establish a pilot program with a capacity of up to 500 megawatts for energy storage resources and solar generation facilities, to the extent the Commission finds solar generation facilities to be practicable, that utilize surplus interconnection service and, as part of such pilot programs, evaluate the feasibility, effectiveness, and reliability benefits of such resources and facilities utilizing surplus interconnection service. As part of such pilot programs, the Commission shall approve an independent auditor to participate in the formulation of a request for proposals, including by formulating criteria for the request for proposals and reviewing results for energy storage resources and solar generation facilities to utilize surplus interconnection service, no later than March 1, 2027. Such request for proposals shall include proposals for (i) power purchase agreement projects that seek to utilize an existing point of interconnection of a Phase I or Phase II Utility for surplus interconnection service under an additional energy storage resource system tolling agreement and (ii) projects located adjacent to a utility-owned solar generation facility that seeks to utilize surplus interconnection service at an existing point of interconnection of a Phase I or Phase II Utility for acquisition. The results of such request for proposals shall be submitted to the Commission in each such utility's 2027 application required under subdivision D 4 of § 56-585.5 of the Code of Virginia to request the necessary approvals to construct or acquire capacity from the selected resources and facilities. Nothing in this section shall prohibit a Phase I or Phase II Utility from constructing, acquiring, or procuring more than 100 megawatts or 500 megawatts, respectively, of surplus interconnection service project capacity, provided that the utility receives approval from the Commission for such additional capacity pursuant to §§ 56-580 and 56-585.1 of the Code of Virginia.

§ 3. As used in this act:

"Capacity interconnection rights" means the permissions granted to entities to connect their energy generation facilities to the electric grid system, allowing such facilities to transmit a specified amount of generation capacity to the electric grid system.

"Interconnection agreement" means an interconnection service agreement or generator interconnection agreement to interconnect to the transmission system operated by the regional transmission entity.

"Phase I Utility" and "Phase II Utility" have the same meanings as provided in subdivision A 1 of § 56-585.1 of the Code of Virginia.

"Planned intermittent generation facility" means any project for which a Phase I or Phase II Utility has signed an interconnection agreement with the regional transmission entity or a small generator interconnection agreement.

"Surplus interconnection service" means any unused or unnecessary portion of interconnection service capacity at a point of interconnection established in an interconnection agreement such that if such surplus interconnection service is utilized, the total amount of interconnection service capacity at such point of interconnection remains the same.

Legislative actions

2026-02-05 · history

Subcommittee recommends reporting with substitute

2026-02-10 · history

Reported from Labor and Commerce with substitute

2026-01-27 · history

Assigned HCL sub: Subcommittee #3

2026-04-22 · history

Reenrolled

2026-04-22 · history

Acts of Assembly Chapter text (CHAP1089)

2026-02-25 · history

Passed by for the day

2026-02-13 · history

Read second time

2026-01-25 · history

Fiscal Impact Statement from State Corporation Commission (HB1065)

2026-04-22 · history

House concurred in Governor's recommendation (65-Y 35-N 0-A)

2026-03-03 · history

Bill text as passed House and Senate (HB1065ER)

2026-04-22 · history

Approved by Governor-Chapter 1089 (effective 7/1/2026)

2026-02-25 · history

Rules suspended

2026-01-14 · history

Prefiled and ordered printed; Offered 01-14-2026 26105396D

2026-02-23 · history

Reported from Commerce and Labor

2026-04-22 · history

Reenrolled bill text (HB1065ER2)

2026-03-10 · history

Governor's Action Deadline 11:59 p.m., April 13, 2026

2026-02-25 · history

Passed by for the day Block Vote (Voice Vote)

2026-03-03 · history

Signed by Speaker

2026-03-10 · history

Enrolled Bill communicated to Governor on March 10, 2026

2026-04-22 · history

Governor's recommendation adopted

2026-02-10 · history

Reported from Labor and Commerce with substitute (16-Y 6-N)

2026-02-16 · history

Read third time and passed House (64-Y 34-N 0-A)

2026-03-03 · history

Enrolled

2026-04-22 · history

Signed by President

2026-02-05 · history

House subcommittee offered

2026-04-22 · history

Senate concurred in Governor's recommendation (22-Y 17-N 0-A)

2026-02-26 · history

Read third time

2026-02-12 · history

Read first time

2026-02-05 · history

Subcommittee recommends reporting with substitute (7-Y 1-N)

2026-02-26 · history

Passed Senate (22-Y 17-N 1-A)

2026-02-23 · history

Reported from Commerce and Labor (8-Y 5-N 1-A)

2026-02-17 · history

Referred to Committee on Commerce and Labor

2026-01-14 · history

Referred to Committee on Labor and Commerce

2026-02-13 · history

committee substitute agreed to

2026-04-22 · history

Signed by Speaker

2026-04-11 · history

Governor's recommendation received by House

2026-02-25 · history

Constitutional reading dispensed Block Vote (on 2nd reading) (40-Y 0-N 0-A)

2026-03-03 · history

Signed by President

2026-03-09 · history

Fiscal Impact Statement from State Corporation Commission (HB1065)

2026-03-02 · history

Fiscal Impact Statement from State Corporation Commission (HB1065)

2026-02-13 · history

Engrossed by House - committee substitute

2026-02-17 · history

Constitutional reading dispensed (on 1st reading)

2026-02-10 · history

Committee substitute printed 26107310D-H1

Raw source record
{
    "id": 84966,
    "url": "https:\/\/www.richmondsunlight.com\/bill\/2026\/hb1065\/",
    "tags": {
        "150702": "electricity",
        "150703": "energy storage",
        "150704": "utility",
        "150705": "environment",
        "150706": "renewable energy",
        "150707": "scc",
        "154091": "carbon emissions"
    },
    "text": [
        {
            "date": "2026-01-14",
            "number": "HB1065",
            "pdf_url": "https:\/\/downloads.richmondsunlight.com\/bills\/2026\/hb1065.pdf"
        },
        {
            "date": "2026-02-10",
            "number": "HB1065H1"
        },
        {
            "date": "2026-03-03",
            "number": "HB1065ER"
        },
        {
            "date": "2026-04-22",
            "number": "CHAP1089"
        },
        {
            "date": "2026-04-22",
            "number": "HB1065ER2"
        }
    ],
    "type": "bill",
    "year": 2026,
    "video": null,
    "number": "hb1065",
    "patron": "Hernandez, Phil",
    "status": "signed by governor",
    "chamber": "house",
    "changes": null,
    "outcome": "passed",
    "related": [
        {
            "id": 85512,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 7,
            "number": "sb508",
            "status": "signed by governor",
            "catch_line": "Electric utilities; comprehensive assessments, surplus interconnection service.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 86072,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 5,
            "number": "hb1512",
            "status": "failed committee",
            "catch_line": "Electric utilities; renewable energy standard eligible sources.",
            "date_introduced": "January 23, 2026"
        },
        {
            "id": 85469,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "sb470",
            "status": "incorporated",
            "catch_line": "Electric utilities; renewable portfolio standard program, zero-carbon electricity, etc.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 85311,
            "name": "Finance",
            "year": 2026,
            "count": 4,
            "number": "sb333",
            "status": "signed by governor",
            "catch_line": "Remediated Mine Gas Grant Program; established, report.",
            "date_introduced": "January 13, 2026"
        },
        {
            "id": 85951,
            "name": "Commerce and Labor",
            "year": 2026,
            "count": 4,
            "number": "hb1445",
            "status": "failed committee",
            "catch_line": "Electric utilities; renewable energy portfolio standard eligible sources, etc.",
            "date_introduced": "January 22, 2026"
        }
    ],
    "summary": "<b>Electric utilities; surplus interconnection service sites.<\/b> Directs Appalachian Power and Dominion Energy Virginia to undertake a comprehensive assessment of available interconnection capacity at each such utility's existing and planned intermittent electric generation facilities located in the Commonwealth. The bill directs such utilities to establish pilot programs for energy storage resources and solar generation facilities that utilize surplus interconnection service, as defined in the bill, including a request for proposals. The bill requires such utilities to submit the results of such requests for proposals as part of their 2027 plans and petitions for approval for the development of new solar and onshore wind generation capacity, which plans are required under existing law. This bill is identical to SB 508.",
    "version": "CHAP1089",
    "copatron": [
        {
            "shortname": "bganthony",
            "partisanship": 12,
            "name_formatted": "Del. Bonita Anthony (D-Norfolk)"
        },
        {
            "shortname": "dllbolling",
            "partisanship": 13,
            "name_formatted": "Del. Destiny LeVere Bolling (D-Glen Allen)"
        },
        {
            "shortname": "bbcarr",
            "partisanship": 29,
            "name_formatted": "Del. Betsy Carr (D-Richmond)"
        },
        {
            "shortname": "neclark",
            "partisanship": 13,
            "name_formatted": "Del. Nadarius Clark (D-Portsmouth)"
        },
        {
            "shortname": "rccousins",
            "partisanship": 16,
            "name_formatted": "Del. Rae Cousins (D-Richmond)"
        },
        {
            "shortname": "kkltran",
            "partisanship": 17,
            "name_formatted": "Del. Kathy Tran (D-Springfield)"
        }
    ],
    "committee": "Commerce and Labor",
    "full_text": "<p class=\"ldtitle\">An Act to direct certain electric utilities to undertake comprehensive assessments and establish pilot programs related to surplus interconnection service; report.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"textbl\"><strong>1. <\/strong><em class=\"new\">\u00a7 1. That each Phase I and Phase II Utility shall undertake a comprehensive assessment of available interconnection capacity at each such utility's existing and planned intermittent electric generation facilities located in the Commonwealth. Such assessment shall (i) identify all of each such utility's solar generation facilities located in the certificated service territory of the Phase I or Phase II Utility that are interconnected pursuant to an interconnection agreement or that have executed an interconnection agreement; (ii) determine the capacity interconnection rights of each such solar generation facility pursuant to the filed or executed interconnection agreement; and (iii) determine how much, if any, surplus interconnection service may be available at each such solar generation facility's point of interconnection. In conducting such assessment, a Phase I Utility shall identify at least two points of interconnection and a Phase II Utility shall identify at least five points of interconnection at which utilizing surplus interconnection service may be feasible. In conducting such assessment and identifying such points of interconnection, the Phase I and Phase II Utility shall consider relevant factors, including the relative resource value expected from utilizing surplus interconnection service at each such point of interconnection and the potential for deferring other investments in electric generation or transmission infrastructure, the proximity to areas of highly concentrated electric load, environmental impacts, impacts to the existing generation facility, and the receptivity of local permitting. Additionally, the Phase I and Phase II Utility shall identify planned intermittent electric generation facilities operating pursuant to a power purchase agreement with the Phase I or Phase II Utility and shall, to the extent such information is reasonably available, list for each such facility the capacity interconnection rights and potential surplus interconnection service that may be available at the point of interconnection for such facility. The Phase I and Phase II Utility shall submit a report to the State Corporation Commission (the Commission) no later than January 1, 2027, describing the results of the assessments conducted pursuant to this section, including the preliminary identification of specific points of interconnection as required under this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 2. That a Phase I Utility shall establish a pilot program with a capacity of <em>up to <\/ins>100 megawatts and a Phase II Utility shall establish a pilot program with a capacity of <em>up to<\/ins> 500 megawatts for energy storage resources and solar generation facilities, to the extent the Commission finds solar generation facilities to be practicable, that utilize surplus interconnection service and, as part of such pilot programs, evaluate the feasibility, effectiveness, and reliability benefits of such resources and facilities utilizing surplus interconnection service. As part of such pilot programs, the Commission shall approve an independent auditor to participate in the formulation of a request for proposals, including by formulating criteria for the request for proposals and reviewing results for energy storage resources and solar generation facilities to utilize surplus interconnection service, no later than March 1, 2027. Such request for proposals shall include proposals for (i) power purchase agreement projects that seek to utilize an existing point of interconnection of a Phase I or Phase II Utility for surplus interconnection service under an additional energy storage resource system tolling agreement and (ii) projects located adjacent to a utility-owned solar generation facility that seeks to utilize surplus interconnection service at an existing point of interconnection of a Phase I or Phase II Utility for acquisition. The results of such request for proposals shall be submitted to the Commission in each such utility's 2027 application required under subdivision D 4 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia to request the necessary approvals to construct or acquire capacity from the selected resources and facilities. Nothing in this section shall prohibit a Phase I or Phase II Utility from constructing, acquiring, or procuring more than 100 megawatts or 500 megawatts, respectively, of surplus interconnection service project capacity, provided that the utility receives approval from the Commission for such additional capacity pursuant to \u00a7\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580\/'>56-580<\/a> and <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 3. As used in this act:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Capacity interconnection rights\" means the permissions granted to entities to connect their energy generation facilities to the electric grid system, allowing such facilities to transmit a specified amount of generation capacity to the electric grid system.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Interconnection agreement\" means an interconnection service agreement or generator interconnection agreement to interconnect to the transmission system operated by the regional transmission entity.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Phase I Utility\" and \"Phase II Utility\" have the same meanings as provided in subdivision A 1 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Planned intermittent generation facility\" means any project for which a Phase I or Phase II Utility has signed an interconnection agreement with the regional transmission entity or a small generator interconnection agreement.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Surplus interconnection service\" means any unused or unnecessary portion of interconnection service capacity at a point of interconnection established in an interconnection agreement such that if such surplus interconnection service is utilized, the total amount of interconnection service capacity at such point of interconnection remains the same.<\/ins><\/p>",
    "catch_line": "Electric utilities; comprehensive assessments, surplus interconnection service.",
    "duplicates": null,
    "session_id": 32,
    "word_count": 968,
    "patron_party": "D",
    "patron_place": "Norfolk",
    "summary_hash": "1007dc71b710b54512322f15c1b62f36",
    "patron_prefix": "Del.",
    "patron_suffix": "(D-Norfolk)",
    "status_detail": "signed by governor",
    "_rsun_versions": [
        {
            "id": "2316edc1a3c2b5bb9efc89e7441feb3ca614288fb3030c031c7de9e6ad066cf2",
            "code": "CHAP1089",
            "bill_id": 84966,
            "source_url": null,
            "source_date": "2026-04-22",
            "source_hash": "dc7c20bb329c2249ef921b1b4a090765f5b1c490a5ca13bec31ec481512cf5fa",
            "source_html": "<p class=\"ldtitle\">An Act to direct certain electric utilities to undertake comprehensive assessments and establish pilot programs related to surplus interconnection service; report.<\/p><p class=\"enactstm\">Be it enacted by the General Assembly of Virginia:<\/p><p class=\"textbl\"><strong>1. <\/strong><em class=\"new\">\u00a7 1. That each Phase I and Phase II Utility shall undertake a comprehensive assessment of available interconnection capacity at each such utility's existing and planned intermittent electric generation facilities located in the Commonwealth. Such assessment shall (i) identify all of each such utility's solar generation facilities located in the certificated service territory of the Phase I or Phase II Utility that are interconnected pursuant to an interconnection agreement or that have executed an interconnection agreement; (ii) determine the capacity interconnection rights of each such solar generation facility pursuant to the filed or executed interconnection agreement; and (iii) determine how much, if any, surplus interconnection service may be available at each such solar generation facility's point of interconnection. In conducting such assessment, a Phase I Utility shall identify at least two points of interconnection and a Phase II Utility shall identify at least five points of interconnection at which utilizing surplus interconnection service may be feasible. In conducting such assessment and identifying such points of interconnection, the Phase I and Phase II Utility shall consider relevant factors, including the relative resource value expected from utilizing surplus interconnection service at each such point of interconnection and the potential for deferring other investments in electric generation or transmission infrastructure, the proximity to areas of highly concentrated electric load, environmental impacts, impacts to the existing generation facility, and the receptivity of local permitting. Additionally, the Phase I and Phase II Utility shall identify planned intermittent electric generation facilities operating pursuant to a power purchase agreement with the Phase I or Phase II Utility and shall, to the extent such information is reasonably available, list for each such facility the capacity interconnection rights and potential surplus interconnection service that may be available at the point of interconnection for such facility. The Phase I and Phase II Utility shall submit a report to the State Corporation Commission (the Commission) no later than January 1, 2027, describing the results of the assessments conducted pursuant to this section, including the preliminary identification of specific points of interconnection as required under this section.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 2. That a Phase I Utility shall establish a pilot program with a capacity of <em>up to <\/ins>100 megawatts and a Phase II Utility shall establish a pilot program with a capacity of <em>up to<\/ins> 500 megawatts for energy storage resources and solar generation facilities, to the extent the Commission finds solar generation facilities to be practicable, that utilize surplus interconnection service and, as part of such pilot programs, evaluate the feasibility, effectiveness, and reliability benefits of such resources and facilities utilizing surplus interconnection service. As part of such pilot programs, the Commission shall approve an independent auditor to participate in the formulation of a request for proposals, including by formulating criteria for the request for proposals and reviewing results for energy storage resources and solar generation facilities to utilize surplus interconnection service, no later than March 1, 2027. Such request for proposals shall include proposals for (i) power purchase agreement projects that seek to utilize an existing point of interconnection of a Phase I or Phase II Utility for surplus interconnection service under an additional energy storage resource system tolling agreement and (ii) projects located adjacent to a utility-owned solar generation facility that seeks to utilize surplus interconnection service at an existing point of interconnection of a Phase I or Phase II Utility for acquisition. The results of such request for proposals shall be submitted to the Commission in each such utility's 2027 application required under subdivision D 4 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.5\/'>56-585.5<\/a> of the Code of Virginia to request the necessary approvals to construct or acquire capacity from the selected resources and facilities. Nothing in this section shall prohibit a Phase I or Phase II Utility from constructing, acquiring, or procuring more than 100 megawatts or 500 megawatts, respectively, of surplus interconnection service project capacity, provided that the utility receives approval from the Commission for such additional capacity pursuant to \u00a7\u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-580\/'>56-580<\/a> and <a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p><p class=\"section\"><em class=\"new\">\u00a7 3. As used in this act:<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Capacity interconnection rights\" means the permissions granted to entities to connect their energy generation facilities to the electric grid system, allowing such facilities to transmit a specified amount of generation capacity to the electric grid system.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Interconnection agreement\" means an interconnection service agreement or generator interconnection agreement to interconnect to the transmission system operated by the regional transmission entity.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Phase I Utility\" and \"Phase II Utility\" have the same meanings as provided in subdivision A 1 of \u00a7\u00a0<a href='https:\/\/law.lis.virginia.gov\/vacode\/56-585.1\/'>56-585.1<\/a> of the Code of Virginia.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Planned intermittent generation facility\" means any project for which a Phase I or Phase II Utility has signed an interconnection agreement with the regional transmission entity or a small generator interconnection agreement.<\/ins><\/p><p class=\"section\"><em class=\"new\">\"Surplus interconnection service\" means any unused or unnecessary portion of interconnection service capacity at a point of interconnection established in an interconnection agreement such that if such surplus interconnection service is utilized, the total amount of interconnection service capacity at such point of interconnection remains the same.<\/ins><\/p>",
            "source_metadata": {
                "bodyAssociation": "archive-reported-current-version",
                "archiveReference": {
                    "date": "2026-04-22",
                    "number": "CHAP1089"
                }
            }
        }
    ],
    "copatron_count": 6,
    "patron_address": [
        "P.O. Box 8927",
        "Norfolk",
        "VA 23503"
    ],
    "patron_chamber": "house",
    "patron_started": 2024,
    "session_lis_id": 261,
    "status_history": [
        {
            "date": "04\/22\/2026",
            "status": "Acts of Assembly Chapter text (CHAP1089)",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "04\/22\/2026",
            "status": "Approved by Governor-Chapter 1089 (effective 7\/1\/2026)",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "signed by governor"
        },
        {
            "date": "04\/22\/2026",
            "status": "Signed by President",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed"
        },
        {
            "date": "04\/22\/2026",
            "status": "Signed by Speaker",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "04\/22\/2026",
            "status": "Reenrolled bill text (HB1065ER2)",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "04\/22\/2026",
            "status": "Reenrolled",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "04\/22\/2026",
            "status": "Governor's recommendation adopted",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "signed by governor"
        },
        {
            "date": "04\/22\/2026",
            "status": "Senate concurred in Governor's recommendation (22-Y 17-N 0-A)",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": "302578",
            "translation": null
        },
        {
            "date": "04\/22\/2026",
            "status": "House concurred in Governor's recommendation (65-Y 35-N 0-A)",
            "date_raw": "2026-04-22",
            "vote_count": null,
            "lis_vote_id": "302414",
            "translation": null
        },
        {
            "date": "04\/11\/2026",
            "status": "Governor's recommendation received by House",
            "date_raw": "2026-04-11",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Governor's Action Deadline 11:59 p.m., April 13, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/10\/2026",
            "status": "Enrolled Bill communicated to Governor on March 10, 2026",
            "date_raw": "2026-03-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/09\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB1065)",
            "date_raw": "2026-03-09",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/03\/2026",
            "status": "Signed by President",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed"
        },
        {
            "date": "03\/03\/2026",
            "status": "Signed by Speaker",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/03\/2026",
            "status": "Bill text as passed House and Senate (HB1065ER)",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/03\/2026",
            "status": "Enrolled",
            "date_raw": "2026-03-03",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "03\/02\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB1065)",
            "date_raw": "2026-03-02",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/26\/2026",
            "status": "Passed Senate (22-Y 17-N 1-A)",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": "299267",
            "translation": "passed senate"
        },
        {
            "date": "02\/26\/2026",
            "status": "Read third time",
            "date_raw": "2026-02-26",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Passed by for the day",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Passed by for the day  Block Vote (Voice Vote)",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": "298921",
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Constitutional reading dispensed  Block Vote (on 2nd reading) (40-Y 0-N 0-A)",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": "298920",
            "translation": null
        },
        {
            "date": "02\/25\/2026",
            "status": "Rules suspended",
            "date_raw": "2026-02-25",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/23\/2026",
            "status": "Reported from Commerce and Labor (8-Y 5-N 1-A)",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": "298541",
            "translation": "passed committee"
        },
        {
            "date": "02\/23\/2026",
            "status": "Reported from Commerce and Labor",
            "date_raw": "2026-02-23",
            "vote_count": null,
            "lis_vote_id": "298541",
            "translation": "passed committee"
        },
        {
            "date": "02\/17\/2026",
            "status": "Referred to Committee on Commerce and Labor",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "02\/17\/2026",
            "status": "Constitutional reading dispensed (on 1st reading)",
            "date_raw": "2026-02-17",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/16\/2026",
            "status": "Read third time and passed House (64-Y 34-N 0-A)",
            "date_raw": "2026-02-16",
            "vote_count": null,
            "lis_vote_id": "297538",
            "translation": "passed house"
        },
        {
            "date": "02\/13\/2026",
            "status": "Engrossed by House - committee substitute",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "committee substitute agreed to",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/13\/2026",
            "status": "Read second time",
            "date_raw": "2026-02-13",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/12\/2026",
            "status": "Read first time",
            "date_raw": "2026-02-12",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Committee substitute printed 26107310D-H1",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "02\/10\/2026",
            "status": "Reported from Labor and Commerce with substitute (16-Y 6-N)",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": "296011",
            "translation": "passed committee"
        },
        {
            "date": "02\/10\/2026",
            "status": "Reported from Labor and Commerce with substitute",
            "date_raw": "2026-02-10",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed committee"
        },
        {
            "date": "02\/05\/2026",
            "status": "Subcommittee recommends reporting with substitute (7-Y 1-N)",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": "295030",
            "translation": "passed subcommittee"
        },
        {
            "date": "02\/05\/2026",
            "status": "Subcommittee recommends reporting with substitute",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "passed subcommittee"
        },
        {
            "date": "02\/05\/2026",
            "status": "House subcommittee offered",
            "date_raw": "2026-02-05",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/27\/2026",
            "status": "Assigned HCL sub: Subcommittee #3",
            "date_raw": "2026-01-27",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in subcommittee"
        },
        {
            "date": "01\/25\/2026",
            "status": "Fiscal Impact Statement from State Corporation Commission (HB1065)",
            "date_raw": "2026-01-25",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": null
        },
        {
            "date": "01\/14\/2026",
            "status": "Referred to Committee on Labor and Commerce",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "in committee"
        },
        {
            "date": "01\/14\/2026",
            "status": "Prefiled and ordered printed; Offered 01-14-2026 26105396D",
            "date_raw": "2026-01-14",
            "vote_count": null,
            "lis_vote_id": null,
            "translation": "introduced"
        }
    ],
    "chief_patron_id": 509,
    "date_introduced": "2026-01-14",
    "patron_district": 94,
    "patron_shortname": "pmhernandez",
    "committee_chamber": "senate",
    "status_detail_date": "04\/22\/2026",
    "committee_shortname": "commerce",
    "patron_name_formatted": "Del. Phil Hernandez (D-Norfolk)"
}